IP Library Granted Patent US 9,605,691
Granted Patent B2
US 9,605,691 · App. 13/997,526 · Granted Mar 28, 2017

Oil pressure system for wheel loader

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,605,691
App. No.
13/997,526
Granted
Mar 28, 2017
Kind
B2
Abstract

The present disclosure provides an oil pressure system for a wheel loader with an improved raising process of a boom, thereby, especially, decreasing impact generated when the boom approaches a maximum height during loading work.

Claims (19)

1. An oil pressure system for a wheel loader including oil pressure pumps having different cutoff pressure values, the system comprising:

a pair of oil pressure pumps configured to discharge hydraulic oil;

a plurality of working devices including a front working device that includes only boom cylinders and a bucket cylinder and is driven by a pressure of the hydraulic oil;

a confluent circuit configured to make the hydraulic oil discharged from the pair of oil pressure pumps be confluent; and

a pair of pump regulators configured to:

adjust a swash of each of the pair of oil pressure pumps, respectively;

make the hydraulic oil discharged from the pair of oil pressure pumps be supplied to the boom cylinders through the confluent circuit when the pressure of the hydraulic oil discharged from the pair of oil pressure pumps is smaller than a predetermined cutoff pressure; and

cut off one of the pair of oil pressure pumps so that only the hydraulic oil discharged from the other one of the pair of oil pressure pumps is supplied when the pressure of the hydraulic oil discharged from the pair of oil pressure pumps is equal to or larger than the predetermined cutoff pressure, so that impact generated when the boom approaches a maximum height is decreased,

wherein the one of the pair of oil pressure pumps that supplies the hydraulic oil only to the front working device is first cut off.

2. The oil pressure system of claim 1 , wherein the predetermined cutoff pressure set in the pair of oil pressure pumps corresponds to a pressure when the boom approaches a predetermined height close to the maximum height.

3. An oil pressure system for a wheel loader including oil pressure pumps having different cutoff pressure values, the system comprising:

a pair of oil pressure pumps configured to discharge hydraulic oil;

a plurality of working devices including a front working device that includes only boom cylinders and a bucket cylinder and is driven by a pressure of the hydraulic oil;

a confluent circuit configured to make the hydraulic oil discharged from the pair of oil pressure pumps be confluent; and

a pair of relief valves configured to:

adjust relief pressure of discharge lines of each of the pair of oil pressure pumps, respectively;

make the hydraulic oil discharged from the pair of oil pressure pumps be supplied to the boom cylinders through the confluent circuit when the pressure of the hydraulic oil discharged from the pair of oil pressure pumps is smaller than a predetermined cutoff pressure; and

cut off one of the pair of oil pressure pumps so that only the hydraulic oil discharged from the other one of the pair of oil pressure pumps is supplied when the pressure of the hydraulic oil discharged from the pair of oil pressure pumps is equal to or larger than the predetermined cutoff pressure, so that impact generated when the boom approaches a maximum height is decreased,

wherein the one of the pair of oil pressure pumps that supplies the hydraulic oil only to the front working device is first cut off.

Assignments (3)
CHANGE OF NAME Recorded Dec 4, 2023
From: DOOSAN INFRACORE CO., LTD.
To: HYUNDAI DOOSAN INFRACORE CO., LTD.
Reel/Frame 065761/0942 →
CHANGE OF NAME Recorded Dec 4, 2023
From: HYUNDAI DOOSAN INFRACORE CO., LTD.
To: HD HYUNDAI INFRACORE CO., LTD.
Reel/Frame 065761/0957 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 3, 2013
From: PARK, MOO YOUNG
To: DOOSAN INFRACORE CO., LTD.
Reel/Frame 030735/0166 →