IP Library Granted Patent US 9,761,335
Granted Patent B2
US 9,761,335 · App. 14/058,324 · Granted Sep 12, 2017

Method for monitoring boron dilution during a reactor outage

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,761,335
App. No.
14/058,324
Granted
Sep 12, 2017
Kind
B2
Abstract

A method for monitoring changes in the boron concentration in the coolant of a reactor during a nuclear plant outage that applies temperature compensation to the source range detector output. The method then monitors the compensated output signal to identify changes in the detector count rate above a preselected value.

Claims (78)

1. A method for determining a change in boron concentrations in a reactor coolant system as a result of a reactivity change during a nuclear plant outage comprising the steps of:

monitoring an output signal representative of a count rate of a source range neutron detector positioned outside of a reactor vessel within proximity of a core of a reactor, as a function of time, during a plant outage;

monitoring a temperature of a coolant within the reactor coolant system as a function of time;

generating a compensation signal which is a function of the monitored temperature, that when combined with the count rate output signal compensates the count rate output signal for substantially any change in the count rate output signal resulting from a change in the temperature of the coolant;

applying the compensation signal to the count rate output signal to obtain a compensated count rate output signal; and

identifying a preselected increase in the compensated count rate output signal as an indicia of a change in boron concentration.

2. The method of claim 1 wherein the compensation signal is defined as a Downcomer Temperature Attenuation Factor (DTAF) given by the expression:

DTAF( T 1 )= e −(p(T i )−p(T R ))R ;

Where the value of R is a function of distance between the source range detector and the reactor vessel and the effective macroscopic neutron removal cross section between the source range detector and the fuel assemblies on the core periphery.

3. The method of claim 2 wherein a deviation in the compensated count rate output signal (ΔC c (t)) from a selected reference ΔC (ΔC R ) is an indication that a reactivity change is happening or has happened and the value of ΔC c (t) is given by the expression:

ΔC c (t)DTAF(t)−C R .

4. The method of claim 3 wherein the application of error propagation techniques to determine the expected random fluctuations in ΔC c from one monitored count rate output signal set to the next allows the expected range of random fluctuation in ΔC c (ΔCE) to be expressed substantially as:

Δ

C

E

(

t

)

0

±

2

σ

CR

[

1

+

]

1

DTAF

(

t

)

;

Where the value of σ CR is the measured mean deviation of significant population of source range count rate measurements obtained in an interval around time t; the value of C(t) is the mean value of the data used to determine σ CR ; and the number of count rate measurements used to determine σ CR is an operator addressable constant that is a function of the desired maximum value of σ CR needed to obtain a desired reactivity change detection sensitivity.

5. The method of claim 4 including the step of determining if ΔC(t) is outside an expected range of ΔC provided by the equation

Δ

C

E

(

t

)

0

±

2

σ

CR

[

1

+

]

1

DTAF

(

t

)

;

and

identifying that a reactivity change is occurring or has occurred.

6. The method of claim 5 wherein a selected number of consecutive samples of ΔC(t) are determined with a given fraction of the samples being outside the expected range of ΔC before identifying that a reactivity change is occurring.

7. The method of claim 6 wherein the selected number of consecutive samples is approximately ten.

Assignments (9)
RELEASE OF SECURITY INTEREST IN PATENTS Recorded Jan 30, 2024
From: CREDIT SUISSE AG, CAYMAN ISLANDS, AS COLLATERAL AGENT
To: WESTINGHOUSE ELECTRIC COMPANY LLC; FAUSKE AND ASSOCIATES LLC
Reel/Frame 066380/0392 →
RELEASE OF SECURITY INTEREST IN PATENTS Recorded Jan 30, 2024
From: BANK OF MONTREAL, AS COLLATERAL AGENT
To: WESTINGHOUSE ELECTRIC COMPANY LLC; BHI ENERGY I SPECIALTY SERVICES LLC
Reel/Frame 066380/0599 →
SECURITY INTEREST Recorded Jan 26, 2024
From: WESTINGHOUSE ELECTRIC COMPANY LLC; BHI ENERGY I SPECIALTY SERVICES LLC; STONE & WEBSTER, L.L.C. (FORMERLY STONE & WEBSTER, INC.)
To: DEUTSCHE BANK AG NEW YORK BRANCH, AS COLLATERAL AGENT
Reel/Frame 066373/0604 →
PATENT SECURITY AGREEMENT Recorded May 27, 2022
From: WESTINGHOUSE ELECTRIC COMPANY LLC; BHI ENERGY I SPECIALTY SERVICES LLC
To: BANK OF MONTREAL, AS COLLATERAL AGENT
Reel/Frame 060791/0372 →
RELEASE OF SECURITY INTEREST IN PATENTS Recorded Aug 1, 2019
From: GOLDMAN SACHS BANK USA, AS COLLATERAL AGENT
To: WESTINGHOUSE ELECTRIC COMPANY LLC; FAUSKE AND ASSOCIATES LLC
Reel/Frame 049937/0032 →
SECURITY INTEREST Recorded Aug 1, 2018
From: WESTINGHOUSE ELECTRIC COMPANY LLC; FAUSKE AND ASSOCIATES LLC
To: CREDIT SUISSE AG, CAYMAN ISLANDS BRANCH, AS COLLATERAL AGENT
Reel/Frame 046708/0222 →
SECURITY INTEREST Recorded Aug 1, 2018
From: WESTINGHOUSE ELECTRIC COMPANY LLC; FAUSKE AND ASSOCIATES LLC
To: GOLDMAN SACHS BANK USA, AS COLLATERAL AGENT
Reel/Frame 046708/0332 →
SECURITY INTEREST Recorded Aug 1, 2018
From: WESTINGHOUSE ELECTRIC COMPANY LLC; FAUSKE AND ASSOCIATES LLC
To: BANK OF MONTREAL, AS ADMINISTRATIVE AGENT
Reel/Frame 046708/0639 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 21, 2013
From: PRIBLE, MICHAEL C.; BUNKER, ANDREW M.; HEIBEL, MICHAEL D.
To: WESTINGHOUSE ELECTRIC COMPANY LLC
Reel/Frame 031440/0954 →