IP Library Granted Patent US 9,376,885
Granted Patent B2
US 9,376,885 · App. 14/142,289 · Granted Jun 28, 2016

Enhanced geothermal systems and reservoir optimization

Inventors: Daniel Bour (Granite Falls, WA); Susan Petty (Shoreline, WA)
Assignee: AltaRock Energy, Inc.
E21B33/124E21B43/26F24J3/085Y02E10/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,376,885
App. No.
14/142,289
Granted
Jun 28, 2016
Kind
B2
Abstract

Systems and methods can include maximizing energy recovery from a subterranean formation. According to one embodiment, a selected subterranean open-hole interval is isolated and at least one fracture is stimulated in the isolated subterranean open-hole interval.

Claims (18)

1. A method for recovering thermal energy from a subterranean formation comprising:

pressurizing at least one unstimulated fracture within an unisolated subterranean open-hole interval to create a first stimulated fracture;

isolating a selected subterranean open-hole interval by blocking the first stimulated fracture with a temporary fracture sealant, wherein the temporary fracture sealant thermally degrades at geostatic temperatures; and

pressurizing at least one unstimulated fracture within the isolated subterranean open-hole interval to create a second stimulated fracture, wherein a water is circulated within the second stimulated fracture to be heated and produced from the well for generating electricity.

2. The method as recited in claim 1 , wherein isolating the selected subterranean open-hole interval comprises positioning an isolation tool adjacent to the selected subterranean open-hole interval.

3. The method as recited in claim 2 , wherein pressurizing the at least one unstimulated fracture within the isolated subterranean open-hole interval comprises injecting a treatment fluid down a tubing string.

4. The method as recited in claim 3 , further comprising pressurizing the at least one unstimulated fracture in the unisolated subterranean open-hole interval by injecting the treatment fluid down an annulus between the tubing string and the unisolated subterranean open-hole interval.

5. The method as recited in claim 4 , wherein the isolation tool is a high temperature inflatable open-hole packer.

6. The method as recited in claim 4 , wherein the isolation tool is a high temperature expandable open-hole packer comprising an expandable element and a sealing element.

7. The method as recited in claim 1 , wherein isolating the selected subterranean open-hole interval comprises positioning a scab liner proximate the selected subterranean open-hole interval.

8. The method as recited in claim 7 , wherein pressurizing the at least one unstimulated fracture within the isolated subterranean open-hole interval comprises injecting a treatment fluid down a tubing string.

9. The method as recited in claim 8 , further comprising pressurizing the at least one unstimulated fracture in the unisolated subterranean open-hole interval by injecting the treatment fluid down an annulus between the tubing string and the unisolated subterranean open-hole interval.

10. The method as recited in claim 1 , wherein pressurizing the at least one unstimulated fracture in the isolated subterranean open-hole interval comprises projecting treatment fluid from a high pressure jet nozzle against the isolated subterranean open-hole interval.

11. The method as recited in claim 10 , wherein the treatment fluid comprises a granular material.

12. The method as recited in claim 1 , wherein isolating the selected subterranean open-hole interval comprises at least partially filling at least one fracture in the unisolated subterranean open-hole interval with a high viscosity fluid.

13. The method as recited in claim 1 , further comprising detecting a stimulation of fractures real-time with a micro-seismic monitoring system.

14. The method as recited in claim 1 , further comprising detecting a downhole parameter realtime.

15. The method as recited in claim 14 , wherein the downhole parameter is at least one of pressure of the selected open-hole interval, temperature of the selected open-hole interval, the flow rate of the treatment fluid in the selected open-hole interval, the flow pattern of treatment fluid in the selected open-hole interval, the flow rate of the treatment fluid in a fracture in the selected open-hole interval and the flow pattern of the treatment fluid in a fracture in the selected open-hole interval.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 21, 2025
From: ALTAROCK ENERGY, INC.
To: MAZAMA ENERGY, INC.
Reel/Frame 071768/0021 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 13, 2025
From: ALTAROCK ENERGY, INC.
To: MAZAMA ENERGY, INC.
Reel/Frame 071413/0918 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 25, 2014
From: BOUR, DANIEL L.; PETTY, SUSAN
To: ALTAROCK ENERGY, INC.
Reel/Frame 032522/0825 →
Continuity (9)
Continuation 13603410 · Sep 4, 2012
Continuation 12499012 · Jul 7, 2009
Provisional Application 61078682 · Jul 7, 2008
Provisional Application 61078686 · Jul 7, 2008
Provisional Application 61087332 · Aug 8, 2008
Provisional Application 61087342 · Aug 8, 2008
Provisional Application 61102644 · Oct 3, 2008
Provisional Application 61154077 · Feb 20, 2009
Related Publication 20140110107A1 · Apr 24, 2014