IP Library Granted Patent US 9,926,783
Granted Patent B2
US 9,926,783 · App. 13/936,856 · Granted Mar 27, 2018

Apparatus and methods for cemented multi-zone completions

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,926,783
App. No.
13/936,856
Granted
Mar 27, 2018
Kind
B2
Abstract

A method and apparatus for determining a parameter of a production fluid in a wellbore by providing an initially blocked isolated communication path between a sensor and an aperture formed in a sleeve. The isolated communication path is subsequently unblocked to allow measurements of the parameter of the production fluid.

Claims (45)

1. A method for determining a parameter of a production fluid in a wellbore, comprising:

attaching a plurality of sensors to a string of tubing equipped with a plurality of sleeves;

providing an isolated communication path for fluid communication between at least one of the plurality of sensors and at least one of a plurality of apertures formed in the sleeves, the apertures initially closed and the isolated communication path initially blocked, wherein the isolated communication path is initially blocked by a removable seal positioned between a bore of the string of tubing and the plurality of sensors to initially block fluid communication therebetween;

inserting the string of tubing into the wellbore;

cementing the string of tubing in the wellbore;

remotely opening the apertures in the sleeves;

injecting a fracking fluid into a formation adjacent the wellbore via the apertures, thereby perforating the cement;

unblocking the isolated communication path; and

measuring the parameter of the production fluid adjacent the apertures.

2. The method of claim 1 , further comprising measuring a parameter of the fracking fluid.

3. The method of claim 1 , wherein the fracking fluid injected into the formation causes the unblocking of the isolated communication path.

4. The method of claim 1 , wherein remotely opening the apertures causes the unblocking of the isolated communication path.

5. The method of claim 1 , wherein measuring the parameter of the production fluid adjacent the apertures includes measuring the production fluid from an inner diameter of a mandrel coupled to the string of tubing.

6. The method of claim 1 , wherein at least one of the sensors is attached to a mandrel.

7. The method of claim 1 , wherein at least one of the sensors is attached to a carrier.

8. The method of claim 1 , wherein the plurality of sensors are coupled to a sensing cable positioned along an outer diameter of the string of tubing.

9. The method of claim 1 , wherein unblocking the isolated communication path comprises dislodging the removable seal from the isolated communication path in response to injecting the fracking fluid.

10. The method of claim 1 , wherein unblocking the isolated communication path comprises dislodging the removable plug from the communication path in response to remotely opening the apertures in the sleeve.

11. A tool string for determining a parameter of a production fluid in a wellbore, comprising:

a tubing equipped with a sleeve, wherein at least one aperture is formed in the sleeve;

a sensor on a sensing cable, wherein the sensor is spaced from the at least one aperture;

a sensor container, wherein the sensor is at least partially enclosed in the sensor container; and

an isolated communication path that spans a predetermined distance from the sensor container to the nearest at least one aperture, wherein the isolated communication path includes a removable seal positioned between a bore of the tubing and the sensor to initially block fluid communication therebetween.

12. The tool string of claim 11 , wherein the sensor includes a fiber optic sensor.

13. The tool string of claim 11 , wherein the sensor container is on a mandrel.

14. The tool string of claim 13 , wherein the isolated communication path spans a predetermined distance from the sensor container to a port on the mandrel.

15. The tool string of claim 14 , wherein the port includes the removable seal.

16. The tool string of claim 11 , wherein the sensor container is on a carrier.

17. The tool string of claim 16 , wherein the isolated communication path spans a predetermined distance from the sensor container to a port on a mandrel.

18. The tool string of claim 17 , wherein the port includes the removable seal.

19. A container for determining a parameter of a production fluid in a wellbore, comprising:

a container cover and a container base;

a port on the container;

at least one fluid channel creating fluid communication between the port and a compartment in the container, the at least one fluid channel formed in the container cover;

an isolated communication path coupled to the port, wherein the isolated communication path is blocked;

a sensor at least partially enclosed by the container cover and the container base, wherein the sensor is isolated from external fluids; and

a groove formed in the container cover or the container base to accommodate a sensor cable therethrough for connection to the sensor.

20. The container of claim 19 , wherein the port is located on the container cover.

21. The container of claim 19 , further including a test port.

22. The container of claim 19 , wherein the compartment is sealed by a seal material.

23. The container of claim 19 , further comprising a second groove formed in the container cover or the container base to accommodate egress of the sensor cable from the container.

24. The container of claim 19 , wherein the container cover is fixedly attached to the container base.

25. The container of claim 24 , wherein the container cover is fixedly attached to the container base by bolts, and wherein the groove to accommodate the sensor cable is formed at an interface of the container cover and the container base.

26. The container of claim 19 , further comprising one or more seals at an interface of the container cover and the container base.

27. The container of claim 26 , wherein the one or more seals are disposed around the sensing cable.

Assignments (9)
PATENT SECURITY INTEREST ASSIGNMENT AGREEMENT Recorded Apr 26, 2023
From: DEUTSCHE BANK TRUST COMPANY AMERICAS
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 063470/0629 →
SECURITY INTEREST Recorded Oct 1, 2021
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; WEATHERFORD U.K. LIMITED
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 057683/0706 →
RELEASE OF SECURITY INTEREST Recorded Oct 1, 2021
From: WILMINGTON TRUST, NATIONAL ASSOCIATION
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
Reel/Frame 057683/0423 →
SECURITY INTEREST Recorded Aug 28, 2020
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 054288/0302 →
RELEASE OF SECURITY INTEREST Recorded Aug 28, 2020
From: WELLS FARGO BANK, NATIONAL ASSOCIATION
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
Reel/Frame 053838/0323 →
SECURITY INTEREST Recorded Dec 26, 2019
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: DEUTSCHE BANK TRUST COMPANY AMERICAS, AS ADMINISTRATIVE AGENT
Reel/Frame 051419/0140 →
SECURITY INTEREST Recorded Dec 18, 2019
From: WEATHERFORD TECHNOLOGY HOLDINGS LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY INC.; PRECISION ENERGY SERVICES INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: WELLS FARGO BANK NATIONAL ASSOCIATION AS AGENT
Reel/Frame 051891/0089 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 3, 2016
From: WEATHERFORD/LAMB, INC.
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC
Reel/Frame 037653/0604 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 15, 2013
From: LEMBCKE, JEFFREY JOHN; PARKER, CHARLES D.; KIDDY, JASON SCOTT; GREENAN, IAIN
To: WEATHERFORD/LAMB, INC.
Reel/Frame 031021/0107 →