IP Library Granted Patent US 9,037,272
Granted Patent B2
US 9,037,272 · App. 13/939,963 · Granted May 19, 2015

Auto-tuning electro-hydraulic valve

Inventors: QingHui Yuan (Osseo, MN); Christy Schottler (Brooklyn Park, MN); Wade Gehlhoff (Shakopee, MN); Hong Singhania (Prior Lake, MN)
Assignee: Eaton Corporation
G05B13/021F15B13/0433F15B13/16G05D7/0652
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,037,272
App. No.
13/939,963
Granted
May 19, 2015
Kind
B2
Abstract

A flow control valve includes a housing that includes a fluid inlet, a fluid outlet, a first work port and a second work port. The housing defines a spool bore and a pilot spool bore. A main stage spool is disposed in the spool bore. A pilot stage spool is disposed in the pilot spool bore. The pilot stage spool is in selective fluid communication with the main stage spool. A microprocessor includes a controller having a restricted structured controller and a compensation controller. Outputs of the restricted structured controller and the compensation controller are summed to form an electrical signal that is communicated to the pilot stage spool.

Claims (13)

1. A method for optimizing a control parameter of a microprocessor including a restricted structured controller, the method comprising:

evaluating a cost function at a first time interval of a first iteration with the controller;

calculating a control parameter with the controller;

evaluating the cost function at a second time interval of the first iteration with the controller;

calculating the control parameter with the controller;

evaluating the cost function at a third time interval of the first iteration with the controller; and

performing an iteration analysis with the controller, wherein the iteration analysis compares the first iteration to a previous iteration and sets the value of control parameter to one of the value of the control parameter calculated in the first iteration and the value of the control parameter calculated in the previous iteration.

2. The method of claim 1 , wherein the iteration analysis compares the cost function at the third time interval of the first iteration to a cost function at a third time interval of the previous iteration.

3. The method of claim 1 , wherein the previous iteration is immediately prior to the first iteration.

4. The method of claim 1 , wherein the cost function accounts for integral of absolute error, overshoot, and settling time.

5. The method of claim 1 , further comprising generating a vector with Bernoulli distribution.

6. The method of claim 5 , further comprising normalizing the Bernoulli distribution.

7. The method of claim 1 , further comprising comparing elements of the control parameter against upper and lower bounds.

Assignments (2)
MERGER Recorded Aug 27, 2023
From: DANFOSS POWER SOLUTIONS II TECHNOLOGY A/S
To: DANFOSS A/S
Reel/Frame 064730/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 20, 2022
From: EATON CORPORATION
To: DANFOSS POWER SOLUTIONS II TECHNOLOGY A/S
Reel/Frame 060248/0077 →
Continuity (5)
Division 13567715 · Aug 6, 2012
Division 12483091 · Jun 11, 2009
Provisional Application 61060601 · Jun 11, 2008
Provisional Application 61087608 · Aug 8, 2008
Related Publication 20130297045A1 · Nov 7, 2013