Corrosion resistant bimetallic tube manufactured by a two-step process
A method of producing a bimetallic tubular component includes providing a first tubular workpiece having an inner diameter and a second tubular workpiece having an outer diameter. The first and second tubular workpieces have dissimilar cold-working processing parameters. The method further includes diffusion bonding the inner diameter of the first tubular workpiece to the outer diameter of the second tubular workpiece, and flowforming the diffusion bonded tubular workpieces to form the bimetallic tubular component.
1. A method of producing a bimetallic tubular component, the method comprising:
providing a first tubular workpiece having an inner diameter and a second tubular workpiece having an outer diameter, the first and second tubular workpieces having dissimilar cold-working processing parameters, wherein the second tubular workpiece comprises a corrosion resistant alloy, wherein the first tubular workpiece comprises one of a duplex stainless steel and an aluminum alloy, wherein the first tubular workpiece has a hardness of 100 Vickers or greater, and wherein the second tubular workpiece has a hardness value greater than two times the hardness value of the first tubular workpiece;
diffusion bonding the inner diameter of the first tubular workpiece to the outer diameter of the second tubular workpiece; and
flowforming the diffusion bonded tubular workpieces to form the bimetallic tubular component without any heat treatment after the flowforming.
2. The method of claim 1 , wherein the cold-working processing parameters are selected from the group consisting of feed rates, speed rates, and wall reduction percentages.
3. The method of claim 1 , wherein the diffusion bonding is a hot isostatic pressing process.
4. The method of claim 3 , wherein the hot isostatic pressing process is performed in an inert atmosphere.
5. The method of claim 1 , wherein each tubular workpiece has an end and a gap is formed between the inner diameter and the outer diameter, the method further comprising:
providing a port that goes through the first tubular workpiece to the gap between the two workpieces;
sealing the end of the first tubular workpiece to the end of the second tubular workpiece in order to form a sealed area between the two workpieces; and
forming a vacuum between the two workpieces in the gap before the diffusion bonding process.
6. The method of claim 1 , wherein the second tubular workpiece comprises one of Alloy C-276 and Alloy 625.
7. The method of claim 1 , wherein the diffusion bonded tubular workpieces are flowformed to a wall reduction of 20% to 31.7%.