IP Library Granted Patent US 10,072,532
Granted Patent B2
US 10,072,532 · App. 14/199,312 · Granted Sep 11, 2018

Method for starting-up and operating a combined-cycle power plant

Inventors: Hamid Olia (Zürich, CH); Jan Schlesier (Wettingen, CH); Michael Breitfeld (Adliswil, CH); Philipp Brunner (Baden, CH); Mark Stevens (Ehrendingen, CH); Michael Caflisch (Fislisbach, CH)
Assignee: General Electric Technology GmbH
F01K23/10F01K13/02Y02E20/16
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,072,532
App. No.
14/199,312
Granted
Sep 11, 2018
Kind
B2
Abstract

A method for starting-up a steam turbine of a combined-cycle power plant is provided. The combined-cycle power plant includes a gas turbine and a steam power generation system having a steam turbine. The combined-cycle power plant activates at least one electric generator connectable to an electric grid. The gas turbine includes a compressor, such that, during starting-up of the steam turbine, both the gas turbine and the steam turbine are in operation. The steam turbine adjusts its load as a function of the load of the gas turbine in such a way that the sum of the load provided by the gas turbine and of the load provided by the steam turbine is equal to the auxiliary power demand of the plant. The load exported to the grid is equal to zero.

Claims (10)

1. A method for starting-up a combined-cycle power plant, the combined-cycle power plant comprising a gas turbine supplying exhaust flue gasses to a steam power generation system comprising a steam turbine, and further comprising at least one electric generator connectable to an electric grid, the method comprising:

operating the gas turbine to a house load operating point where a load exported to the electrical grid is equal to zero;

when a temperature of the exhaust flue gases provides a first steam admission into the steam turbine, increasing a load of the steam turbine and decreasing a load of the gas turbine until a minimum gas turbine exhaust flue gas temperature for providing the first steam admission into the steam turbine is reached, while maintaining the total generation power at the house load operating point where a load exported to the electrical grid is equal to zero; and

activating at least one electric generator connectable to an electric grid of the combined cycle power plant,

wherein at least (i) the minimum load value that the steam turbine can provide corresponds to the load that is sufficient to operate the steam turbine at nominal speed, (ii) the gas turbine operates at the house load until the steam turbine has reached the nominal speed, (iii) the maximum load value that the steam turbine can provide corresponds to that required for the auxiliary power demand of the plant, maintaining the compressor at its nominal speed, and (iv) active power is exported to the grid only after synchronizing the speed of the steam turbine to the speed of the gas turbine.

2. The method according to claim 1 , wherein the gas turbine adjusts its load by reducing it, such that the minimum load value provided by the gas turbine corresponds to the load with which the compressor operates at nominal speed.

3. The method according to claim 1 , wherein the gas turbine adjusts its load by increasing it, such that the maximum load value provided by the gas turbine corresponds to the load value required for the auxiliary power demand of the plant.

4. The method according to claim 1 , wherein the electric generator is disconnected to the grid.

5. The method according to claim 1 , wherein the electric generator is connected to the grid.

6. The method according to claim 1 , wherein the steam pressure in the steam power generation system is restricted by means of steam bypass stations.

Assignments (2)
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 6, 2014
From: OLIA, HAMID; SCHLESIER, JAN; BREITFELD, MICHAEL; BRUNNER, PHILIPP; STEVENS, MARK; CAFLISCH, MICHAEL
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 032826/0814 →
Priority Claims (1)
EP 13158063 · Mar 6, 2013 · regional
Continuity (1)
Related Publication 20140250901A1 · Sep 11, 2014