IP Library Granted Patent US 9,458,530
Granted Patent B2
US 9,458,530 · App. 14/124,306 · Granted Oct 4, 2016

Method of supplying Zn—Al alloy to molten zinc pot, method of adjusting concentration of Al in molten zinc bath, and apparatus for supplying Zn—Al alloy to molten zinc pot

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,458,530
App. No.
14/124,306
Granted
Oct 4, 2016
Kind
B2
Abstract

A method of supplying a Zn—Al alloy to a molten zinc pot which accommodates a molten zinc bath in a hot dip galvanizing line, includes: supplying the Zn—Al alloy from a supply portion provided at a lower portion of an insertion guide having a pipe shape, in which the supply portion is immersed between an inner wall of the molten zinc pot on a downstream side in a travelling direction of a steel sheet and a front support roll installed in the molten zinc bath at a depth within ±400 mm from a lower end of the front support roll, and an inside of the insertion guide is pressurized by inert gas to prevent the molten zinc bath from advancing to the inside of the insertion guide.

Claims (15)

1. A method of supplying a Zn—Al alloy to a molten zinc pot which accommodates a molten zinc bath in a hot dip galvanizing line, the method comprising:

supplying the Zn—Al alloy from a supply portion provided at a lower portion of an insertion guide having a pipe shape,

wherein the supply portion is immersed between an inner wall of the molten zinc pot on a downstream side in a travelling direction of a steel sheet and a front support roll installed in the molten zinc bath at a depth within ±400 mm from a lower end of the front support roll,

an inside of the insertion guide is pressurized by inert gas to prevent the molten zinc bath from advancing to the inside of the insertion guide,

the steel sheet has a first area in which the steel sheet is in contact with the front support roll, and a second area in which the steel sheet is out of contact with the front support roll and moves away from the front support roll,

the front support roll is placed between the inner wall of the molten zinc pot on a downstream side in the travelling direction of the steel sheet and a boundary between the first area and the second area,

the front support roll rotates so that a discharge flow is generated between the front support roll in the molten zinc bath and the steel sheet, moves toward the downstream side in the traveling direction of the steel sheet, collides with the inner wall of the molten zinc pot on the downstream side in the travelling direction of the steel sheet, and is separated into an upper flow and a lower flow so as to be circulated through the molten zinc pot, and

the supply portion of the insertion guide is installed at a position where the discharge flow moves toward the downstream side in the traveling direction of the steel sheet.

2. The method of supplying a Zn—Al alloy to a molten zinc pot according to claim 1 , wherein the Zn—Al alloy has a form of any one of a wire, a chip, and powder.

3. A method of adjusting a concentration of Al in a molten zinc bath, the method comprising:

controlling an amount of the Zn—Al alloy supplied according to the method of supplying a Zn—Al alloy to a molten zinc pot according to claims 1 or 2 depending on the concentration of Al measured by an Al concentration meter installed in the molten zinc pot.

4. The method of supplying a Zn—Al alloy to a molten zinc pot according to claim 1 , wherein a distance between the front support roll and a surface of the molten zinc bath is 500 mm or longer.

5. The method of supplying a Zn—Al alloy to a molten zinc pot according to claim 1 , the method further comprising:

controlling an internal pressure of the insertion guide by controlling an amount of the inert gas using a pressure meter and a valve.

6. The method of supplying a Zn—Al alloy to a molten zinc pot according to claim 1 , wherein the steel sheet moves in the vertical direction at the boundary.

Assignments (2)
CHANGE OF NAME Recorded May 14, 2019
From: NIPPON STEEL & SUMITOMO METAL CORPORATION
To: NIPPON STEEL CORPORATION
Reel/Frame 049257/0828 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 6, 2013
From: YAMAUCHI, YU; KAWAMURA, MIKIO; OMODAKA, MASAAKI; NISHIMURA, HIDEKI
To: NIPPON STEEL & SUMITOMO METAL CORPORATION
Reel/Frame 031729/0439 →