IP Library Granted Patent US 9,230,422
Granted Patent B2
US 9,230,422 · App. 14/143,651 · Granted Jan 5, 2016

Generating sum alarms in process control

Inventor: Wolfgang Wimmer (Rietheim, CH)
Assignee: ABB TECHNOLOGY AG
G08B21/182G05B23/0208G05B23/0272
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,230,422
App. No.
14/143,651
Granted
Jan 5, 2016
Kind
B2
Abstract

A method and sum alarm server are disclosed, which generate a sum alarm for alarms of a process control system for an industrial plant. The method includes identifying alarms described by a configuration description for the industrial plant; assigning each identified alarm to a plant level; assigning each identified alarm to an alarm category based on an alarm type retrieved from the configuration description; and deriving a sum alarm per alarm category and at a selected plant level from all alarms assigned to the alarm category and assigned to the selected plant level or to any plant level below.

Claims (39)

1. A method of generating a sum alarm for alarms of a process control system for an industrial plant, the method comprising:

identifying alarms described by a configuration description for the industrial plant;

assigning each identified alarm to a plant level;

assigning each identified alarm to an alarm category based on an alarm type retrieved from the configuration description; and

deriving a sum alarm per alarm category and at a selected plant level from all alarms assigned to the alarm category and assigned to the selected plant level or to any plant level below.

2. The method according to claim 1 , wherein the alarm category assigned is one of a protection, control, primary equipment, secondary equipment, or security category.

3. The method according to claim 1 , comprising:

defining a sum alarm acknowledgement for acknowledging all alarms contributing to a sum alarm.

4. The method according to claim 1 , wherein the industrial plant is a substation of an electrical power transmission system described by a standardized configuration description according to IEC 61850.

5. The method according to claim 4 , wherein the plant level assigned is a substation hierarchy level is one of a Substation, Voltage, Bay, Primary Equipment, Sub-equipment level.

6. The method according to claim 5 , wherein the alarm is represented by a Data Object (DO) of a Logical Node (LN) according to IEC 61850, comprising:

assigning the alarm to the substation hierarchy level of the LN; and

assigning the alarm to an alarm category based on a name of the DO.

7. The method according to claim 5 , wherein the alarm is an alarm related to an Intelligent Electronic Device (IED) hosting a plurality of implemented LNs, the method comprising:

assigning the IED related alarm to a highest substation hierarchy level to which any one of the implemented LNs is assigned.

8. The method according to claim 5 , comprising:

instantiating a sum alarm LN for each category and substation hierarchy level.

9. A sum alarm server of a Process Control (PC) system, wherein the sum alarm server is configured to:

identify alarms described by a configuration description for an industrial plant;

assign each identified alarm to a plant level;

assign each identified alarm to an alarm category based on an alarm type retrieved from the configuration description; and

derive a sum alarm per alarm category and at a selected plant level from all alarms assigned to the alarm category and assigned to the selected plant level or to any plant level below.

10. The sum alarm server according to claim 9 , wherein the alarm category assigned is one of a protection, control, primary equipment, secondary equipment, or security category.

11. The sum alarm server according to claim 9 , comprising:

defining a sum alarm acknowledgement for acknowledging all alarms contributing to a sum alarm.

12. The sum alarm server according to claim 9 , wherein the industrial plant is a substation of an electrical power transmission system described by a standardized configuration description according to IEC 61850.

13. The sum alarm server according to claim 12 , wherein the plant level assigned is a substation hierarchy level is one of a Substation, Voltage, Bay, Primary Equipment, Sub-equipment level.

14. The sum alarm server according to claim 13 , wherein the alarm is represented by a Data Object (DO) of a Logical Node (LN) according to IEC 61850, comprising:

assigning the alarm to the substation hierarchy level of the LN; and

assigning the alarm to an alarm category based on a name of the DO.

15. The sum alarm server according to claim 14 , wherein the alarm is an alarm related to an Intelligent Electronic Device (IED) hosting a plurality of implemented LNs, further comprising:

assigning the IED related alarm to a highest substation hierarchy level to which any one of the implemented LNs is assigned.

16. The sum alarm server according to claim 14 , comprising:

instantiating a sum alarm LN for each category and substation hierarchy level.

17. The sum alarm server according to claim 9 , comprising:

a Human Machine Interface (HMI), wherein the HMI is configured for optical access by an operator.

18. The sum alarm server according to claim 9 , wherein the sum alarm server is configured for online access by a sum alarm client device.

19. The sum alarm server according to claim 9 , wherein the sum alarm server is configured to be connected to a communication network of a Substation Automation (SA) system.

20. The sum alarm server according to claim 9 , wherein the sum alarm server is configured to host a sum alarm Logical Node (LN) according to IEC 61850 for the generated sum alarm.

Assignments (6)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065549/0576 →
CORRECTIVE ASSIGNMENT TO CORRECT THE CONVEYIGN PARTY "ABB TECHNOLOGY LTD."SHOULD READ"ABB TECHNOLOGY AG" PREVIOUSLY RECORDED AT REEL: 040622 FRAME: 0128. ASSIGNOR(S) HEREBY CONFIRMS THE MERGER. Recorded May 11, 2022
From: ABB TECHNOLOGY AG
To: ABB SCHWEIZ AG
Reel/Frame 059928/0001 →
CHANGE OF NAME Recorded Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058666/0540 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 15, 2021
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 055589/0769 →
MERGER Recorded Nov 15, 2016
From: ABB TECHNOLOGY LTD.
To: ABB SCHWEIZ AG
Reel/Frame 040622/0128 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 14, 2014
From: WIMMER, WOLFGANG
To: ABB TECHNOLOGY AG
Reel/Frame 032440/0007 →
Priority Claims (1)
EP 11172189 · Jun 30, 2011 · regional
Continuity (2)
Continuation PCTEP2012062812 · Jul 2, 2012
Related Publication 20140184405A1 · Jul 3, 2014