Abstract

Methods, systems, and computer program products for logistics management are described. A root node in a tree representing a home base may be established, the root node comprising a capacity of a corresponding delivery vehicle. One or more unassigned delivery points may be added as a child node of the root node if a path to the corresponding unassigned delivery point is feasible. A next level delivery point may be added as a child node of a node in a tree level index if the delivery point is unassigned and a path to the next level delivery point is feasible. The adding step may be repeated for each combination of unassigned delivery point and node(s) in the tree level index .

Claims (114)

1 . A computerized method for managing package delivery, the method comprising:

establishing a root node in a tree representing a home base and comprising a capacity of a corresponding delivery vehicle;

setting an index to an initial value, the index representing a level of the tree;

adding one or more unassigned delivery points as a child node of the root node if a path to the corresponding unassigned delivery point is feasible;

setting the index to the initial value plus one;

adding a next level delivery point as a child node of a node in a tree level index if the delivery point is unassigned and a path to the next level delivery point is feasible, the adding step being repeated for each combination of unassigned delivery point and node in the tree level index ;

incrementing the index; and

repeating the adding a next level delivery point and the incrementing until the index is greater than a count of delivery points.

2 . The method of claim 1 , wherein an unvisited delivery point m has an arrival time window of [LS n +T nm , LE n +T nm ] and a feasible arrival time window of

[ AS m ,AE m ]=[LS n +T nm ,LE n +T nm ]∩[TS m −TW,TE m ],

where LS n is a start of a feasible time window for node n in the tree;

LE n is an end of the feasible time window for node n in the tree;

T nm is a travel time from point n to point m;

TS m is a start of a required time window for demand point d;

TE m is an end of the required time window for demand point d;

AS m is a start of the feasible arrival time window for node n in the tree;

AE m is an end of a feasible arrival time window for node n in the tree; and

TW is a maximum wait time at a demand point.

3 . The method of claim 2 , wherein a delivery point is feasible if

[ LS n +T nm ,LE n +T nm ]∩[TS m −TW,TE m ]≠Ø and W m ≦C n

where LS n is a start of a feasible time window for node n in the tree;

LE n is an end of the feasible time window for node n in the tree;

T nm is a travel time from point n to point m;

TS m is a start of a required time window for demand point d;

TE m is an end of the required time window for demand point d;

W m is a weight of a delivery for demand point m;

C is a capacity of a truck; and

TW is a maximum wait time at a demand point.

4 . The method of claim 2 , wherein a feasible departure time window is

[ LS m ,LE m ]=[max( AS m ,TS m )+ TU m ,max( AE m ,TS m )+ TU m ]

where LS m is a start of a feasible time window for node m in the tree;

LE m is an end of the feasible time window for node m in the tree;

TS m is a start of a required time window for demand point d;

AS m is a start of a feasible arrival time window for node n in the tree;

AE m is an end of the feasible arrival time window for node n in the tree; and

TU m is an unloading time for demand point m.

5 . The method of claim 1 , further comprising pruning paths that contain a count of nodes that is less than a node threshold.

6 . The method of claim 1 , further comprising pruning paths where a total weight of deliveries on the route is lower than a weight threshold.

7 . The method of claim 1 , further comprising pruning a path of a duplicate set of paths whose finish time is later than another path of the duplicate set.

8 . The method of claim 1 , further comprising pruning a path of a duplicate set of paths whose travel distance is longer than another path of the duplicate set.

9 . The method of claim 1 , wherein a profit for a route is o=r−s G−t P

where o is the profit;

r is a total delivery revenue for the route;

s is a sum of travel distances between consecutive nodes on the route and a direct distance from a leaf node to the home base;

G is a cost for a truck to travel a unit distance;

t is a total travel time; and

P is a cost for a truck driver to be outside the home base per unit of time.

10 . An apparatus for managing package delivery, the apparatus comprising:

a processor;

memory to store instructions that, when executed by the processor cause the processor to:

establish a root node in a tree representing a home base and comprising a capacity of a corresponding delivery vehicle;

set an index to an initial value, the index representing a level of the tree;

add one or more unassigned delivery points as a child node of the root node if a path to the corresponding unassigned delivery point is feasible;

set the index to the initial value plus one;

add a next level delivery point as a child node of a node in a tree level index if the delivery point is unassigned and a path to the next level delivery point is feasible, the adding step being repeated for each combination of unassigned delivery point and node in the tree level index ;

increment the index; and

repeat the adding a next level delivery point and the incrementing until the index is greater than a count of delivery points.

11 . The apparatus of claim 10 , wherein an unvisited delivery point m has an arrival time window of [LS n +T nm , LE n +T nm ] and a feasible arrival time window of

[ AS m ,AE m ]=[LS n +T nm ,LE n +T nm ]∩[TS m −TW,TE n ],

where LS n is a start of a feasible time window for node n in the tree;

LE n is an end of the feasible time window for node n in the tree;

T nm is a travel time from point n to point m;

TS m is a start of a required time window for demand point d;

TE m is an end of the required time window for demand point d;

AS m is a start of the feasible arrival time window for node n in the tree;

AE m is an end of a feasible arrival time window for node n in the tree; and

TW is a maximum wait time at a demand point.

12 . The apparatus of claim 11 , wherein a delivery point is feasible if

[ LS n +T nm ,LE n +T nm ]∩[TS m −TW,TE m ]≠Ø and W m ≦C n

where LS n is a start of a feasible time window for node n in the tree;

LE n is an end of the feasible time window for node n in the tree;

T nm is a travel time from point n to point m;

TS m is a start of a required time window for demand point d;

TE m is an end of the required time window for demand point d;

W m is a weight of a delivery for demand point m;

C is a capacity of a truck; and

TW is a maximum wait time at a demand point.

13 . The apparatus of claim 11 , wherein a feasible departure time window is

[LS m ,LE m ]=[max( AS m ,TS m )+ TU m ,max( AE m ,TS m )+ TU m ]

where LS m is a start of a feasible time window for node m in the tree;

LE m is an end of the feasible time window for node m in the tree;

TS m is a start of a required time window for demand point d;

AS m is a start of a feasible arrival time window for node n in the tree;

AE m is an end of the feasible arrival time window for node n in the tree; and

TU m is an unloading time for demand point m.

14 . The apparatus of claim 10 , further comprising instructions that, when executed by the processor, cause the processor to prune paths that contain a count of nodes that is less than a node threshold.

15 . The apparatus of claim 10 , further comprising instructions that, when executed by the processor, cause the processor to prune paths where a total weight of deliveries on the route is lower than a weight threshold.

16 . The apparatus of claim 10 , further comprising instructions that, when executed by the processor, cause the processor to prune a path of a duplicate set of paths whose finish time is later than another path of the duplicate set.

17 . The apparatus of claim 10 , further comprising instructions that, when executed by the processor, cause the processor to prune a path of a duplicate set of paths whose travel distance is longer than another path of the duplicate set.

18 . The apparatus of claim 10 , wherein a profit for a route is o=r−s G−t P

where o is the profit;

r is a total delivery revenue for the route;

s is a sum of travel distances between consecutive nodes on the route and a direct distance from a leaf node to the home base;

G is a cost for a truck to travel a unit distance;

t is a total travel time; and

P is a cost for a truck driver to be outside the home base per unit of time.

19 . A non-transitory machine-readable storage medium comprising instructions that, when executed by one or more processors of a machine, cause the machine to perform operations comprising:

establishing a root node in a tree representing a home base and comprising a capacity of a corresponding delivery vehicle;

setting an index to an initial value, the index representing a level of the tree;

adding one or more unassigned delivery points as a child node of the root node if a path to the corresponding unassigned delivery point is feasible;

setting the index to the initial value plus one;

adding a next level delivery point as a child node of a node in a tree level index if the delivery point is unassigned and a path to the next level delivery point is feasible, the adding step being repeated for each combination of unassigned delivery point and node in the tree level index ;

incrementing the index; and

repeating the adding a next level delivery point and the incrementing until the index is greater than a count of delivery points.

20 . The non-transitory machine-readable storage medium of claim 19 , wherein an unvisited delivery point m has an arrival time window of [LS n +T nm , LE n +T nm ] and a feasible arrival time window of

[ AS m ,AE m ]=[LS n +T nm ,LE n +T nm ]∩[TS m −TW,TE m ],

where LS n is a start of a feasible time window for node n in the tree;

LE n is an end of the feasible time window for node n in the tree;

T nm is a travel time from point n to point m;

TS m is a start of a required time window for demand point d;

TE m is an end of the required time window for demand point d;

AS m is a start of the feasible arrival time window for node n in the tree;

AE m is an end of a feasible arrival time window for node n in the tree; and

TW is a maximum wait time at a demand point.

Assignments (3)
CHANGE OF NAME Recorded Aug 26, 2014
From: SAP AG
To: SAP SE
Reel/Frame 033625/0223 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 22, 2013
From: LI, WEN-SYAN
To: SAP AG
Reel/Frame 031657/0057 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 9, 2013
From: LUWANG, TIANYU; WANG, MENGJIAO
To: SAP AG
Reel/Frame 031573/0115 →