IP Library Granted Patent US 9,470,591
Granted Patent B2
US 9,470,591 · App. 14/054,276 · Granted Oct 18, 2016

GIS enabled pipeline upgrading system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,470,591
App. No.
14/054,276
Granted
Oct 18, 2016
Kind
B2
Abstract

Certain embodiments of the invention may include systems and methods for evaluating pipeline using GIS data. According to an example embodiment of the invention, a method is provided for evaluating pipeline using geographical information system (GIS) data. The method can include receiving component information from a GIS database for one or more components in a pipeline; determining a modified maximum allowable operating pressure (MAOPm) for the one or more components; determining an uprating pressure (MAOPm*) that the one or more components can withstand; and outputting a upgrade recommendation or an uprate recommendation based at least in part on the MAOPm and the MAOPm*.

Claims (46)

1. A controller for evaluating and improving a pipeline using geographical information system (GIS) data, comprising:

at least one memory for storing data and computer-executable instructions; and

at least one processor configured to access the at least one memory and further configured to execute the computer-executable instructions for:

receiving component information from a GIS database for one or more components in a pipeline;

determining a maximum operating pressure (MOP) of the one or more components in the pipeline;

determining a modified maximum allowable operating pressure (MAOPm) for the one or more components;

determining an uprating pressure (MAOPm*) that the one or more components can withstand; and

causing to output to a display:

the one or more components of the pipeline in a geographic region needing at least one of an upgrade recommendation or an uprate recommendation, corresponding to the one or more components of the pipeline in a geographic region based at least in part on the MOP, MAOPm, and the MAOPm*.

2. The controller of claim 1 , wherein receiving the component information comprises receiving one or more of: component location, corrosion rate, component wall thickness, maximum allowable operating pressure (MAOP), fault history, or trends.

3. The controller of claim 1 , wherein determining the modified maximum allowable operating pressure (MAOPm) comprises determining a modified specified minimum yield strength (SMYSm) based at least in part on a corrosion rate or an estimated component wall thickness of the one or more components.

4. The controller of claim 1 , wherein at least one processor is further configured for determining an estimated component wall thickness based at least in part on a corrosion rate associated with the one or more components.

5. The controller of claim 1 , wherein determining the uprating pressure (MAOPm*) is derived at least in part from a corrosion rate associated with the one or more components.

6. The controller of claim 1 , wherein outputting the upgrade recommendation is based at least in part upon one or more of the following being false:

maximum operating pressure (MOP)<MAOPm;

expected maximum operating pressure (MOPe)<MAOPm; and

minimum prediction limit<weak asset prediction<maximum prediction limit.

7. The controller of claim 1 , wherein the at least one processor is further configured for outputting the upgrade recommendation based on one or more of: rules, trends, patterns, or fault history associated with the one or more components.

8. The controller of claim 1 , wherein the at least one processor is further configured for determining a health status of the one or more components based at least in part on the determined MAOPm, and outputting the health status.

9. The controller of claim 1 , wherein outputting the uprate recommendation is based at least in part upon all of the following being true:

maximum operating pressure (MOP)<MAOPm;

expected maximum operating pressure (MOPe)<MAOPm; and

minimum prediction limit<weak asset prediction<maximum prediction limit.

10. The controller of claim 9 , wherein the at least one processor is further configured for outputting the uprate recommendation based on rules, trends, patterns, or fault history associated with the one or more components.

11. A tangible computer-readable medium storing instructions that, when executed by at least one processor, are operable to evaluate and improve a pipeline using geographical information system (GIS) data, by performing the following steps of:

receiving component information from a GIS database for one or more components in a pipeline;

determining a maximum operating pressure (MOP) of the one or more components in the pipeline;

determining a modified maximum allowable operating pressure (MAOPm) for the one or more components;

determining an uprating pressure (MAOPm*) that the one or more components can withstand; and

causing to output to a display:

the one or more components of the pipeline in a geographic region needing at least one of an upgrade recommendation or an uprate recommendation, corresponding to the one or more components in a geographic region based at least in part on the MOP, MAOPm, and the MAOPm*.

12. The tangible computer-readable medium of claim 11 , wherein receiving the component information comprises receiving one or more of: component location, corrosion rate, component wall thickness, maximum allowable operating pressure (MAOP), fault history, or trends.

13. The tangible computer-readable medium of claim 11 , wherein determining the modified maximum allowable operating pressure (MAOPm) comprises determining a modified specified minimum yield strength (SMYSm) based at least in part on a corrosion rate or an estimated component wall thickness of the one or more components.

14. The tangible computer-readable medium of claim 11 , further comprising determining an estimated component wall thickness based at least in part on corrosion rate associated with the one or more components.

15. The tangible computer-readable medium of claim 11 , wherein determining the uprating pressure (MAOPm*) is derived at least in part from a corrosion rate associated with the one or more components.

16. The tangible computer-readable medium of claim 11 , further determining a health status of the one or more components based at least in part on the one the determined MAOPm, and outputting the health status.

17. The tangible computer-readable medium of claim 11 , wherein outputting the upgrade recommendation is based at least in part upon one or more of the following being false:

maximum operating pressure (MOP)<MAOPm;

expected maximum operating pressure (MOPe)<MAOPm;

minimum prediction limit<weak asset prediction<maximum prediction limit.

18. The tangible computer-readable medium of claim 17 , further comprising outputting the upgrade recommendation based on one or more of: rules, trends, patterns, or fault history associated with the one or more components.

19. The tangible computer-readable medium of claim 11 , wherein outputting the uprate recommendation is based at least in part upon all of the following being true:

maximum operating pressure (MOP)<MAOPm;

expected maximum operating pressure (MOPe)<(MAOPm); and

minimum prediction limit<weak asset prediction<maximum prediction limit.

20. The tangible computer-readable medium of claim 19 , further comprising outputting the uprate recommendation based on rules, trends, patterns, or fault history associated with the one or more components.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 17, 2023
From: GENERAL ELECTRIC COMPANY
To: GE DIGITAL HOLDINGS LLC
Reel/Frame 065612/0085 →