IP Library Granted Patent US 9,061,599
Granted Patent B2
US 9,061,599 · App. 14/014,163 · Granted Jun 23, 2015

System and method for optimizing the storing of vehicular energy

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,061,599
App. No.
14/014,163
Granted
Jun 23, 2015
Kind
B2
Abstract

A system for storing electrically a regenerative energy of a vehicle is provided. The system includes a first energy storage device, a second energy storage device, an energy regulating device coupled to the first and second energy storage devices, a source of regenerative power configured to capture a regenerative energy during a regenerative power event of the vehicle, and a control unit coupled to the energy regulating device. The control unit is configured to transfer electrical energy from the first energy storage device to the second energy storage device based on a prediction of the regenerative power event using the energy regulating device. The transfer of the electrical energy serves to reduce the electrical energy stored in the first energy storage device thereby enabling the first energy storage device to receive from the regenerative power device when the predicted regenerative power event occurs an amount of the electrical regenerative energy.

Claims (72)

1. A system for storing electrically a regenerative energy of a vehicle, comprising:

a first energy storage device;

a second energy storage device;

an energy regulating device coupled to the first and second energy storage devices;

a source of regenerative power for capturing regenerative energy during a regenerative power event of the vehicle; and

a control unit coupled to the energy regulating device, wherein the control unit is configured to:

transfer electrical energy from the first energy storage device to the second energy storage device based on a prediction of the regenerative power event using the energy regulating device; and

compare a cost of losing regenerative energy because of a failure to timely transfer electrical energy, and a cost of lost transfer energy due to inefficiencies in passing energy from the first energy storage device to the second energy storage device;

wherein the transfer of the electrical energy serves to reduce the electrical energy stored in the first energy storage device thereby enabling the first energy storage device to receive from the regenerative power device when the predicted regenerative power event occurs an amount of the electrical regenerative energy.

2. The system of claim 1 , wherein the control unit is programmed to make a prediction of a time window when the next regenerative power event will likely occur.

3. The system of claim 2 , wherein the prediction is based on at least one of a statistical driving model, a detected type of driving style including speed and acceleration, stored driving data from prior trips of the vehicle, stored energy data, and routing information.

4. The system of claim 2 , wherein the control unit determines to pass on the electrical energy transfer based at least in part on an estimate of how quickly accessory load current can lower the SOC of the first energy storage device.

5. The system of claim 4 , wherein the estimate is based at least in part on at least one of:

a prior history of accessory usage over multiple time scales;

a stored history of accessory usage during trips prior to the current trip;

a history of accessory usage during a time interval of a current trip of the vehicle;

a current state of the vehicle during the current trip including at least one of vehicular speed and acceleration; and

route information of the current trip.

6. The system of claim 5 , wherein the estimate is further based at least in part on at least one of:

data collected from vehicle regarding prior, present, predicted accessory data, or any combination thereof; and

data collected from accessories regarding prior, present, predicted accessory data, or any combination thereof.

7. The system of claim 1 , wherein the control unit is configured to use the information to make predictions related to:

a time window when the next regenerative power event will likely occur,

how quickly a normal vehicle operation may drain the first energy storage device,

how likely the regenerating energy may be lost due to the first storage device having more than an optimum amount of electrical energy at the time of the next regenerative power event, and

how much energy may be lost due to inefficiencies in transferring energy from the first energy storage device to the second energy storage energy device; and

wherein the control unit makes a decision based on at least one of these predictions as to whether electrical energy should be transferred from the first energy device to the second energy storage device.

8. The system of claim 1 , wherein the first energy storage device is a relatively high power storage device and the second energy storage device compared to the first energy storage device is a relatively high energy storage device.

9. The system of claim 1 , further comprising:

a device for transferring energy from the first energy storage device back to wheels of the vehicle to provide propulsion power to the vehicle.

10. The system of claim 1 , wherein the source of regenerative power is one of a generator, an alternator, a motor, or any combination thereof.

11. A computer-implemented method of reducing loss of regenerative energy in a vehicle by controlling energy storage devices that power the vehicle, comprising:

predicting when a next regenerative power event during a current trip will occur;

estimating when a first energy storage device connected for receipt of regenerative energy will be in an optimum condition to receive regenerative energy;

transferring electrical energy from the first energy storage device to a second energy storage device to reduce the loss of regenerative power due to the first energy storage device having a greater than an amount of stored electrical energy suitable to accept regenerative energy during the predicted regenerative power event; and

terminating the transferring of electrical energy from the first energy storage system to the second energy storage device when the first energy storage device has no greater amount than the suitable amount of stored electrical energy.

12. The computer-implemented method of claim 11 , wherein automatically estimating is based upon at least one of:

a prior history of accessory usage over multiple time scales;

a stored history of accessory usage during trips prior to the current trip;

a history of accessory usage during a time interval of a current trip of the vehicle;

a current state of the vehicle during the current trip including at least one of vehicular speed and acceleration; and

route information of the current trip.

13. The computer-implemented method of claim 12 , wherein automatically estimating is further based upon at least one of:

data collected from vehicle regarding prior, present, predicted accessory data, or any combination thereof; and

data collected from accessories regarding prior, present, predicted accessory data, or any combination thereof.

14. The computer-implemented method of claim 11 , further comprising:

estimating a time needed to lower an SOC of at least one of the first and second energy storage devices to a suitable level for receipt of regenerative energy; and

comparing a risk of losing regenerative energy based on the estimated time to the next predicted regenerative power event and on the estimated time needed to lower the SOC of the at least one of the first and second energy storage devices.

15. The computer-implemented method of claim 11 , wherein energy transferring is performed only if a risk of losing regenerative energy is greater than a preselected level of disruption of a normal operation of the vehicle.

16. The computer-implemented method of claim 11 , wherein energy transferring is performed only if a loss of regenerative energy because of a failure to transfer energy is greater than efficiency lost from transferring energy from the first energy storage device to the second energy storage device.

17. The computer-implemented method of claim 11 , wherein the first energy storage device is a high power storage device, and the second energy storage device is a high energy storage device.

18. A computing system, comprising:

at least one processing unit and at least one memory unit storing instructions that are operable, when executed by the at least one processing unit, to cause the at least one processing unit to perform a method for reducing loss of power from a regenerative source of power that is provided during regenerative power events, the method comprising:

predicting when a next regenerative power event during a current trip will occur;

estimating when a first energy storage device connected for receipt of regenerative energy will be in an optimum condition to receive regenerative energy; and

transferring electrical energy from the first energy storage device to a second energy storage device to reduce the loss of regenerative power due to the first energy storage device having a greater than an amount of stored electrical energy suitable to accept regenerative energy during the predicted regenerative power event, wherein energy transferring is performed only if a loss of regenerative energy because of a failure to transfer energy is greater than efficiency lost from transferring energy from the first energy storage device to the second energy storage device.

19. The computing system of claim 18 , wherein automatically estimating is based upon at least one of:

a prior history of accessory usage over multiple time scales;

a stored history of accessory usage during trips prior to the current trip;

a history of accessory usage during a time interval of a current trip of the vehicle;

a current state of the vehicle during the current trip including at least one of vehicular speed and acceleration; and

route information of the current trip.

20. The computing system of claim 18 , wherein automatically estimating is further based upon at least one of:

data collected from vehicle regarding prior, present, predicted accessory data, or any combination thereof; and

data collected from accessories regarding prior, present, predicted accessory data, or any combination thereof.

21. The computing system of claim 18 , further comprising:

terminating the transferring of electrical energy from the first energy storage system to the second energy storage device when the first energy storage device has no greater amount than the suitable amount of stored electrical energy.

22. The computing system of claim 18 , further comprising:

estimating a time needed to lower an SOC of at least one of the first and second energy storage devices to a suitable level for receipt of regenerative energy; and

comparing a risk of losing regenerative energy based on the estimated time to the next predicted regenerative power event and on the estimated time needed to lower the SOC of the at least one of the first and second energy storage devices.

23. The computing system of claim 18 , wherein energy transferring is performed only if a risk of losing regenerative energy is greater than a preselected level of disruption of a normal operation of the vehicle.

24. The computing system of claim 18 , wherein the first energy storage device is a high power storage device, and the second energy storage device is a high energy storage device.

Assignments (4)
FIRST LIEN PATENT SECURITY AGREEMENT Recorded Aug 29, 2019
From: CPS TECHNOLOGY HOLDINGS LLC
To: CITIBANK N.A., AS COLLATERAL AGENT
Reel/Frame 050229/0029 →
ABL PATENT SECURITY AGREEMENT Recorded Aug 29, 2019
From: CPS TECHNOLOGY HOLDINGS LLC
To: CITIBANK N.A., AS COLLATERAL AGENT
Reel/Frame 050229/0079 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 20, 2019
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: CPS TECHNOLOGY HOLDINGS LLC
Reel/Frame 049550/0769 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 19, 2015
From: SISK, BRIAN C.
To: JOHNSON CONTROLS TECHNOLOGY COMPANY
Reel/Frame 035672/0261 →