IP Library Granted Patent US 9,829,233
Granted Patent B2
US 9,829,233 · App. 14/169,183 · Granted Nov 28, 2017

Scroll compressor differential pressure control during compressor startup transitions

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,829,233
App. No.
14/169,183
Granted
Nov 28, 2017
Kind
B2
Abstract

A method including: determining a cooling value; and comparing the cooling value to an activation point of a lead compressor. The lead compressor is in a tandem set of scroll compressors of a cooling system. The tandem set of compressors comprises a lag compressor. The method further includes: activating the lead compressor when the cooling value is greater than the activation point; activating the lag compressor subsequent to activating the lead compressor; and determining whether conditions exist including: an alarm associated with the lag compressor being generated, and the lead compressor being deactivated. The method further includes deactivating the lag compressor when at least one of the conditions exists in the cooling system.

Claims (57)

1. A method comprising:

determining a cooling value;

comparing the cooling value to an activation point of a lead compressor, wherein the lead compressor is in a tandem set of scroll compressors of a cooling system, and wherein the tandem set of compressors comprises a lag compressor;

activating the lead compressor when the cooling value is greater than the activation point;

activating the lag compressor subsequent to activating the lead compressor;

determining whether a plurality of conditions exist including whether a first condition and a second condition exists, wherein

(i) the first condition is that an alarm associated with the lag compressor is generated, and

(ii) the second condition is that the lead compressor is deactivated; and

deactivating the lag compressor when at least the second condition exists in the cooling system.

2. The method of claim 1 , further comprising turning off the lead compressor when the alarm associated with the lag compressor is generated.

3. The method of claim 1 , further comprising:

while the lag compressor is in an ON state, determining whether a compressor minimum ON time for the lag compressor has expired;

rechecking the plurality of conditions when the compressor minimum ON time has not expired; and

maintaining operation of the lead compressor and the lag compressor when the minimum ON time has expired.

4. The method of claim 3 , further comprising determining a temperature error value based on an ambient temperature and a predetermined set point value,

wherein the cooling value is determined based on the temperature error and a number of activated compressors in the cooling system.

5. The method of claim 3 , further comprising:

starting a delay timer and generating a timer signal when the lead compressor is activated; and

maintaining operation of the lead compressor and the lag compressor in response to the timer signal being greater than a predetermined value.

6. The method of claim 3 , further comprising determining an outdoor ambient temperature,

wherein the lag compressor is activated when the outdoor ambient temperature is less than a predetermined ambient temperature.

7. The method of claim 3 , further comprising determining a suction pressure of at least one of the lead compressor and the lag compressor,

wherein the lag compressor is activated when the suction pressure is less than a predetermined suction pressure.

8. The method of claim 3 , further comprising:

starting a lag timer and generating a timer signal when the lag compressor is activated; and

maintaining operation of the lead compressor and the lag compressor in response to the timer signal being greater than the compressor minimum ON time.

9. The method of claim 3 , wherein:

the lead compressor is a digital variable capacity compressor; and

the lag compressor is a fixed capacity compressor.

10. The method of claim 1 , wherein when the cooling value is less than or equal to a lag compressor activation point and an ambient temperature is less than a predetermined temperature, the lag compressor is activated subsequent to activating the lead compressor.

11. The method of claim 10 , wherein:

the ambient temperature is determined if the cooling value is less than or equal to an activation point of the lag compressor; and

the predetermined temperature is associated with activating the lag compressor.

12. The method of claim 1 , wherein when the cooling value is less than or equal to a lag compressor activation point and a suction pressure of the lag compressor is less than a predetermined pressure, the lag compressor is activated subsequent to activating the lead compressor.

13. The method of claim 12 , wherein the suction pressure is determined if the cooling value is less than or equal to an activation point of the lag compressor.

14. The method of claim 1 , further comprising:

starting a delay timer subsequent to activating the lead compressor;

starting a lag timer subsequent to activating the lag compressor;

maintaining the lag compressor in an activated state while the first condition and the second condition do not exist and the lag timer has not expired; and

determining whether the delay timer has expired if the first condition and the second condition do not exist and the lag timer has expired.

15. The method of claim 1 , wherein both the lead compressor and the lag compressor are activated when cooling for a current operating condition is satisfiable by a cooling capacity of one of the lead compressor and the lag compressor.

16. The method of claim 8 , wherein the lag compressor is loaded when activated.

17. The method of claim 8 , wherein, while maintaining operation of the lead compressor and the lag compressor and prior to the timer signal being greater than the compressor minimum ON time, the lag compressor is loaded.

18. The method of claim 8 , wherein at least one of the lead compressor or the lag compressor is deactivated prior to the timer signal being greater than the compressor minimum ON time.

19. A method comprising:

determining a cooling value;

comparing the cooling value to an activation point of a lead compressor, wherein the lead compressor is in a tandem set of scroll compressors of a cooling system, and wherein the tandem set of compressors comprises a lag compressor;

activating the lead compressor when the cooling value is greater than the activation point;

activating the lag compressor subsequent to activating the lead compressor based on whether a pressure difference across at least one of the lead compressor or the lag compressor is less than a predetermined pressure difference;

determining whether a plurality of conditions exist including

(i) an alarm associated with the lag compressor is generated, and

(ii) the lead compressor is deactivated; and

deactivating the lag compressor when at least one of the plurality of conditions exists in the cooling system.

20. The method of claim 19 , further comprising:

detecting a suction pressure of a fluid received by the at least one of the lead compressor and the lag compressor;

detecting a head pressure of a fluid output from the at least one of the lead compressor and the lag compressor; and

determining the pressure difference across the at least one of the lead compressor and the lag compressor based on the suction pressure and the head pressure.

Assignments (9)
SECURITY INTEREST Recorded Oct 26, 2021
From: VERTIV CORPORATION; VERTIV IT SYSTEMS, INC.; ELECTRICAL RELIABILITY SERVICES, INC.; ENERGY LABS, INC.
To: UMB BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 057923/0782 →
SECURITY AGREEMENT Recorded Mar 3, 2020
From: ELECTRICAL RELIABILITY SERVICES, INC.; ENERGY LABS, INC.; VERTIV CORPORATION; VERTIV IT SYSTEMS, INC.
To: CITIBANK, N.A.
Reel/Frame 052076/0874 →
RELEASE OF SECURITY INTEREST Recorded Mar 2, 2020
From: JPMORGAN CHASE BANK, N.A.
To: VERTIV CORPORATION (F/K/A ALBER CORP.); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT CORPORATION); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT FREMONT, LLC); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT HUNTSVILLE, LLC); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT REDMOND CORP.); ELECTRICAL RELIABILITY SERVICES, INC.; VERTIV CORPORATION (F/K/A EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.); VERTIV CORPORATION (F/K/A LIEBERT CORPORATION)
Reel/Frame 052065/0666 →
RELEASE OF SECURITY INTEREST Recorded Mar 2, 2020
From: THE BANK OF NEW YORK MELLON TRUST COMPANY N.A.
To: VERTIV CORPORATION; VERTIV IT SYSTEMS, INC.; ELECTRICAL RELIABILITY SERVICES, INC.
Reel/Frame 052071/0913 →
SECOND LIEN SECURITY AGREEMENT Recorded Jun 10, 2019
From: VERTIV IT SYSTEMS, INC.; VERTIV CORPORATION; VERTIV NORTH AMERICA, INC.; ELECTRICAL RELIABILITY SERVICES, INC.; VERTIV ENERGY SYSTEMS, INC.
To: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A.
Reel/Frame 049415/0262 →
CHANGE OF NAME Recorded Sep 5, 2018
From: LIEBERT CORPORATION
To: VERTIV CORPORATION
Reel/Frame 047013/0116 →
SECURITY AGREEMENT Recorded Dec 2, 2016
From: ALBER CORP.; ASCO POWER TECHNOLOGIES, L.P.; AVOCENT CORPORATION; AVOCENT FREMONT, LLC; AVOCENT HUNTSVILLE, LLC; AVOCENT REDMOND CORP.; ELECTRICAL RELIABILITY SERVICES, INC.; EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.; LIEBERT CORPORATION; LIEBERT NORTH AMERICA, INC.; NORTHERN TECHNOLOGIES, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 040797/0615 →
SECURITY AGREEMENT Recorded Dec 1, 2016
From: ALBER CORP.; ASCO POWER TECHNOLOGIES, L.P.; AVOCENT CORPORATION; AVOCENT FREMONT, LLC; AVOCENT HUNTSVILLE, LLC; AVOCENT REDMOND CORP.; ELECTRICAL RELIABILITY SERVICES, INC.; EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.; LIEBERT CORPORATION; LIEBERT NORTH AMERICA, INC.; NORTHERN TECHNOLOGIES, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 040783/0148 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 27, 2014
From: NOLL, ROGER; MONNIER, LOU; LIN, ZHIYONG; SCHUTTE, DANIEL J.; DOLCICH, BENEDICT J.
To: LIEBERT CORPORATION
Reel/Frame 032312/0684 →