IP Library Granted Patent US 9,009,964
Granted Patent B2
US 9,009,964 · App. 14/041,556 · Granted Apr 21, 2015

Device for mounting of wind turbine blades

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,009,964
App. No.
14/041,556
Granted
Apr 21, 2015
Kind
B2
Abstract

A method for mounting a wind turbine blade to a wind turbine hub by use of a crane boom is provided. The orientation of the blade is kept substantially horizontal when the blade is lifted off the ground and mounted to the rotor hub. Control wires which connect the blade via the crane boom to a winch arrangement are used for keeping the blade orientation substantially horizontal in addition to at least one bearing wire for bearing the blade weight.

Claims (22)

1. A wind turbine blade lifting system for lifting a wind turbine blade of a wind turbine, comprising:

a crane, the crane having:

a main winch,

a crane boom,

a bearing wire running from the main winch to a pulley at a top of the crane boom; and

a lifting device suspended from the bearing wire, the lifting device having:

a frame configured to cradle a wind turbine blade;

a winch arrangement which is located at the lifting device;

a control wire which runs to the winch arrangement for controlling a blade orientation horizontal when lifting the wind turbine blade off a ground; and

one or more ropes extending from a top end of the crane boom to a bottom end of the crane boom and connected to the control wire by pulleys,

the winch arrangement comprises a first winch and a second winch,

the control wire comprises a free length comprising a first branch and a second branch,

the first branch comprises a first fraction of the control wire,

the second branch comprises a second fraction of the control wire,

the first and the second branches are connected directly or indirectly to the crane boom,

the first winch controls the free length of the control wire,

the second winch controls a distribution of the free length of the control wire to the first fraction and the second fraction, and

the control wire comprises an end connected to the first winch and an intermediate section wrapped around the second winch.

2. The wind turbine blade lifting system as claimed in claim 1 wherein the one or more ropes comprise at least a first rope and a second rope, each extending from the top end of the crane boom to the bottom end of the crane boom, and

wherein the first branch and the second branch of the control wire are connected to the first rope and the second rope respectively by the pulleys.

3. The wind turbine blade lifting system as claimed in claim 1 , wherein the control wire controls the blade orientation within a horizontal plane when lifting the wind turbine blade off the ground.

4. The wind turbine blade lifting system as claimed in claim 1 , wherein the control wire runs within a horizontal plane.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2019
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS GAMESA RENEWABLE ENERGY A/S
Reel/Frame 048003/0631 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 22, 2014
From: LYNDERUP, HENRIK FOMSGAARD; MOELLER, JESPER
To: SIEMENS WIND POWER A/S
Reel/Frame 032018/0601 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 22, 2014
From: SIEMENS WIND POWER A/S
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 032019/0291 →