IP Library Patent Application 13931130
Patent Application
App. No. 13/931,130

CHARGE/DISCHARGE CONTROL SYSTEM FOR STORAGE BATTERY ASSEMBLY

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
13/931,130
Abstract

A charge/discharge control system for a storage battery assembly includes a plurality of battery blocks each connected in parallel to a charge/discharge main bus via protective resistors, and a plurality of switches connected in parallel to the protective resistors, between the charge/discharge main bus and the plurality of battery blocks. In a state in which the plurality of switches are all on, when one of the plurality of switches turns off and a parallel off occurs, a charge/discharge control device performs processing for throttling the charge/discharge power, that flows to the charge/discharge main bus, in accordance with a pre-set reference. When the parallel off is canceled by the throttling processing, the charge/discharge power is restored.

Claims (11)

1 . A charge/discharge control system for a storage battery assembly, comprising:

a plurality of battery blocks connected in parallel with each other to a bus line for charging/discharging;

a plurality of resistive elements which correspond to the plurality of battery blocks respectively and are arranged to be connected to the bus line;

a plurality of switches which correspond to the plurality of battery blocks respectively and are connected to the bus line; to be parallel with the resistive elements, and under a predetermined condition, turn on when a voltage difference between the plurality of battery blocks decreases, and turn off when the voltage difference increases; and

a control part which, in a case where one of the plurality of switches turns off after the plurality of switches are all on, performs processing of throttling a charge/discharge power transmitted/received through the bus line according to a predetermined throttling reference.

2 . The charge/discharge control system for the storage battery assembly according to claim 1 , wherein

the control part performs restoration processing in which the charge/discharge power is restored according to a predetermined restoration reference when the voltage difference between the plurality of battery blocks decreases and the switch that has been turned off turns on again after the throttling processing.

3 . The charge/discharge control system for the storage battery assembly according to claim 2 , wherein

the plurality of switches are, as the predetermined condition, sequentially turned on according to a predetermined order when the voltage difference between the plurality of battery blocks comes to be a predetermined threshold voltage difference or less, and are turned off when the voltage difference between the plurality of battery blocks exceeds the threshold voltage difference.

4 . The charge/discharge control system for the storage battery assembly according to claim 3 , wherein,

when the voltage difference between the plurality of battery blocks decreases to be a restoration threshold voltage difference or less, which is predetermined as a value smaller than the threshold voltage difference, the throttling processing is stopped and the switch that has been turned off is turned on again.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 24, 2015
From: SANYO ELECTRIC CO., LTD.
To: PANASONIC CORPORATION
Reel/Frame 035071/0276 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 24, 2015
From: PANASONIC CORPORATION
To: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.
Reel/Frame 035071/0508 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 1, 2013
From: OKUDA, YASUO
To: SANYO ELECTRIC CO., LTD.
Reel/Frame 030718/0777 →