IP Library Granted Patent US 9,685,673
Granted Patent B2
US 9,685,673 · App. 14/019,702 · Granted Jun 20, 2017

Fuel cell system with quick connect components

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,685,673
App. No.
14/019,702
Granted
Jun 20, 2017
Kind
B2
Abstract

Embodiments relate to a fuel cell system. In an embodiment, the fuel cell system includes advanced leak test capabilities. In another embodiment, the fuel cell system includes a system to bypass one or more separation units while permitting the fuel cell system to continue to produce electricity. In another embodiment, the fuel cell system includes an alignment system that permits ease of alignment when a fuel cell module is installed proximate a fuel processing module. In another embodiment, the fuel cell system includes a system of supplying auxiliary fuel from a mobile auxiliary fuel supply. In an embodiment, one or more or all of these embodiments may be practiced together in combination.

Claims (19)

1. A method of testing a fuel cell system comprising:

providing a fuel cell module including a fuel cell stack including a fluid inlet connected to a fluid outlet of a fuel processing module that purifies a fuel for the fuel cell stack, thereby creating a fluid circuit extending between the fuel cell module and the fuel processing module;

closing off a first end of the fluid circuit, the first end located in the fuel cell module, by closing a first valve located in a fuel inlet path to the fuel cell module;

permitting a fluid to flow from the fuel processing module through the fluid circuit and toward the fuel cell module, such that the closed first valve prevents the fluid from flowing into the first end;

sensing a first pressure of the fluid that has flown into the fluid circuit, between the fuel processor and the first valve, while the first end is closed off and a second end of the fluid circuit is open, the second end being located in the fuel processing module; and

determining whether the sensed first pressure in the fluid circuit is indicative of a leak in the fuel cell system.

2. The method of claim 1 , further comprising:

closing off the second end of the fluid circuit;

sensing a second pressure of the fluid in the fluid circuit while the first end is closed off and while second end is closed off; and

determining whether the sensed second pressure in the fluid circuit is indicative of a leak in the fluid circuit.

3. The method of claim 2 , further comprising:

opening the first and second ends of the fluid circuit so that fluid flows from the fluid processing module through the fluid circuit to the fuel cell stack;

sensing a third pressure of the fluid in the fluid circuit while the fluid is flowing from the fuel processing module through the fluid circuit to the fuel cell stack; and

determining whether the sensed third pressure in the fluid circuit is indicative of a leak in the fuel cell system.

4. The method of claim 3 , further comprising:

shutting down operation of the fuel cell system if a determination is made that at least one of the sensed first pressure, second pressure or third pressure in the fluid circuit is indicative of a leak in the fuel cell system.

5. The method of claim 2 , wherein the fluid comprises a fuel or an inert gas.

6. The method of claim 2 wherein the step of closing off the second end of the fluid circuit comprises closing a second valve located in the fuel processing module.

7. The method of claim 1 , wherein sensing the first pressure of the fluid that has flown into the fluid circuit comprises measuring the first pressure by a pressure sensor located in the fluid circuit between the fuel processor and the first valve.

Assignments (2)
RELEASE OF SECURITY INTEREST Recorded Nov 29, 2018
From: U.S. BANK NATIONAL ASSOCIATION, AS COLLATERAL AGENT
To: BLOOM ENERGY CORPORATION
Reel/Frame 047686/0121 →
SECURITY INTEREST Recorded Dec 15, 2015
From: BLOOM ENERGY CORPORATION
To: U.S. BANK NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 037301/0093 →