Steam power plant turbine and control method for operating at low load

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,617,874
App. No.
13/919,259
Granted
Apr 11, 2017
Kind
B2
Abstract

In a system for effecting pressure control in a thermal power plant operated at low load connected fluidly in series, a relief conduit is disclosed herein. The relief conduit selectively transfers steam from a cold reheat conduit to the second extraction conduit. The plant further includes a boiler, a high-pressure turbine, an intermediate pressure turbine, a low pressure turbine, a main steam conduit for feeding steam from the boiler to an inlet of the high pressure turbine, a cold reheat conduit for feeding steam from an outlet of the high-pressure turbine through a reheat flow path in the boiler, and a first and second high pressure heaters. A first extraction conduit connects the cold reheat conduit to a first high pressure heater to transfer heat, and a second extraction conduit connects the intermediate pressure turbine to the second high pressure heater, to transfer heat.

Claims (26)

1. A steam turbine generation apparatus comprising:

a boiler that burns fossil fuel to generate steam,

a steam turbine system including a high-pressure turbine, an intermediate pressure turbine, and a low pressure turbine which are driven by steam generated in the boiler,

a main steam conduit that feeds steam from the boiler to an inlet of the high pressure turbine,

a cold reheat conduit that feeds steam from an outlet of the high-pressure turbine through a reheat flow path in the boiler, the cold reheat conduit operatively connected to a hot reheat conduit that feeds reheat steam to an inlet of intermediate pressure turbine,

a crossover conduit that feeds steam from an outlet of the intermediate turbine to a low pressure turbine,

a low pressure exhaust conduit operatively connected to a feedwater conduit, the feedwater conduit providing feedwater in series though a first and second high pressure heaters prior to sending feedwater through the boiler to produce steam into the main steam conduit,

a first extraction conduit operatively connecting the cold reheat conduit to the first high pressure heater, wherein the first high pressure heater is operatively associated with the feedwater conduit to transfer heat,

a second extraction conduit operatively connecting the intermediate pressure turbine directly to the second high pressure heater,

wherein the second high pressure heater is operatively associated with the feedwater conduit to transfer heat, the second high pressure heater positioned upstream of the first high pressure heater, and

a relief conduit operatively connecting the cold reheat conduit to the second extraction conduit at a location along the second extraction conduit upstream from an outlet of the second extraction conduit through which steam passes to enter the second high pressure heater, the relief conduit selectively transferring steam from the cold reheat conduit to the second extraction conduit for direct passage to the second high pressure heater to reduce the temperature and pressure of the steam passing through the hot reheat conduit.

2. The apparatus of claim 1 wherein the intermediate pressure turbine is a partial intermediate pressure turbine.

3. The apparatus of claim 1 wherein the relief conduit comprises a relief valve.

4. The apparatus of claim 1 further comprising a bypass conduit, wherein the bypass conduit is operatively connected to the feedwater conduit so as to selectively allow feedwater to bypass the second high pressure heater and load the first high pressure heater.

5. The apparatus of claim 1 further comprising

a bypass conduit,

wherein the bypass conduit is operatively connected to the feedwater conduit so as to selectively allow feedwater to bypass the second high pressure heater and load the first high pressure heater,

wherein the intermediate pressure turbine is a partial intermediate pressure turbine.

6. The apparatus of claim 1 , wherein:

the relief conduit extends directly between the cold reheat conduit and the second extraction conduit.

7. The apparatus of claim 1 , wherein:

the relief conduit is configured to transfer steam from the cold reheat conduit to the second extraction conduit for downstream passage through the second extraction conduit and to the second high pressure heater.

8. A method for effecting temperature and pressure control of a hot reheat conduit in a thermal power plant including a boiler, a high-pressure turbine, an intermediate pressure turbine, and a low pressure turbine which are driven by steam generated in the boiler, the method comprising:

reducing a swallowing capacity of the intermediate pressure turbine in order to increase the temperature and pressure of a hot reheat conduit, and

providing a relief conduit that connects a cold reheat conduit to a second extraction conduit at a location along the second extraction conduit upstream from an outlet of the second extraction conduit, the outlet of the second extraction conduit being directly connected to a high pressure heater for heating feedwater in a feedwater conduit, the relief conduit being configured to selectively transfer steam from the cold reheat conduit to the second extraction conduit for passage directly to the high pressure heater.

9. The method of claim 8 further comprising providing a bypass conduit to selectively bypass a second high pressure heater and load a first high pressure heater in order to increase the amount of heat extracted from steam passing through the cold reheat conduit.

Assignments (4)
CORRECTIVE ASSIGNMENT TO CORRECT THE RECEIVING PARTY'S ADDRESS PREVIOUSLY RECORDED ON REEL 71474 FRAME 283. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jun 30, 2025
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: GE VERNOVA INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 071771/0479 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 3, 2025
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: GE VERNOVA INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 071474/0283 →
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 21, 2013
From: HELLWEG, STEFAN; SCH?LE, VOLKER; BAUER, MANFRED
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 031443/0245 →