IP Library Granted Patent US 9,249,682
Granted Patent B2
US 9,249,682 · App. 14/079,892 · Granted Feb 2, 2016

Steam turbine power plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,249,682
App. No.
14/079,892
Granted
Feb 2, 2016
Kind
B2
Abstract

Disclosed is a steam turbine power plant adapted to start operating very efficiently by highly accurate look-ahead control of a plurality of its startup constraints. The power plant includes a fundamental startup constraint prediction device 32 that calculates from a control input variable of the controller 12, 14 a prediction period about a fundamental startup constraint which is short in response time, a reference control input variables calculating device 33 that calculates such a reference control input variable of the controller 12, 14 as the value predicted and calculated by the fundamental startup constraint prediction device 32 will not exceed a limit value, other startup constraint prediction devices 35 a, 35 b each calculating a corresponding prediction period of data about desired one of other startup constraints from the prediction period of reference control input variables data, other control input variable calculating devices 36 a, 36 b each calculating corresponding other control input variables of the controller 12, 14 from the value predicted and calculated by the other startup constraint prediction device 35 a, 35 b , and a control signal output device 40, 41, 42 or 43 that outputs a command value to the controller 12, 14 in accordance with a value selected from the reference control input variable and the other control input variable.

Claims (28)

1. A steam turbine power plant, comprising:

a heat source equipment that heats a low-temperature flow by applying a heat medium and thus generates a high-temperature flow;

a steam generator that generates steam using the high-temperature flow generated by the heat source equipment;

a steam turbine driven by the steam generated by the steam generator;

an electric generator that converts rotational motive power of the steam turbine into electric power;

a controller that controls a plant load; and

a steam turbine starting control device that predicts a value of a startup constraint due to a change in physical quantities of the steam in the steam turbine, and controls the controller according to the predicted value;

wherein the steam turbine starting control device includes:

at least one fundamental startup constraint prediction device calculating from a control input variable of the controller a prediction period of fundamental startup constraint data about a fundamental startup constraint which is short in response time with respect to the change in the physical quantities of the steam;

at least one reference control input variables calculating device calculating such a reference control input variable of the controller as the value predicted and calculated by the fundamental startup constraint prediction device will not exceed a corresponding limit value;

at least one other startup constraint prediction device calculating a corresponding prediction period of data about one of other startup constraints longer than the fundamental startup constraint in response time, from the prediction period of reference control input variables data;

at least one other control input variables calculating device calculating such an other control input variable of the controller as the value predicted and calculated by the corresponding other startup constraint prediction device will not exceed a corresponding limit value; and

a control signal output device that outputs a command value to the controller according to a value selected from the reference control input variable and the other control input variable.

2. The steam turbine power plant according, to claim 1 , wherein:

the controller includes

a heat medium flow controller that controls a flow rate of the heat medium supplied to the heat source equipment, and

a main steam flow control valve that controls a flow rate of a main flow of the steam supplied to the steam turbine;

the heat medium flow controller is controlled to bring a predicted value of the startup constraint close to a corresponding limit value; and

the main steam flow control valve is controlled to bring a current value of the startup constraint close to a corresponding limit value.

3. The power plant according to claim 1 , wherein:

a plurality of kinds of startup constraints are selected as those of the other startup constraint; and

one set of devices including the other startup constraint prediction device and the other control input variables calculating device are provided for each of the plurality of kinds of startup constraints.

4. The power plant according to claim 3 , wherein:

a plurality of kinds of startup constraints are selected as those of the fundamental startup constraint; and

one set of devices including the fundamental startup constraint prediction device and the fundamental control input variables calculating device are provided for each of the plurality of kinds of fundamental startup constraints.

5. A planned-startup curve creating system, comprising:

the steam turbine starting control device of claim 1 ; and

a plant simulator that simulates characteristics of the steam turbine power plant, the simulator being further configured to exchange signals with the steam turbine starting control device and sample the command value addressed to the controller during a startup period calculated by the steam turbine starting control device.

Assignments (4)
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVING PATENT APPLICATION NUMBER 11921683 PREVIOUSLY RECORDED AT REEL: 054975 FRAME: 0438. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded May 26, 2023
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 063787/0867 →
CHANGE OF NAME Recorded Jan 13, 2021
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 054975/0438 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 17, 2014
From: HITACHI, LTD.
To: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
Reel/Frame 033763/0701 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 5, 2013
From: YOSHIDA, YASUHIRO; YOSHIDA, TAKUYA; YASHIKI, TATSURO; NOMURA, KENICHIRO; YAMANAKA, KAZUNORI; TOMIZAWA, MASAAKI; TAKAHASHI, YUICHI; SUZUKI, FUMIYUKI
To: HITACHI, LTD.
Reel/Frame 031726/0172 →