IP Library Granted Patent US 9,581,049
Granted Patent B2
US 9,581,049 · App. 14/095,424 · Granted Feb 28, 2017

Warming arrangement for a power plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,581,049
App. No.
14/095,424
Granted
Feb 28, 2017
Kind
B2
Abstract

The invention relates to a warming arrangement having a warming system for warming a steam turbine. The warming system has a makeup line and recycle line fluidly connected to the steam turbine. A gas moving device and a heater are located in either of these two lines. The warming system further includes a pressure measurement device that is configured and arranged to determine a gauge pressure in the steam turbine as well as a controller. The controller is configured to control a flow rate of the warming gas through the steam turbine, based on the pressure measurement device.

Claims (26)

1. A warming arrangement, for a power plant, comprising:

a first steam turbine, for expanding steam; and

a first warming system, for warming the first steam turbine using a first warming gas, the first warming system includes:

a first makeup line, fluidly connected to the first steam turbine, for directing the first warming gas into the first steam turbine;

a first recycle line, fluidly connected to the first steam turbine, for conveying the first warming gas from the first steam turbine,

a first gas moving device, in either the first makeup line or the first recycle line, configured and arranged to move the first warming gas through the first warming system;

a first heater, in either the first makeup line or the first recycle line so as to heat the first warming gas before it enters the first steam turbine;

a first pressure measurement device configured and arranged to determine a gauge pressure in the first steam turbine;

a first moisture measurement device located and arranged to estimate a moisture content of the first warming gas in the first steam turbine; and

a controller, configured to control a flow rate of the first warming gas through the first steam turbine, based on the first pressure measurement device, and configured to control at least one of a temperature of the first warming gas and the flow rate of the first warming gas based on the moisture content measured by the first moisture measurement device;

wherein the first steam turbine has a feed line and an exhaust line which in combination are arranged to direct a main steam through the first steam turbine during operation, wherein points of connection of the first makeup line to the first steam turbine and points of connection of the first recycle line to the first steam turbine are distinct and separate from points of connection of the feed line to the first steam turbine and points of connection of the exhaust line to the first steam turbine.

2. The arrangement of claim 1 wherein the controller is configured and arranged to control the flow rate by the first gas moving device.

3. The arrangement of claim 1 wherein each of the first makeup line and the first recycle line includes at least one block valve for isolating the first warming system from the first steam turbine during operation of the first steam turbine.

4. The arrangement of claim 1 wherein the first moisture measurement device is located in the first steam turbine.

5. The arrangement of claim 1 further comprising a heat recuperator, spanning the first makeup line and the first recycle line, for exchanging thermal energy between the first warming gas flowing through the first makeup line and the first recycle line respectively.

6. The arrangement of claim 5 wherein the first gas moving device is located in the first makeup line upstream of the heat recuperator.

7. The arrangement of claim 1 wherein an end of the first recycle line is connected to the first makeup line to create a circular first warming gas flow path that includes the first steam turbine, the first gas moving device and the first heater.

8. The arrangement of claim 7 wherein the first recycle line is connected to the first makeup line by a control valve wherein the control valve includes the circular first warming gas flow path therethrough from:

the first recycle line to the first makeup line,

so as to enable a flow ratio of warm gas entering the circular first warming gas flow path and circulating around the circular first warming gas flow path to be varied.

9. The arrangement of claim 1 further comprising a second steam turbine and a second warming system for warming the second steam turbine using a second warming gas.

10. The arrangement of claim 9 the second warming system further comprising:

a third steam turbine for further expanding steam from the second steam turbine; and

a condenser connected to an outlet of the third steam turbine.

11. The arrangement of claim 1 wherein the first steam turbine includes a plurality of makeup lines, each makeup line of the plurality of makeup lines having a respective end point wherein each end point is fluidly connected to and axially distributed along the first steam turbine so as to enable a plurality of warming gas streams to be fed into the first steam turbine.

12. The arrangement of claim 11 wherein the first warming system further includes a temperature measurement device that is connected to the controller wherein the temperature measurement device is configured and arranged to measure a temperature of the first steam turbine.

Assignments (4)
CORRECTIVE ASSIGNMENT TO CORRECT THE RECEIVING PARTY'S ADDRESS PREVIOUSLY RECORDED ON REEL 71474 FRAME 283. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jun 30, 2025
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: GE VERNOVA INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 071771/0479 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 3, 2025
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: GE VERNOVA INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 071474/0283 →
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 27, 2014
From: HELBIG, KLAUS; KÜHNE, CHRISTIAN; MOHR, WOLFGANG FRANZ DIETRICH
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 032314/0629 →