IP Library Granted Patent US 9,175,491
Granted Patent B2
US 9,175,491 · App. 14/191,836 · Granted Nov 3, 2015

Wind power installation and a tower or tower segment and a door frame for it

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,175,491
App. No.
14/191,836
Granted
Nov 3, 2015
Kind
B2
Abstract

A tower or a tower segment of a wind turbine, having a door for entering the inside of the tower, comprising a door frame, which has a door opening that is preferably closed by a door leaf, and a door frame for a door of a tower of a wind turbine, the frame having a door opening that is preferably closed by a door leaf, and a wind turbine having a tower, a door provided for entering the inside of the tower, and a staircase leading to the door on the outside of the tower, and an air passage opening in at least one advantageous location. The door frame has at least one air passage opening, particularly an air inlet opening.

Claims (21)

1. A method for installing or transporting an electrical apparatus in and out of a tower of a wind power installation,

wherein the electrical apparatus is provided in a foot of the tower,

wherein the tower comprises a reversibly detachable door frame comprising a door opening to an interior of the tower,

wherein the door frame has an outer contour that forms an area in a wall of the tower,

wherein a size of the electrical apparatus is larger than the door opening but smaller than the outer contour of the door frame,

wherein the door frame comprises at least one air intake opening for cooling of the electrical apparatus, wherein the at least one intake opening comprises a first ventilator that transports ambient air from an exterior of the tower to the interior of the tower,

wherein the door frame or the wall of the tower comprises an air discharge opening, wherein the air discharge opening comprises a second ventilator that transports air from the interior of the tower to the ambient air at the exterior of the tower,

which method comprises the steps of

(i) detaching and removing the door frame from the area in the wall of the tower;

(ii) attaching the electrical apparatus to a horizontal loading beam of a lifting appliance;

(iii) shifting the electrical apparatus along the horizontal loading beam;

(iv) transporting the electrical apparatus into or out of the interior of the tower through the area in the wall formed by the outer contour of the door frame; and

(v) reattaching the door frame to the area in the wall of the tower.

2. The method of claim 1 , wherein the door opening is closeable with a door leaf.

3. The method according to claim 1 , wherein the door frame has a substantially oval outside contour and the door opening is substantially rectangular.

4. The method of claim 1 , wherein the at least one air intake opening is arranged above the door opening or under the door opening or arranged both above and under the door opening,

for an air flow cooling of the electrical apparatus.

5. The method of claim 1 , wherein the at least one air intake opening is arranged below the door opening.

6. The method of claim 1 , wherein the at least one air intake opening is positioned below the door opening.

7. The method of claim 1 , wherein the at least one air intake opening is a first air intake positioned below the door opening, and a second air intake positioned above the door opening.

8. The method of claim 1 , wherein the at least one air intake opening is an air intake positioned below the door opening, and an air outlet is positioned above the door opening.

Assignments (7)
CHANGE OF ADDRESS Recorded Aug 31, 2023
From: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 064834/0873 →
CHANGE OF NAME Recorded Oct 20, 2022
From: SENVION DEUTSCHLAND GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 064371/0624 →
CHANGE OF NAME Recorded Sep 16, 2022
From: SENVION GMBH
To: SENVION DEUTSCHLAND GMBH
Reel/Frame 061462/0567 →
CHANGE OF NAME Recorded Aug 3, 2022
From: SENVION AG
To: SENVION GMBH
Reel/Frame 061068/0001 →
CHANGE OF NAME Recorded Jul 18, 2022
From: SENVION SE
To: SENVION AG
Reel/Frame 060692/0328 →
CHANGE OF NAME Recorded Oct 23, 2014
From: REPOWER SYSTEMS AG
To: SENVION SE
Reel/Frame 034036/0849 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 3, 2014
From: GAWRISCH, RÜDIGER; KLUGMANN, ROBERTO
To: REPOWER SYSTEMS AG
Reel/Frame 032594/0762 →