IP Library Granted Patent US 9,020,653
Granted Patent B2
US 9,020,653 · App. 14/012,887 · Granted Apr 28, 2015

System and method for associating a load demand with a variable power generation

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,020,653
App. No.
14/012,887
Granted
Apr 28, 2015
Kind
B2
Abstract

Systems and methods for associating a load demand with a variable power generation are described. A method of providing power from a renewable resource includes receiving a signal including an output capability value for a renewable variable power generation module. An input power demand value is calculated for a load demand module based on the output capability value of the received signal. A customer load is controlled on a power transmission and distribution grid based on the calculated input power demand value.

Claims (33)

1. A method of providing power from a renewable resource, the method comprising:

receiving a signal at a response device of a load demand module directly from a renewable variable power generation module, the signal including an output capability value for the renewable variable power generation module;

calculating an input power demand value for the load demand module based on the output capability value of the received signal; and

controlling a customer load on a power transmission and distribution grid based on the calculated input power demand value.

2. The method of claim 1 , wherein controlling the customer load comprises invoking a lower load demand at times of lower solar power production at the renewable variable power generation module.

3. The method of claim 1 , wherein controlling the customer load comprises increasing load demand at times of higher than normal solar power production at the renewable variable power generation module.

4. The method of claim 1 , wherein controlling the customer load comprises storing excess power for later demand events at times of higher than normal solar power production at the renewable variable power generation module.

5. The method of claim 1 , wherein the renewable variable power generation module is a solar variable power generation module.

6. The method of claim 1 , wherein the load demand module is a smart appliance.

7. The method of claim 1 , wherein the power transmission and distribution grid comprises a power delivery requirement, and wherein controlling the customer load on the power transmission and distribution grid is performed without affecting the power delivery requirement of the power transmission and distribution grid.

8. The method of claim 7 , the method further comprising:

maintaining a power delivery requirement of electrical generating units coupled to the power transmission and distribution grid approximately constant during the controlling the customer load on the power transmission and distribution grid.

9. A method of providing power from a renewable variable power generation module, the method comprising:

receiving a signal at a response device of a smart appliance directly from a solar power generation module, the signal including an output capability value for the solar power generation module;

calculating an input power demand value for the smart appliance based on the output capability value of the received signal; and

controlling a customer load on a power transmission and distribution grid based on the calculated input power demand value.

10. The method of claim 9 , wherein controlling the customer load comprises invoking a lower load demand at times of lower solar power production at the solar power generation module.

11. The method of claim 9 , wherein controlling the customer load comprises increasing load demand at times of higher than normal solar power production at the solar power generation module.

12. The method of claim 9 , wherein controlling the customer load comprises storing excess power for later demand events at times of higher than normal solar power production at the solar power generation module.

13. The method of claim 9 , wherein the power transmission and distribution grid comprises a power delivery requirement, and wherein controlling the customer load on the power transmission and distribution grid is performed without affecting the power delivery requirement of the power transmission and distribution grid.

14. The method of claim 13 , the method further comprising:

maintaining a power delivery requirement of electrical generating units coupled to the power transmission and distribution grid approximately constant during the controlling the customer load on the power transmission and distribution grid.

15. A system for associating a load demand with a variable power generation, the system comprising:

a renewable variable power generation module comprising a sensor, the sensor configured to determine an output power capability value for the renewable variable power generation module; and

a load demand module comprising a response device, the response device configured to receive the output power capability value directly from the renewable variable power generation module and to determine an input power demand value based on the output power capability value, wherein the renewable variable power generation module and the load demand module are adaptable to be coupled with a power transmission and distribution grid in between the renewable variable power generation module and the load demand module.

16. The system of claim 15 , wherein the renewable variable power generation module is a solar variable power generation module.

17. The system of claim 15 , wherein the load demand module is configured to control a power consumption level of the load demand module in response to a change in the input power demand value, the change in the input power demand value based on a change in the output power capability value of the renewable variable power generation module.

18. The system of claim 17 , wherein the power transmission and distribution grid comprises a power delivery requirement, and wherein the change in the output power capability value of the renewable variable power generation module is transparent to the power delivery requirement of the power transmission and distribution grid.

19. The system of claim 18 , wherein the power delivery requirement of the power transmission and distribution grid is approximately constant during the change in the output power capability value of the renewable variable power generation module.

20. The system of claim 17 , wherein the load demand module is configured to decrease the power consumption level of the load demand module in response to a decrease in the input power demand value, the decrease in the input power demand value based on a decrease in the output power capability value of the renewable variable power generation module.

21. The system of claim 17 , wherein the load demand module is configured to increase the power consumption level of the load demand module in response to an increase in the input power demand value, the increase in the input power demand value based on an increase in the output power capability value of the renewable variable power generation module.

22. The system of claim 17 , wherein the renewable variable power generation module further comprises a power storage module, the power storage module configured to receive a portion of power generated by the renewable variable power generation module when the output power capability value of the renewable variable power generation module exceeds the input power demand value determined by the response device of the load demand module.

23. The system of claim 17 , wherein the load demand module further comprises a demand response provider, the demand response provider configured to control the power consumption level of the load demand module.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 16, 2025
From: SUNPOWER CORPORATION; SUNPOWER CORPORATION, SYSTEMS
To: UNIRAC, INC.
Reel/Frame 071302/0904 →
RELEASE OF SECURITY INTEREST Recorded Apr 1, 2025
From: SUNPOWER CORPORATION,
To: UNIRAC, INC.
Reel/Frame 070704/0860 →
SECOND LIEN PATENT SECURITY AGREEMENT Recorded Feb 14, 2024
From: SUNPOWER CORPORATION
To: GLAS AMERICAS LLC, AS COLLATERAL AGENT
Reel/Frame 066598/0964 →
SECURITY INTEREST Recorded Sep 13, 2022
From: SUNPOWER CORPORATION
To: BANK OF AMERICA, N.A., AS AGENT
Reel/Frame 061422/0566 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 27, 2015
From: LENOX, CARL J. S.
To: SUNPOWER CORPORATION
Reel/Frame 035057/0896 →