IP Library Granted Patent US 9,414,407
Granted Patent B2
US 9,414,407 · App. 14/039,572 · Granted Aug 9, 2016

Enhanced scheduling information transmission in a heterogeneous network

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,414,407
App. No.
14/039,572
Granted
Aug 9, 2016
Kind
B2
Abstract

In a heterogeneous network environment where both high and low power nodes are sharing the same channel/frequency, explicit signaling in a downlink control message is used to select whether scheduling information SI is to be transmitted by a user equipment UE with a data payload or without a data payload. For the case where the selection is that SI is to be transmitted with a data payload, the downlink control message is used for the UE to select a transport format combination TFC for transmission of the SI with the data payload. Else for the case where the selection is that SI is to be transmitted without a data payload, the downlink control message is used for the UE to select transmit power for the transmission of the SI without the data payload.

Claims (57)

1. A method, comprising:

selecting, by circuitry using explicit signaling in a downlink control message, whether user equipment is to transmit scheduling information with a data payload or without a data payload;

using, by the circuitry when the user equipment is to transmit the scheduling information with the data payload, the downlink control message for the user equipment to select a transport format combination for transmission of the scheduling information with the data payload; and

using, by the circuitry when the user equipment is to transmit the scheduling information without the data payload, the downlink control message for the user equipment to select a transmit power for transmission of the scheduling information without the data payload, wherein

the user equipment autonomously switches from transmission of the scheduling information with the data payload to transmission of the scheduling information without the data payload when a power backoff value is larger than a serving grant power for the user equipment,

the power backoff value is indicated by the downlink control message and the power backoff value is used for the user equipment to select the transport format combination, and

the transmit power for the transmission of the scheduling information without the data payload, after the autonomous switching by the user equipment, is not based on a transmit power for a resource grant by a serving node of the user equipment as indicated by downlink radio resource control signaling.

2. The method according to claim 1 , wherein when the user equipment is to transmit the scheduling information without a data payload,

the downlink control message on a scheduling information control channel, or an indication on a non-serving relative grant channel, indicates whether the user equipment is to follow a relative power control indication from a non-serving cell.

3. The method according to claim 1 , further comprising:

using, by the circuitry, an indication on a relative power control channel to step up or step down the transmit power for the transmission of the scheduling information, wherein

a number of different relative power control channels varies depending on whether the scheduling information is to be transmitted with the data payload or without the data payload.

4. The method according to claim 1 , wherein the user equipment further switches between transmission of the scheduling information with the data payload and transmission of the scheduling information without the data payload according to implicit signaling on a relative grant channel associated with the respective transmission of scheduling information with the data payload or without the data payload.

5. The method according to claim 1 , wherein the transmit power for the transmission of the scheduling information without the data payload, after the autonomous switching by the user equipment, is based on a transmit power for a resource grant by a serving node of the user equipment as indicated by downlink radio resource control signaling.

6. The method according to claim 5 , wherein an indication of the downlink radio resource control signaling is implicit.

7. The method according to claim 1 , wherein when the circuitry is part a serving node that serves the user equipment, the serving node:

sends the downlink control message to the user equipment; and either

sets bit values in the downlink message so that the scheduling information is transmitted with the data payload; or

sets bit values in the downlink message so that the scheduling information is transmitted without the data payload.

8. The method according to claim 1 , wherein when the circuitry is part of the user equipment, the circuitry:

receives from a serving node the downlink control message; and either

uses bit values in the downlink message to select the transport format combination for transmission of the scheduling information with the data payload; or

uses bit values in the downlink message to select the transmit power for transmission of the scheduling information without the data payload.

9. An apparatus, comprising:

circuitry; and

a memory storing computer instructions that, when executed by the circuitry, cause the circuitry to:

select, using explicit signaling in a downlink control message, whether user equipment is to transmit scheduling information with a data payload or without a data payload;

use, when the user equipment is to transmit the scheduling information with the data payload, the downlink control message for the user equipment to select a transport format combination for transmission of the scheduling information with the data payload; and

use, when the user equipment is to transmit the scheduling information without the data payload, the downlink control message for the user equipment to select a transmit power for transmission of the scheduling information without the data payload, wherein

the user equipment autonomously switches from transmission of the scheduling information with the data payload to transmission of the scheduling information without the data payload when a power backoff value is larger than a serving grant power for the user equipment,

the power backoff value is indicated by the downlink control message and the power backoff value is used for the user equipment to select the transport format combination, and

the transmit power for the transmission of the scheduling information without the data payload, after the autonomous switching by the user equipment, is not based on a transmit power for a resource grant by a serving node of the user equipment as indicated by downlink radio resource control signaling.

10. The apparatus according to claim 9 , wherein when the user equipment is to transmit the scheduling information without the data payload,

the downlink control message on a scheduling information control channel, or an indication on a non-serving relative grant channel, indicates whether the user equipment is to follow a relative power control indication from a non-serving cell.

11. The apparatus according to claim 9 , wherein

the circuitry is further configured to use an indication on a relative power control channel to step up or step down the transmit power for the transmission of the scheduling information, and

a number of different relative power control channels varies depending on whether the scheduling information is to be transmitted with the data payload or without the data payload.

12. The apparatus according to claim 9 , wherein the circuitry is further configured to switch between transmission of the scheduling information with the data payload and without the data payload according to implicit signaling on a relative grant channel associated with the respective transmission of scheduling information with the data payload or without the data payload.

13. The apparatus according to claim 9 , wherein the transmit power for the transmission of the scheduling information without the data payload, after the autonomous switching by the user equipment, is based on a transmit power for a resource grant by a serving node of the user equipment as indicated by downlink radio resource control signaling.

14. The apparatus according to claim 13 , wherein an indication of the downlink radio resource control signaling is implicit.

15. The apparatus according to claim 9 , wherein the apparatus further comprises a serving node including the circuitry, the serving node serving of the user equipment, and the serving node:

sends the downlink control message to the user equipment; and either

sets bit values in the downlink message so that the scheduling information is transmitted with the data payload; or

sets bit values in the downlink message so that the scheduling information is transmitted without the data payload.

16. The apparatus according to claim 9 , wherein the apparatus comprises the user equipment, the user equipment includes the circuitry, and the user equipment:

receives from a serving node the downlink control message; and either

uses bit values in the downlink message to select the transport format combination for transmission of the scheduling information with the data payload; or

uses bit values in the downlink message to select the transmit power for transmission of the scheduling information without the data payload.

17. A non-transitory computer readable memory storing a computer program which, when executed by at least one processor, causes the at least one processor to:

select, using explicit signaling in a downlink control message, whether user equipment is to transmit scheduling information with a data payload or without a data payload;

use, when the user equipment is to transmit the scheduling information with the data payload, the downlink control message for the user equipment to select a transport format combination for transmission of the scheduling information with the data payload; and

use, when the user equipment is to transmit the scheduling information without the data payload, the downlink control message for the user equipment to select a transmit power for transmission of the scheduling information without the data payload, wherein

the user equipment autonomously switches from transmission of the scheduling information with the data payload to transmission of the scheduling information without the data payload when a power backoff value is larger than a serving grant power for the user equipment,

the power backoff value is indicated by the downlink control message and the power backoff value is used for the user equipment to select the transport format combination, and

the transmit power for the transmission of the scheduling information without the data payload, after the autonomous switching by the user equipment, is not based on a transmit power for a resource grant by a serving node of the user equipment as indicated by downlink radio resource control signaling.

18. The non-transitory computer readable memory according to claim 17 , further wherein when the user equipment is to transmit the scheduling information without the data payload,

the downlink control message on a scheduling information control channel, or an indication on a non-serving relative grant channel, indicates whether the user equipment is to follow a relative power control indication from a non-serving cell.

Assignments (10)
CORRECTIVE ASSIGNMENT TO CORRECT THE PATENT NUMBER 9,385,856 TO 9,385,756 PREVIOUSLY RECORDED AT REEL: 47349 FRAME: 001. ASSIGNOR(S) HEREBY CONFIRMS THE MERGER. Recorded Mar 22, 2019
From: AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.
To: AVAGO TECHNOLOGIES INTERNATIONAL SALES PTE. LIMITED
Reel/Frame 051144/0648 →
CORRECTIVE ASSIGNMENT TO CORRECT THE EFFECTIVE DATE PREVIOUSLY RECORDED ON REEL 047229 FRAME 0408. ASSIGNOR(S) HEREBY CONFIRMS THE THE EFFECTIVE DATE IS 09/05/2018. Recorded Oct 29, 2018
From: AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.
To: AVAGO TECHNOLOGIES INTERNATIONAL SALES PTE. LIMITED
Reel/Frame 047349/0001 →
MERGER Recorded Oct 4, 2018
From: AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.
To: AVAGO TECHNOLOGIES INTERNATIONAL SALES PTE. LIMITED
Reel/Frame 047229/0408 →
CORRECTIVE ASSIGNMENT TO CORRECT THE CONVEYING PARTY PREVIOUSLY RECORDED ON REEL 032086 FRAME 0389. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT FROM ONE OR BOTH ASSIGNORS ACCORDING TO PRIOR AGREEMENT.. Recorded Dec 18, 2017
From: RENESAS MOBILE CORPORATION
To: BROADCOM INTERNATIONAL LIMITED
Reel/Frame 046266/0231 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENTS Recorded Feb 3, 2017
From: BANK OF AMERICA, N.A., AS COLLATERAL AGENT
To: BROADCOM CORPORATION
Reel/Frame 041712/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 1, 2017
From: BROADCOM CORPORATION
To: AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.
Reel/Frame 041706/0001 →
PATENT SECURITY AGREEMENT Recorded Feb 11, 2016
From: BROADCOM CORPORATION
To: BANK OF AMERICA, N.A., AS COLLATERAL AGENT
Reel/Frame 037806/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 20, 2014
From: BROADCOM INTERNATIONAL LIMITED
To: BROADCOM CORPORATION
Reel/Frame 032088/0794 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 17, 2014
From: RENESAS ELECTRONICS CORPORATION; RENESAS MOBILE CORPORATION
To: BROADCOM INTERNATIONAL LIMITED
Reel/Frame 032086/0389 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 1, 2013
From: CHEN, TAO; LEHTI, ARTO JOHANNES; LAMPINEN, KARL MARKO JUHANI; CALLENDER, CHRISTOPHER; REPO, ILMARI
To: RENESAS MOBILE CORPORATION
Reel/Frame 031319/0563 →