IP Library Granted Patent US 9,512,586
Granted Patent B2
US 9,512,586 · App. 14/072,562 · Granted Dec 6, 2016

Soil densification system and method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,512,586
App. No.
14/072,562
Granted
Dec 6, 2016
Kind
B2
Abstract

A soil densification system and method is disclosed. The presently disclosed soil densification system includes an air delivery probe or pipe that can be driven or otherwise installed into a soil mass. An inlet of the air delivery probe is supplied by an air compressor and an air storage tank, which are used for the rapid delivery of air impulses or bursts into the air delivery probe, whereas the air impulses or bursts are expelled out of an outlet of the air delivery probe and into the soil mass. The method of using the presently disclosed soil densification system includes the steps of inserting the end of the air delivery probe into the soil mass to any desired depth and then releasing an impulse or burst of air into the soil mass, thereby forming a densified region in the soil mass via the forces of the air impulse.

Claims (23)

1. A method of densification of a soil mass, comprising:

a. providing an apparatus for controlled air soil densification, comprising:

1) a primary tube having an upper portion and a lower end portion;

2) one or more ports formed in the primary tube at the lower end portion; and

3) a pressurized air system connected to the primary tube, wherein the pressurized air system further comprises a stored volume of air connected to an air source, the pressurized air system configured to deliver controlled air bursts into the primary tube and configured to deliver controlled air bursts into the soil mass;

b. inserting the end portion of the primary tube to a desired soil treatment level depth in the soil mass;

c. releasing an air impulse at the one or more ports to form a void surrounded by a zone of densification;

d. maintaining the lower end portion of the primary tube at the desired soil treatment level depth in the soil mass while releasing the air impulse;

e. filling the void in the soil mass created by the air impulse at the one or more ports with flowable media via the primary tube.

2. The method of claim 1 , wherein the one or more ports comprise at least one of an open end of the tube and a closure mechanism operable between an open position and a closed position, and the closure mechanism is placed in the closed position upon insertion of the primary tube in the soil mass and is placed in the open position upon releasing of the air impulse.

3. The method of claim 1 , wherein the one or more ports comprise a plurality of ports spaced along the end portion of the primary tube and the primary tube contains a shutter system for selectively opening or closing the plurality of ports spaced along the end portion of the primary tube, and further wherein the shutter is placed in the closed position upon insertion of the primary tube in the soil mass and is placed in the open position upon releasing of the air impulse.

4. The method of claim 1 , wherein the flowable media comprises one or more of sand, gravel, recycled materials, waste materials, tire chips, concrete, or grout.

5. The method of claim 1 , wherein the apparatus further comprises a secondary tube.

6. The method of claim 5 , wherein the primary tube is internal to and concentric with the secondary tube and wherein the offset between the primary tube and secondary tube is substantially constant.

7. The method of claim 5 , wherein the secondary tube is external to and alongside the primary tube.

8. The method of claim 5 , wherein the primary tube is internal to and alongside the secondary tube and wherein the offset between the primary tube and secondary tube is not constant.

9. The method of claim 1 , wherein the void is filled by loose soil that collapses from above the zone of densification to fill the void.

10. The method of claim 1 , wherein the step of releasing an air impulse is repeated more than one time at a given elevation.

11. The method of claim 1 , further comprising raising the primary tube up a determined distance after filling the void, providing a subsequent air impulse, and filling a resulting void created by the subsequent air impulse.

12. The method of claim 11 , further comprising repeating the steps of raising the primary tube up the determined distance after filling the void, providing the subsequent air impulse, and filling the resulting void created by the subsequent air impulse, until the required treatment depth is complete.

13. The method of claim 1 , wherein the method is performed on a single column of material in the soil mass.

14. The method of claim 1 , wherein the method is performed on two or more columns of material in the soil mass.

15. The method of claim 1 , prefabricated vertical drains are installed into the soil mass prior to the primary tube insertion step, wherein the prefabricated vertical drains facilitate rapid egress of water from the soil mass.

Assignments (9)
RELEASE OF SECURITY INTEREST Recorded Apr 26, 2022
From: WHITEHORSE CAPITAL MANAGEMENT, LLC
To: TENSAR CORPORATION, LLC; TENSAR CORPORATION; TENSAR INTERNATIONAL CORPORATION; GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY, INC.; TENSAR TECHNOLOGIES LIMITED
Reel/Frame 059804/0298 →
RELEASE OF SECURITY INTEREST Recorded Apr 26, 2022
From: ALTER DOMUS (US) LLC
To: TENSAR CORPORATION, LLC; TENSAR CORPORATION; TENSAR INTERNATIONAL CORPORATION; GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY, INC.; TENSAR TECHNOLOGIES LIMITED
Reel/Frame 059804/0380 →
PATENT SECURITY AGREEMENT (SECOND LIEN) Recorded Nov 23, 2020
From: GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY INC.; TENSAR CORPORATION, LLC; TENSAR INTERNATIONAL CORPORATION; TENSAR CORPORATION
To: ALTER DOMUS (US) LLC, AS COLLATERAL AGENT
Reel/Frame 054504/0843 →
SECURITY INTEREST Recorded Nov 20, 2020
From: GEOPIER FOUNDATION COMPANY, INC.
To: WHITEHORSE CAPITAL MANAGEMENT, LLC, AS COLLATERAL AGENT
Reel/Frame 054427/0621 →
ASSIGNMENT OF PATENT SECURITY AGREEMENT Recorded Apr 3, 2020
From: UBS AG
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 052311/0566 →
ASSIGNMENT OF PATENT SECURITY AGREEMENT Recorded Apr 3, 2020
From: UBS AG
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 052311/0625 →
SECOND LIEN PATENT SECURITY AGREEMENT Recorded Aug 13, 2014
From: GEOPIER FOUNDATION COMPANY INC.
To: UBS AG, STAMFORD BRANCH
Reel/Frame 033532/0699 →
FIRST LIEN PATENT SECURITY AGREEMENT Recorded Aug 13, 2014
From: GEOPIER FOUNDATION COMPANY INC.
To: UBS AG, STAMFORD BRANCH
Reel/Frame 033532/0807 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 27, 2014
From: GREEN, RUSSELL A.; WISSMANN, KORD J.; VERDIN, JOHN
To: GEOPIER FOUNDATION COMPANY, INC.
Reel/Frame 032540/0986 →