IP Library Granted Patent US 9,470,069
Granted Patent B2
US 9,470,069 · App. 14/113,285 · Granted Oct 18, 2016

Subsea well assembly and associated method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,470,069
App. No.
14/113,285
Granted
Oct 18, 2016
Kind
B2
Abstract

Subsea well assembly having a Xmas tree ( 107, 207 ) and wellhead ( 103 ). From a tubing hanger ( 113 ) a tubing extends into the well. A part of a production flow passage extends vertically from the tubing hanger ( 113 ) in a vertical bore ( 111 ) of the Xmas tree. A fail close production master valve (PMV) ( 117 ) is arranged in the production flow passage. The tubing hanger ( 113 ) is arranged below the Xmas tree ( 107 ), such as in the wellhead ( 103 ). The Xmas tree ( 107 ) exhibits a branch ( 115 ) that deviates from the vertical bore ( 111 ), which branch constitutes part of the production flow passage. The fail close type production master valve (PMV) ( 117 ) is arranged in the branch ( 115 ).

Claims (54)

1. A method comprising:

providing a subsea xmas tree configured to connect to at least one of:

a wellhead located below the tree and comprising a tubing hanger, and

a tubing spool located below the tree and comprising a tubing hanger;

the tree comprising:

a production flow passage having:

a vertical bore extending through the xmas tree from the wellhead or tubing spool through an upper part of the tree, and

a branch that deviates from the vertical bore, the branch located below the upper part;

a plug profile in a top section of the vertical bore, the plug profile configured to lock an ESP plug such that the locked ESP plug seals the vertical bore, the ESP plug configured to control an Electric Submersible Pump (ESP);

a fail-close type production master valve in the branch; and

a production wing valve in the branch,

wherein the tree is connected to a wellhead or a tubing spool;

the method further comprising:

landing a BOP on top of the tree;

suspending an ESP in a downhole position below the tree via a suspension string connecting the ESP to the ESP plug; and

removing the BOP.

2. The method of claim 1 , wherein the production wing valve includes a fail-close type valve.

3. The method of claim 2 , wherein the tree further comprises a fail-in-place valve in the vertical bore below the branch.

4. The method of claim 1 , wherein the tree is configured to connect to a wellhead located below the tree and comprising a tubing hanger.

5. The method of claim 1 , wherein the tree is configured to connect to a tubing spool located below the tree and comprising a tubing hanger.

6. The method of claim 1 , wherein the tree further comprises a fail-in-place valve in the vertical bore below the branch.

7. The method of claim 1 , wherein the tree further comprises a tree cap installed in the upper part and configured to form a barrier between the vertical bore and an environment external to the tree.

8. The method of claim 1 , wherein the production flow passage does not comprise a sleeve, pipe, or tube within the vertical bore.

9. The method of claim 1 , wherein the tree further comprises a primary swab valve in the vertical bore above the branch.

10. The method of claim 4 , further comprising:

providing a subsea production assembly comprising:

a wellhead comprising a tubing hanger;

wherein the tree is connected to the wellhead;

an ESP plug locked into the plug profile; and

an ESP suspended downhole below the tree via a suspension string connecting the ESP to the ESP plug.

11. The method of claim 10 , wherein the subsea production assembly further comprises:

a tree cap installed in the upper part of the tree; and

an electrical wet-mate connector connecting the ESP plug to the tree cap.

12. The method of claim 5 , further comprising:

providing a subsea production assembly comprising:

a tubing spool connected to a wellhead and comprising a tubing hanger;

wherein the tree is connected to the tubing spool;

an ESP plug locked into the plug profile; and

an ESP suspended downhole below the tree via a suspension string connecting the ESP to the ESP plug.

13. The method of claim 12 , wherein the subsea production assembly further comprises:

a tree cap installed in the upper part of the tree; and

an electrical wet-mate connector connecting the ESP plug to the tree cap.

14. The method of claim 1 , further comprising connecting a tree cap to the upper part of the tree.

15. The method of claim 1 , further comprising

providing a subsea assembly comprising:

a wellhead comprising a tubing hanger, or

a tubing spool connected to a wellhead and comprising a tubing hanger, and

wherein the subsea xmas tree is connected to the wellhead or tubing spool;

wherein the subsea assembly further comprises:

an ESP plug locked into the plug profile; and

an ESP suspended downhole below the tree via a suspension string connecting the ESP to the ESP plug;

the method further comprising:

opening the production master valve and production wing valve; and

activating the ESP to aid production through the production flow passage.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 10, 2025
From: AKER SOLUTIONS AS
To: ONESUBSEA AS
Reel/Frame 073171/0859 →
MERGER AND CHANGE OF NAME Recorded Mar 2, 2017
From: AKER SUBSEA AS; AKER SOLUTIONS AS
To: AKER SOLUTIONS AS
Reel/Frame 041859/0328 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 19, 2013
From: STUBBEMAN, ROBERT
To: AKER SUBSEA AS
Reel/Frame 031630/0424 →