IP Library Granted Patent US 9,346,134
Granted Patent B2
US 9,346,134 · App. 14/002,482 · Granted May 24, 2016

Process for making a metal part such as a turbine engine blade reinforcement

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,346,134
App. No.
14/002,482
Granted
May 24, 2016
Kind
B2
Abstract

A process for manufacturing a metal part such as a metal reinforcement for the blade of a turbine engine, which includes: manufacturing a three-dimensional metal structure made up of an insert which exhibits properties which allow superplastic forming and diffusion welding to be carried out, and of multiple metal wires encircling the periphery of the insert, where the metal structure forms a preform of the metal part; positioning the metal structure in a forming tool and hot-pressing the three-dimensional metal structure which causes agglomeration of the metal structure so as to obtain the compact metal part.

Claims (25)

1. A process for manufacturing a metal part, the process comprising:

manufacturing a three-dimensional metal structure made up of an insert which has properties which allow superplastic forming and diffusion welding to be carried out, and of multiple separate metal wires each encircling a periphery of said insert, wherein a space separates at least two adjacent separate metal wires of the multiple separate metal wires, and wherein said three-dimensional metal structure forms a preform of said metal part;

positioning said three-dimensional metal structure in a forming tool, and

hot-pressing said three-dimensional metal structure which causes agglomeration of said three-dimensional metal structure, so as to obtain said metal part.

2. The process for manufacturing a metal part according to claim 1 , wherein said manufacturing includes:

a first sub-step for manufacturing said insert;

a second sub-step for winding said multiple separate metal wires around said insert.

3. The process for manufacturing a metal part according to claim 2 , wherein said sub-step for manufacturing said insert is performed by forging or machining or casting or by a three-dimensional weaving process.

4. The process for manufacturing a metal part according to claim 1 , wherein the manufacturing comprises separately bending each of the multiple separate metal wires so that, after bending, each of the multiple separate metal wires forms one or more loops to encircle the periphery of said insert.

5. The process for manufacturing a metal part according to claim 4 , wherein, after bending each of the multiple separate metal wires, the insert is inserted into the one or more loops of each of the multiple separate metal wires.

6. The process for manufacturing a metal part according to claim 1 , wherein said process is a process for manufacturing a metal reinforcement for a leading edge or trailing edge of a blade of a turbine engine, or of a metal reinforcement of a propeller such that said metal part obtained during said hot pressing is a metal reinforcement.

7. The process for manufacturing a metal part according to claim 1 , wherein said hot-pressing is an isostatic pressing step or an isothermal forging step.

8. The process for manufacturing a metal part according to claim 1 , wherein said manufacturing includes:

a first sub-step for manufacturing said insert;

a second sub-step of bending said multiple separate metal wires such that each metal wire of said multiple separate metal wires exhibits at least one loop; and

a third sub-step of inserting said insert in each loop of said multiple separate metal wires.

9. The process for manufacturing a metal part according to claim 1 , wherein said insert is a metal insert.

10. The process for manufacturing a metal part according to claim 1 , wherein said multiple separate metal wires are bent into an A-shape.

11. The process for manufacturing a metal part according to claim 1 , wherein said multiple separate metal wires are titanium-based wires and/or SiC-Titanium wires.

12. The process for manufacturing a metal part according to claim 1 , wherein said process includes:

manufacturing multiple three-dimensional metal structures made up of an insert and of multiple metal wires surrounding said insert, where said multiple three-dimensional metal structures form a pre-form of said metal part;

positioning said multiple three-dimensional metal structures in a forming tool:

hot-pressing said multiple three-dimensional metal structures which causes agglomeration of said multiple three-dimensional metal structures, so as to obtain said metal part.

13. The process for manufacturing a metal part according to claim 1 , wherein the metal part is a turbine engine blade metal reinforcement.

14. The process for manufacturing a metal part according to claim 1 , wherein the space depends on a thickness of said multiple separate metal wires encircling the periphery of said insert.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE COVER SHEET TO REMOVE APPLICATION NOS. 10250419, 10786507, 10786409, 12416418, 12531115, 12996294, 12094637 12416422 PREVIOUSLY RECORDED ON REEL 046479 FRAME 0807. ASSIGNOR(S) HEREBY CONFIRMS THE CHANGE OF NAME. Recorded Aug 24, 2018
From: SNECMA
To: SAFRAN AIRCRAFT ENGINES
Reel/Frame 046939/0336 →
CHANGE OF NAME Recorded May 23, 2018
From: SNECMA
To: SAFRAN AIRCRAFT ENGINES
Reel/Frame 046479/0807 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 30, 2013
From: GODON, THIERRY; DAMBRINE, BRUNO JACQUES GERARD; PERROUX, ALAIN ROBERT YVES
To: SNECMA
Reel/Frame 031119/0258 →