IP Library Granted Patent US 9,685,665
Granted Patent B2
US 9,685,665 · App. 14/125,345 · Granted Jun 20, 2017

System and method for thermal priority operation of a fuel cell power plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,685,665
App. No.
14/125,345
Granted
Jun 20, 2017
Kind
B2
Abstract

A thermal priority fuel cell power plant includes a cell stack assembly for generating an electrical power output. The cell stack assembly includes an anode, a cathode, and a waste heat recovery loop. The waste heat recovery loop is configured to remove waste heat generated from the electrochemical reaction and is thermally coupled to the cell stack assembly for managing the waste heat of the cell stack assembly and for supplying thermal power to a thermal load demand. The waste heat recovery loop includes a heat exchanger in heat exchange relationship with the coolant outlet conduit and the thermal load demand. A controller is operatively associated with the cell stack assembly and the waste heat recovery loop. The controller controls the operation of the cell stack assembly by adjusting a fuel cell power plant parameter responsive to the thermal load demand.

Claims (25)

1. A fuel cell power plant comprising:

a cell stack assembly for generating an electrical power output, the cell stack assembly comprising an anode and a cathode, the anode is configured to receive a fuel, the cathode is configured to receive an oxidizer, the cell stack assembly is configured to generate the electrical power output by electrochemically reacting the anode fuel and the cathode oxidizer in the presence of a catalyst;

a waste heat recovery loop thermally coupled to the cell stack assembly for managing waste heat of the cell stack assembly and for supplying thermal power to a thermal load demand, the waste heat recovery loop comprising a coolant inlet conduit and a coolant outlet conduit and configured to remove waste heat generated from the electrochemical reaction and comprising a heat exchanger in heat exchange relationship with the coolant outlet conduit and the thermal load demand; and

a controller operatively associated with the cell stack assembly and the waste heat recovery loop, the controller controlling the operation of the cell stack assembly by adjusting a fuel cell power plant parameter responsive to the thermal load demand, wherein the electrical power output of the cell stack assembly is decoupled from the thermal power being supplied to the thermal load demand.

2. The fuel cell power plant of claim 1 , wherein the thermal load demand comprises a facility load demand and the heat exchanger in the waste heat recovery loop comprises a high grade heat exchanger.

3. The fuel cell power plant of claim 2 , wherein the thermal load demand comprises a demand for direct heat.

4. The fuel cell power plant of claim 2 , wherein the thermal load demand comprises a demand for indirect cooling.

5. The fuel cell power plant of claim 4 , wherein the waste heat recovery loop is thermally coupled to a double effect absorption chiller.

6. The fuel cell power plant of claim 1 , wherein the adjustment of the fuel cell power plant fuel cell power plant parameter equalizes the thermal power with the thermal load demand.

7. The fuel cell power plant of claim 1 , wherein the adjustment of the fuel cell power plant fuel cell power plant parameter maximizes the thermal power output.

8. The fuel cell power plant of claim 1 , wherein the fuel cell power plant fuel cell power plant parameter is cell stack coolant exit temperature.

9. The fuel cell power plant of claim 1 , wherein the fuel cell power plant parameter is reactant utilization.

10. The fuel cell power plant of claim 9 , wherein the fuel utilization is decreased.

11. The fuel cell power plant of claim 9 , wherein the oxidant utilization is increased.

12. The fuel cell power plant of claim 1 , further comprising a fuel processing system, and the fuel cell power plant parameter is a temperature for a thermal management system accumulator.

13. A fuel cell power plant comprising:

a cell stack assembly for generating an electrical power output, the cell stack assembly comprising an anode, and a cathode, the anode is configured to receive a fuel, the cathode is configured to receive an oxidizer, the cell stack assembly is configured to generate the electrical power output by electrochemically reacting the anode fuel and the cathode oxidizer in the presence of a catalyst;

a waste heat recovery loop thermally coupled to the cell stack assembly for managing waste heat of the cell stack assembly and for supplying thermal power to a thermal load demand, the waste heat recovery loop comprising a coolant inlet conduit and a coolant outlet conduit and configured to remove waste heat generated from the electrochemical reaction and comprising a heat exchanger in heat exchange relationship with the coolant outlet conduit and the thermal load demand; and

a controller operatively associated with the cell stack assembly and the waste heat recovery loop, the controller controlling the operation of the cell stack assembly by adjusting reactant utilization responsive to the thermal load demand.

14. The fuel cell power plant of claim 13 , wherein the fuel utilization is decreased.

15. The fuel cell power plant of claim 13 , wherein the oxidant utilization is increased.

16. The fuel cell power plant of claim 13 , wherein the electrical power output of the cell stack assembly is decoupled from the thermal power being supplied to the thermal load demand.

17. The fuel cell power plant of claim 13 , wherein adjusting the reactant utilization equalizes the thermal power with the thermal load demand.

18. The fuel cell power plant of claim 13 , wherein adjusting the reactant utilization maximizes the thermal power output.

19. The fuel cell power plant of claim 13 , comprising a fuel processing system, and wherein the controller controls operation of the cell stack assembly to adjust a temperature for a thermal management system accumulator of the fuel processing system.

Assignments (5)
CORRECTIVE ASSIGNMENT TO CORRECT THE THE ASSIGNEE ADDRESS PREVIOUSLY RECORDED AT REEL: 059364 FRAME: 0046. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded May 13, 2022
From: DOOSAN FUEL CELL AMERICA, INC.
To: HYAXIOM, INC.
Reel/Frame 060062/0957 →
CHANGE OF NAME Recorded Mar 14, 2022
From: DOOSAN FUEL CELL AMERICA, INC.
To: HYAXIOM, INC.
Reel/Frame 059364/0046 →
CHANGE OF NAME Recorded Oct 22, 2014
From: CLEAREDGE POWER CORPORATION
To: CLEAREDGE POWER, LLC
Reel/Frame 034032/0976 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 5, 2014
From: CLEAREDGE POWER, INC., CLEAREDGE POWER, LLC, CLEAREDGE POWER INTERNATIONAL SERVICE, LLC
To: DOOSAN FUEL CELL AMERICA, INC.
Reel/Frame 033472/0094 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 29, 2014
From: RAMASWAMY, SITARAM; MARGIOTT, PAUL R.; HANRAHAN, PAUL R.; KAMAT, MITHUN
To: CLEAREDGE POWER CORPORATION
Reel/Frame 032072/0677 →