IP Library Granted Patent US 9,445,338
Granted Patent B2
US 9,445,338 · App. 14/141,876 · Granted Sep 13, 2016

Reconfiguration control channel resource mapping collision avoidance

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,445,338
App. No.
14/141,876
Granted
Sep 13, 2016
Kind
B2
Abstract

A device includes a transceiver to receive, from a base station, a physical downlink shared channel (PDSCH) transmission and processing circuitry to classify downlink (DL) subframe types for a set of DL subframes associated with a first uplink (UL) subframe for transmission of a hybrid automatic report request acknowledgment (HARQ-ACK) and perform physical uplink control channel (PUCCH) resources mapping based on the classified DL subframe Types for an acknowledgement transmission associated with PDSCH transmission reception.

Claims (1352)

1. A device comprising:

a transceiver to receive, from a base station, a physical downlink shared channel (PDSCH) transmission; and

processing circuitry to:

classify downlink (DL) subframe types for a set of DL subframes associated with a first uplink (UL) subframe for transmission of a hybrid automatic report request acknowledgment (HARQ-ACK), wherein the DL subframe types comprise at least Type 1 subframes that are constructed by DL subframes that are associated with the first uplink (UL) subframe for transmission of HARQ-ACK according to a time division duplex (TDD) UL/DL configuration indicated in a system information block Type 1(SIB1) message; and

perform physical uplink control channel (PUCCH) resources mapping based on the classified DL subframe Types for an acknowledgement transmission associated with PDSCH transmission reception

wherein the DL subframe types further comprise:

Type 2 DL subframes that are constructed by:

firstly identifying DL subframes that are associated with the first UL subframe for transmission of HARQ-ACK according to a higher layer configured DL-reference UL/DL configuration; and

when the Type 1 DL subframes are overlapped with the Type 2 DL subframes, the overlapping subframes between Type 1 and Type 2 DL subframes are further removed from the Type 2 DL subframes.

2. The device of claim 1 , wherein the processing circuitry further performs PUCCH resource mapping for PDSCH transmission indicated via Physical Downlink Control Channel (PDCCH) on a Type 1 DL subframe based on:

n PUCCH,j (1) =( M 1 −j− 1)· N c +j·N c+1 +n CCE,j +N PUCCH (1)

where N PUCCH (1) is a PUCCH resource offset associated with legacy PDCCH that is configured by higher layer for PUCCH resource mapping of Type 1 DL subframes, c is selected from {0, 1, 2, 3} such that N c ≦n CCE,j <N c+1 , N c =max{0,└[N RB DL ·(N sc RB ·c−4)]/36┘}, N RB DL refers to Downlink bandwidth configuration and N sc RB refers to resource block size in the frequency domain that is expressed as a number of subcarriers, is a number of the first control channel element (CCE) used for transmission of the corresponding PDCCH in Type 1 DL subframe j, and j(0≦j<M 1 ) is the index of the Type 1 DL subframe, and M 1 is a number of Type 1 DL subframes.

3. The device of claim 2 , wherein the processing circuitry further performs PUCCH resource mapping for PDSCH transmission indicated via PDCCH on the Type 1 DL subframe based on:

n PUCCH,j (1) =( M 1 −j− 1)· N c +j·N c+1 +n CCE,j +N PUCCH (1) +Δ ARO

Where j(0≦j<M 1 ) is the index of the Type 1 DL subframe, and Δ ARO refers to HARQ-ACK resource offset value that is selected from predefined values based on 2-bits HARQ-ACK resource offset field in a downlink control information (DCI) format depending on the number of Type 1 DL subframes associated with the first UL subframe for HARQ-ACK transmission.

4. The device of claim 3 , wherein the processing circuitry further performs determining the HARQ-ACK offset Δ ARO for the Type 1 DL subframe based on 2-bits HARQ-ACK resource offset field in the DCI format of the corresponding PDCCH depending on the number of Type 1 DL subframes associated with the first UL subframe for HARQ-ACK transmission:

selecting a Δ ARO value out of {0,−1,−2, 2} when the number of Type 1 DL subframes is one; and

selecting a value out of {0, Δ 1 −1, Δ 2 −2, 2} when the number of Type 1 DL subframes is more than one, where Δ 1 or Δ 2 could be one of {0, −(M,−j−1)·N c −j·N c+1 , −M 1 ·(N c −N c−1 ), −j·(N c+1 −N c ),−(N c+1 −N c ), −M 1 ·N c }, and j(0≦j<M 1 ) is the index of the Type 1 DL subframe, and M 1 is the number of Type 1 DL subframes, and c is selected from {0, 1, 2, 3} such that N c ≦n CCE,j <N c+1 , N c =max{0,└[N RB DL ·(N sc RB ·c−4)]/36┘}.

5. The device of claim 1 , wherein the processing circuitry further performs PUCCH resource mapping for PDSCH transmission indicated via Physical Downlink Control Channel (PDCCH) on a Type 2 DL subframe based on higher-layer signaling or based on:

n

PUCCH

,

l

(

1

)

=

(

M

2

-

l

-

1

)

·

N

c

+

l

·

N

c

+

1

+

n

CCE

,

l

+

N

PUCCH

(

2

)

or

n

PUCCH

,

l

(

1

)

=

l

·

N

4

+

n

CCE

,

l

+

N

PUCCH

(

2

)

or

n

PUCCH

,

l

(

1

)

=

c

=

0

l

-

1

m

=

1

N

CFI

,

c

N

m

+

n

CCE

,

l

+

N

PUCCH

(

2

)

where N PUCCH (2) is PUCCH resource offset associated with PDSCH on Type 2 DL subframes for PUCCH resource mapping, and c is selected from {0, 1, 2, 3} such that N c ≦n CCE,l <N c+1 , N c =max{0,└[N RB DL ·(N sc RB ·c−4)]/36┘}, N RB DL refers to downlink bandwidth configuration and N sc RB refers to resource block size in the frequency domain that is expressed as a number of subcarriers. n CCE,l is a number of the first channel control element (CCE) used for transmission of the corresponding PDCCH in Type 2 DL subframe l, and l(0≦l<M 2 ) is the index of a Type 2 DL subframe and M 2 is a number of Type 2 DL subframes, and N CFI,c is detected Control Formal Indicator (CFI) value carried on Physical Control Format Indicator Channel (PCFICH) channel in Type 2 subframe c.

6. The device of claim 5 wherein the PUCCH resource offset N PUCCH (2) are configured by higher layer signal in the device specific manner or a Cell-specific manner, or determined based on:

N PUCCH (2) =M 1 ·N 4

where M 1 is a number of Type 1 DL subframes associated with the first UL subframe for HARQ-ACK transmission, and N 4 refers to PUCCH resources reserved for a Type 1 DL subframe and is calculated according to N c =max{0,└[N RB DL ·(N sc RB ·c−4)]/36┘}.

7. The device of claim 5 , wherein the processing circuitry further performs PUCCH resource mapping for PDSCH transmission on the Type 2 DL subframe via PDCCH based on:

n

PUCCH

,

l

(

1

)

=

(

M

2

-

l

-

1

)

·

N

c

+

l

·

N

c

+

1

+

n

CCE

,

l

+

N

PUCCH

(

2

)

+

Δ

ARO

or

n

PUCCH

,

l

(

1

)

=

l

·

N

4

+

n

CCE

,

l

+

N

PUCCH

(

2

)

+

Δ

ARO

or

n

PUCCH

,

l

(

1

)

=

c

=

0

l

-

1

m

=

1

N

CFI

,

c

N

m

+

n

CCE

,

l

+

N

PUCCH

(

2

)

+

Δ

ARO

where l(0≦l<M 2 ) is the index of the Type 2 DL subframe, and Δ ARO refers to HARQ-ACK resource offset value that is selected based on 2-bits HARQ-ACK resource offset field in a downlink control information (DCI) format depending on the number of Type 2 DL subframes associated with the first UL subframe for HARQ-ACK transmission.

8. The device of claim 7 , wherein the processing circuitry further performs determining the HARQ-ACK offset for the Type 2 DL subframe based on 2-bits HARQ-ACK resource offset field in the DCI format of the corresponding PDCCH depending on the number of Type 2 DL subframes associated with the first UL subframe for HARQ-ACK transmission:

selecting a Δ ARO value out of {0,−1,−2, 2} when the number of Type 2 DL subframes is one;

selecting a Δ ARO value out of {0, Δ 1 −1, Δ 2 −2, 2} when the number of Type 2 DL subframes is more than one, where Δ 1 or Δ 2 could be one value of {0, —(M 2 −l−1)·N c −l·N c+1 ,−M 2 ·(N c −N c−1 ),−l·(N c+1 −N c ),−(N c+1 −N c ),−M 2 ·N c ,

-

(

N

PUCCH

(

2

)

-

N

PUCCH

(

1

)

)

,

M

1

·

N

4

,

c

=

0

M

1

-

1

m

=

1

N

CFI

,

c

N

m

}

,

and l(0≦l<M 2 ) is the index of the Type 2 DL subframe, and M 1 is the number of Type 1 DL subframes associated with the same first UL subframe for HARQ-ACK transmission and M 2 is the number of Type 2 DL subframes, and N PUCCH (1) and N PUCCH (2) is PUCCH resource offset associated with PDSCH on Type 1 DL subframes and Type 2 DL subframes respectively for PUCCH resource mapping, and c is selected from {0, 1, 2, 3} such that is selected from {0, 1, 2, 3} such that N c ≦n CCE,l <N c+1 , N c =max{0,└[N RB DL ·(N sc RB ·c−4)]/36┘}, and N CFI,c is detected Control Formal Indicator (CFI) value carried on Physical Control Format Indicator Channel (PCFICH) channel in Type 2 subframe c.

9. The device of claim 1 , wherein the processing circuitry further performs PUCCH resource mapping for PDSCH transmission indicated via enhanced physical downlink control channel (EPDCCH) indicating downlink semi persistent scheduling (SPS) release in a Type 1 or Type 2 sub-frame, the device shall use:

n

PUCCH

,

i

(

1

)

=

n

ECCE

,

q

+

i

1

=

0

i

-

1

N

ECCE

,

q

,

n

-

k

i

1

+

Δ

ARO

+

N

PUCCH

,

q

(

e

1

)

when EPDCCH-physical resource block(PRB)-set q is configured for distributed transmission, or

n

PUCCH

,

i

(

1

)

=

n

ECCE

,

q

N

RB

ECCE

,

q

·

N

RB

ECCE

,

q

+

i

1

=

0

i

-

1

N

ECCE

,

q

,

n

-

k

i

1

+

n

+

Δ

ARO

+

N

PUCCH

,

q

(

e

1

)

when EPDCCH-PRB-set q is configured for localised transmission where n ECCE,q is the number of the first ECCE used for transmission of a corresponding downlink control information (DCI) assignment in EPDCCH-PRB-set q in subframe n−k i , N PUCCH,q (e1) for EPDCCH-PRB-set q is configured by the higher layer parameter pucch-ResourceStartOffset-r11, N RB ECCE,q for EPDCCH-PRB-set q in subframe n+k i is given, and n′ is determined from the antenna port used for EPDCCH transmission in subframe n−k i , and Δ ARO is the HARQ-ACK resource offset.

10. The device of claim 9 , wherein the processing circuitry further performs PUCCH resource mapping for PDSCH transmission indicated via EPDCCH indicating downlink SPS release in the Type 1 or Type 2 sub-frame, the device shall use:

n

PUCCH

,

i

(

1

)

=

n

ECCE

,

q

L

i

+

i

1

=

0

i

-

1

(

N

ECCE

,

q

,

n

-

k

i

1

L

i

1

)

+

Δ

ARO

+

N

PUCCH

,

q

(

e

1

)

or

n

PUCCH

,

i

(

1

)

=

n

ECCE

,

q

L

i

·

N

RB

ECCE

,

q

·

N

RB

ECCE

,

q

+

i

1

=

0

i

-

1

(

N

ECCE

,

q

,

n

-

k

i

1

L

i

1

)

+

n

+

Δ

ARO

+

N

PUCCH

,

q

(

e

1

)

where L i denotes the minimum supportable aggregation level in subframe i.

11. A method comprising:

receiving from a base station via a transceiver, a physical downlink shared channel (PDSCH) transmission;

classifying, via processing circuitry, downlink (DL) subframe types for a set of DL subframes associated with a first uplink (UL) subframe for transmission of a hybrid automatic report request acknowledgment (HARQ-ACK), wherein the DL subframe types comprise Type 1 subframes that are constructed by DL subframes that are associated with the first UL subframe for transmission of HARQ-ACK according to a time division duplex (TDD) UL/DL configuration indicated in a system information block Type 1(SIB1) message and wherein the DL subframe types further comprise Type 2 DL subframes that are constructed by identifying DL subframes that are associated with the first UL subframe for transmission of HARQ-ACK according to a higher layer configured DL-reference UL/DL configuration; and

performing physical uplink control channel (PUCCH) resources mapping based on the classified DL subframe Types for an acknowledgement transmission associated with PDSCH transmission reception;

wherein the Type 2 DL subframes are further constructed by:

determining that the Type 1 DL subframes are overlapped with the Type 2 DL subframes, and removing the overlapping subframes between Type 1 and Type 2 DL subframes from the Type 2 DL subframes.

12. The method of claim 11 , further comprising performing PUCCH resource mapping for PDSCH transmission indicated via Physical Downlink Control Channel (PDCCH) on a Type 1 DL subframe based on:

n PUCCH,j (1) =( M 1 −j− 1)· N c +j·N c+1 +n CCE,j +N PUCCH (1)

where N PUCCH (1) is a PUCCH resource offset associated with legacy PDCCH that is configured by higher layer for PUCCH resource mapping of Type 1 DL subframes, c is selected from {0, 1, 2, 3} such that N c ≦n CCE,j <N c+1 , N c =max{0,└[N RB DL ·(N sc RB ·c−4)]/36┘}, N RB CL refers to downlink bandwidth configuration and N sc RB refers to resource block size in the frequency domain that is expressed as a number of subcarriers, n CCE,j is a number of the first control channel element (CCE) used for transmission of the corresponding PDCCH in Type 1 DL subframe j, and j(0≦j<M 1 ) is the index of the Type 1 DL subframe, and M 1 is a number of Type 1 DL subframes.

13. The method of claim 12 , further comprising performing PUCCH resource mapping for PDSCH transmission indicated via PDCCH on the Type 1 DL subframe based on:

n PUCCH,j (1) =( M 1 −j− 1)· N c +j·N c+1 +n CCE,j +N PUCCH (1) +Δ ARO

where j(0≦j<M I ) is the index of the Type 1 DL subframe, and Δ ARO refers to HARQ-ACK resource offset value that is selected from predefined values based on 2-bits HARQ-ACK resource offset field in a downlink control information (DCI) format depending on a number of Type 1 DL subframes associated with the first UL subframe for HARQ-ACK transmission.

14. The method of claim 13 , further comprising determining the HARQ-ACK offset Δ ARO for the Type 1 DL subframe based on 2-bits HARQ-ACK resource offset field in the DCI format of the corresponding PDCCH depending on the number of Type 1 DL subframes associated with the first UL subframe for HARQ-ACK transmission:

selecting a Δ ARO value out of {0,−1,−2, 2} when the number of Type 1 DL subframes is one; and

selecting a value out of {0, Δ 1 −1, Δ 2 −2, 2} when the number of Type 1 DL subframes is more than one, where Δ 1 or Δ 2 could be one of {0, −(M 1 −j−1)·N c −j·N c+1 , −M 1 ·(N c −N c−1 ), −j·(N c+1 −N c ),−(N c+1 −N c ), −M 1 ·N c }, and j(0≦j<M 1 ) is the index of the Type 1 DL subframe, and M 1 is the number of Type 1 DL subframes, and c is selected from {0, 1, 2, 3} such that <N c ≦n CCE,j <N c+1 ,N c =max{0,└[N RB DL ·(N sc RB ·c−4)]/36┘}.

15. The method of claim 11 , further comprising performing PUCCH resource mapping for PDSCH transmission indicated via Physical Downlink Control Channel (PDCCH) on a Type 2 DL subframe based on higher-layer signaling or based on:

n

PUCCH

,

l

(

1

)

=

(

M

2

-

l

-

1

)

·

N

c

+

l

·

N

c

+

1

+

n

CCE

,

l

+

N

PUCCH

(

2

)

or

n

PUCCH

,

l

(

1

)

=

l

·

N

4

+

n

CCE

,

l

+

N

PUCCH

(

2

)

or

n

PUCCH

,

l

(

1

)

=

c

=

0

l

-

1

m

=

1

N

CFI

,

c

N

m

+

n

CCE

,

l

+

N

PUCCH

(

2

)

where N PUCCH (2) is PUCCH resource offset associated with PDSCH on Type 2 DL subframes for PUCCH resource mapping, and c is selected from {0, 1, 2, 3} such that N c ≦n CCE,l <N c+1 , N c =max{0,└[, N RB DL ·(N sc RD ·c−4)]/36┘}, N RB DL refers to downlink bandwidth configuration and N sc RB refers to resource block size in the frequency domain that is expressed as a number of subcarriers. n CCE,l is a number of the first channel control element (CCE) used for transmission of the corresponding PDCCH in Type 2 DL subframe l, and 1(0≦l<M 2 ) is the index of a Type 2 DL subframe and M 2 is a number of Type 2 DL subframes, and N CFI,c is detected Control Formal Indicator (CFI) value carried on Physical Control Format Indicator Channel (PCFICH) channel in Type 2 subframe c.

16. The method of claim 15 wherein the PUCCH resource offset N PUCCH (2) are configured by higher layer signal in a user equipment specific manner or a Cell-specific manner, or determined based on:

N PUCCH (2) =M 1 ·N 4

where M 1 is a number of Type 1 DL subframes associated with the first UL subframe for HARQ-ACK transmission, and N 4 refers to PUCCH resources reserved for a Type 1 DL subframe and is calculated according to N c =max{0,└[N RB DL ·(N sc RB ·c−4)]/36┘}.

17. The method of claim 15 , further comprising performing PUCCH resource mapping for PDSCH transmission on the Type 2 DL subframe via PDCCH based on:

n

PUCCH

,

l

(

1

)

=

(

M

2

-

l

-

1

)

·

N

c

+

l

·

N

c

+

1

+

n

CCE

,

l

+

N

PUCCH

(

2

)

+

Δ

ARO

or

n

PUCCH

,

l

(

1

)

=

l

·

N

4

+

n

CCE

,

l

+

N

PUCCH

(

2

)

+

Δ

ARO

or

n

PUCCH

,

l

(

1

)

=

c

=

0

l

-

1

m

=

1

N

CFI

,

c

N

m

+

n

CCE

,

l

+

N

PUCCH

(

2

)

+

Δ

ARO

where l(0≦l<M 2 ) is the index of the Type 2 DL subframe, and Δ ARO refers to HARQ-ACK resource offset value that is selected based on 2-bits HARQ-ACK resource offset field in a downlink control information (DCI) format depending on the number of Type 2 DL subframes associated with the first UL subframe for HARQ-ACK transmission.

18. The method of claim 17 , further comprising determining the HARQ-ACK offset for the Type 2 DL subframe based on 2-bits HARQ-ACK resource offset field in the DCI format of the corresponding PDCCH depending on the number of Type 2 DL subframes associated with the first UL subframe for HARQ-ACK transmission:

selecting a Δ ARO value out of {0,−1,−2, 2} when the number of Type 2 DL subframes is one;

selecting a Δ ARO value out of {0, Δ 1 −1, Δ 2 −2, 2} when the number of Type 2 DL subframes is more than one, where Δ 1 or Δ 2 could be one value of

-

(

N

PUCCH

(

2

)

-

N

PUCCH

(

1

)

)

,

M

1

·

N

4

,

c

=

0

M

1

-

1

m

=

1

N

CFI

,

c

N

m

}

,

and l(0≦l<M 2 ) is the index of the Type 2 DL subframe, and M 1 is the number of Type 1 DL subframes associated with the same first UL subframe for HARQ-ACK transmission and M 2 is the number of Type 2 DL subframes, and N PUCCH (1) and N PUCCH (2) is PUCCH resource offset associated with PDSCH on Type 1 DL subframes and Type 2 DL subframes respectively for PUCCH resource mapping, and c is selected from {0, 1, 2, 3} such that is selected from {0, 1, 2, 3} such that N c ≦n CCE,l <N c+1 , N c =max{0,└[N RB DL ·(N sc RB ·c−4)]/36┘}, and N CFI,c is detected Control Formal Indicator (CFI) value carried on Physical Control Format Indicator Channel (PCFICH) channel in Type 2 subframe c.

19. The method of claim 11 , further comprising performing PUCCH resource mapping for PDSCH transmission indicated via enhanced physical downlink control channel (EPDCCH) indicating downlink semi persistent scheduling (SPS) release in a Type 1 or Type 2 sub-frame, a user equipment (UE) shall use:

n

PUCCH

,

i

(

1

)

=

n

ECCE

,

q

+

i

1

=

0

i

-

1

N

ECCE

,

q

,

n

-

k

i

1

+

Δ

ARO

+

N

PUCCH

,

q

(

e

1

)

when EPDCCH-physical resource block(PRB)-set q is configured for distributed transmission, or

n

PUCCH

,

i

(

1

)

=

n

ECCE

,

q

N

RB

ECCE

,

q

·

N

RB

ECCE

,

q

+

i

1

=

0

i

-

1

N

ECCE

,

q

,

n

-

k

i

1

+

n

+

Δ

ARO

+

N

PUCCH

,

q

(

e

1

)

when EPDCCH-PRB-set q is configured for localised transmission where n ECCE,q is the number of the first ECCE used for transmission of a corresponding downlink control information (DCI) assignment in EPDCCH-PRB-set q in subframe n−k i , N PUCCH,q (e1) for EPDCCH-PRB-set q is configured by the higher layer parameter pucch-ResourceStartOffset-r11, N RB ECCE,q for EPDCCH-PRB-set q in subframe n−k i is given, and n′ is determined from the antenna port used for EPDCCH transmission in subframe n−k i , and Δ ARO is the HARQ-ACK resource offset.

20. The method of claim 19 , further comprising performing PUCCH resource mapping for PDSCH transmission indicated via EPDCCH or EPDCCH indicating downlink SPS release in the Type 1 or Type 2 sub-frame, the user equipment (UE) shall use:

n

PUCCH

,

i

(

1

)

=

n

ECCE

,

q

L

i

+

i

1

=

0

i

-

1

(

N

ECCE

,

q

,

n

-

k

i

1

L

i

1

)

+

Δ

ARO

+

N

PUCCH

,

q

(

e

1

)

or

n

PUCCH

,

i

(

1

)

=

n

ECCE

,

q

L

i

·

N

RB

ECCE

,

q

·

N

RB

ECCE

,

q

+

i

1

=

0

i

-

1

(

N

ECCE

,

q

,

n

-

k

i

1

L

i

1

)

+

n

+

Δ

ARO

+

N

PUCCH

,

q

(

e

1

)

where L i denotes the minimum supportable aggregation level in subframe i.

21. A non-transitory machine readable storage device having instructions to cause a machine to:

receive from a base station via a transceiver, a physical downlink shared channel (PDSCH) transmission;

classify, via processing circuitry, downlink (DL) subframe types for a set of DL subframes associated with a first uplink (UL) subframe for transmission of a hybrid automatic report request acknowledgment (HARQ-ACK); and

perform physical uplink control channel (PUCCH) resources mapping based on the classified DL subframe Types for an acknowledgement transmission associated with PDSCH transmission reception;

wherein the DL subframe types comprise:

Type 1 DL subframes that are constructed by DL subframes that are associated with the first uplink (UL) subframe for transmission of HARQ-ACK according to a time division duplex (TDD) UL/DL configuration indicated in a system information block Type 1(SIB1) message; and

Type 2 DL subframes that are constructed by:

firstly identifying DL subframes that are associated with the first UL subframe for transmission of HARQ-ACK according to a higher layer configured DL-reference UL/DL configuration; and

when the Type 1 DL subframes are overlapped with the Type 2 DL subframes, the overlapping subframes between Type 1 and Type 2 DL subframes are further removed from the Type 2 DL subframes.

22. The machine readable storage device of claim 21 further having instructions to cause a machine to:

perform PUCCH resource mapping for PDSCH transmission indicated via enhanced physical downlink control channel (EPDCCH) indicating downlink semi persistent scheduling (SPS) release in a Type 1 DL subframe or a Type 2 DL sub-frame, the machine shall use:

n

PUCCH

,

i

(

1

)

=

n

ECCE

,

q

+

i

1

=

0

i

-

1

N

ECCE

,

q

,

n

-

k

i

1

+

Δ

ARO

+

N

PUCCH

,

q

(

e

1

)

when EPDCCH-physical resource block(PRB)-set q is configured for distributed transmission, or

n

PUCCH

,

i

(

1

)

=

n

ECCE

,

q

N

RB

ECCE

,

q

·

N

RB

ECCE

,

q

+

i

1

=

0

i

-

1

N

ECCE

,

q

,

n

-

k

i

1

+

n

+

Δ

ARO

+

N

PUCCH

,

q

(

e

1

)

when EPDCCH-PRB-set q is configured for localised transmission where n ECCE,q is the number of the first ECCE used for transmission of a corresponding downlink control information (DCI) assignment in EPDCCH-PRB-set q in subframe n−k i , N PUCCH,q (e1) for EPDCCH-PRB-set q is configured by the higher layer parameter pucch-ResourceStartOffset-r11, N RB ECCE,q for EPDCCH-PRB-set q in subframe n−k i is given, and n′ is determined from the antenna port used for EPDCCH transmission in subframe n−k i , and Δ ARO is the HARQ-ACK resource offset; and

perform PUCCH resource mapping for PDSCH transmission indicated via EPDCCH or EPDCCH indicating downlink SPS release in the Type 1 or Type 2 sub-frame, the machine shall use:

n

PUCCH

,

i

(

1

)

=

n

ECCE

,

q

L

i

+

i

1

=

0

i

-

1

(

N

ECCE

,

q

,

n

-

k

i

1

L

i

1

)

+

Δ

ARO

+

N

PUCCH

,

q

(

e

1

)

or

n

PUCCH

,

i

(

1

)

=

n

ECCE

,

q

L

i

·

N

RB

ECCE

,

q

·

N

RB

ECCE

,

q

+

i

1

=

0

i

-

1

(

N

ECCE

,

q

,

n

-

k

i

1

L

i

1

)

+

n

+

Δ

ARO

+

N

PUCCH

,

q

(

e

1

)

where L i denotes the minimum supportable aggregation level in subframe i.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 26, 2020
From: INTEL CORPORATION
To: APPLE INC.
Reel/Frame 053062/0703 →
CONFIRMATORY ASSIGNMENT Recorded Jun 25, 2020
From: INTEL IP CORPORATION
To: INTEL CORPORATION
Reel/Frame 053066/0388 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 13, 2014
From: HE, HONG; HAN, SEUNGHEE; FWU, JONG-KAE; KHORYAEV, ALEXEY VLADIMIROVICH
To: INTEL IP CORPORATION
Reel/Frame 032427/0057 →