IP Library Granted Patent US 9,444,355
Granted Patent B2
US 9,444,355 · App. 14/208,549 · Granted Sep 13, 2016

Method and apparatus for determining a bridge mode for power conversion

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,444,355
App. No.
14/208,549
Granted
Sep 13, 2016
Kind
B2
Abstract

A method and apparatus for controlling power conversion. In one embodiment, the method comprises computing a ratio based on both voltage and charge pertaining to power conversion in a resonant converter; comparing the ratio to a threshold; and controlling, independent of switching frequency of the resonant converter, power output from the resonant converter based on whether the ratio satisfies the threshold.

Claims (23)

1. A method for controlling power conversion by a resonant converter, comprising:

receiving, at the resonant converter, electrical power for conversion;

dynamically selecting, during power conversion by the resonant converter, a mode from a plurality of modes for operating an H-bridge of the resonant converter, wherein the plurality of modes comprises a full H-bridge mode and a half H-bridge mode; and

operating the H-bridge in a mode selected from the plurality of modes, wherein dynamically selecting the mode comprises (i) computing a ratio based on an input voltage to the resonant converter, an output voltage from the resonant converter, and a charge transferred with respect to the H-bridge. and (ii) comparing the ratio to a threshold.

2. The method of claim 1 , wherein the H-bridge is operated in the half H-bridge mode when the ratio is less than the threshold, and wherein the H-bridge is operated in the full H-bridge mode when the ratio is greater than the threshold.

3. The method of claim 1 , further comprising controlling, when switching the H-bridge between operating in the full H-bridge mode and the half-H bridge mode, a charge of a capacitor of a resonant circuit of the resonant converter.

4. The method of claim 1 , wherein the H-bridge is an input bridge of the resonant converter and the charge transferred with respect to the H-bridge is transferred into or out of the input bridge, and wherein the ratio is further based on (i) a charge transferred with respect to an output bridge of the resonant converter, (ii) a required charge for switching the input bridge, and (iii) a required charge for switching the output bridge.

5. The method of claim 3 , wherein the charge of the capacitor is controlled by modulating a duty cycle of the H-bridge.

6. The method of claim 4 , wherein the required charge for switching the input bridge is a normalized charge (Qp 1 ) required to zero-voltage switch the input bridge, and wherein the required charge for switching the output bridge is a normalized charge (Qp 2 ) required to zero-voltage switch the output bridge.

7. An apparatus for power conversion by a resonant converter, comprising:

a bridge controller, coupled to an H-bridge of the resonant converter, for (a) dynamically selecting, during power conversion by the resonant converter, a mode from a plurality of modes for operating the H-bridge, wherein the plurality of modes comprises a full H-bridge mode and a half H-bridge mode; and (b) operating the H-bridge in a mode selected from the plurality of modes, wherein the bridge controller dynamically selects a mode from the plurality of modes b (i) computing in a ratio based on an input voltage to the resonant converter, an output voltage from the resonant converter, and a charge transferred with respect to the H-bridge, and (ii) comparing the ratio to a threshold.

8. The apparatus of claim 7 , wherein the H-bridge is operated in the half H-bridge mode when the ratio is less than the threshold, and wherein the H-bridge is operated in the full H-bridge mode when the ratio is greater than the threshold.

9. The apparatus of claim 7 , wherein the bridge controller controls, when switching the H-bridge between operating in the full H-bridge mode and the half-H bridge mode, a charge of a capacitor of a resonant circuit of the resonant converter.

10. The apparatus of claim 7 , wherein the H-bridge is an input bridge of the resonant converter and the charge transferred with respect to the H-bridge is transferred into or out of the input bridge, and wherein the ratio is further based on (i) a charge transferred with respect to an output bridge of the resonant converter, (ii) a required charge for switching the input bridge, and (iii) a required charge for switching the output bridge.

11. The apparatus of claim 9 , wherein the charge of the capacitor is controlled by modulating a duty cycle of the H-bridge.

12. The apparatus of claim 10 , wherein the required charge for switching the input bridge is a normalized charge (Qp 1 ) required to zero-voltage switch the input bridge, and wherein the required charge for switching the output bridge is a normalized charge (Qp 2 ) required to zero-voltage switch the output bridge.

13. A system for power conversion, comprising:

a photovoltaic (PV) module; and

a resonant converter, coupled to the PV module for converting input power from the PV module to output power, wherein the resonant converter comprises an H-bridge and a bridge controller, coupled to the H-bridge, for (a) dynamically selecting, during power conversion by the resonant converter, a mode from a plurality of modes for operating the H-bridge, wherein the plurality of modes comprises a full H-bridge mode and a half H-bridge mode; and (b) operating the H-bridge in a mode selected from the plurality of modes, wherein the bride controller dynamically selects a mode from the plurality of modes by (i) computing a ratio based on an input voltage to the resonant converter, an output voltage from the resonant converter, and a charge transferred with respect to the H-bridge, and (ii) comparing the ratio to a threshold.

14. The system of claim 13 , wherein the H-bridge is operated in the half H-bridge mode when the ratio is less than the threshold, and wherein the H-bridge is operated in the full H-bridge mode when the ratio is greater than the threshold.

15. The system of claim 13 , wherein the bridge controller controls, when switching the H-bridge between operating in the full H-bridge mode and operating in the half-H bridge mode, a charge of a capacitor of a resonant circuit of the resonant converter, and wherein the charge of the capacitor is controlled by modulating a duty cycle of the H-bridge.

16. The system of claim 13 , wherein the H-bridge is an input bridge of the resonant converter and the charge transferred with respect to the H-bridge is transferred into or out of the input bridge, and wherein the ratio is further based on (i) a charge transferred with respect to an output bridge of the resonant converter, (ii) a required charge for switching the input bridge, and (iii) a required charge for switching the output bridge.

17. The system of claim 16 , wherein the required charge for switching the input bridge is a normalized charge (Qp 1 ) required to zero-voltage switch the input bridge, and wherein the required charge for switching the output bridge is a normalized charge (Qp 2 ) required to zero-voltage switch the output bridge.

Assignments (7)
RELEASE OF SECURITY INTEREST Recorded Feb 26, 2020
From: FLEXTRONICS INDUSTRIAL, LTD.; FLEXTRONICS AMERICA, LLC
To: ENPHASE ENERGY, INC.
Reel/Frame 052022/0954 →
CORRECTIVE ASSIGNMENT TO CORRECT THE RECEIVING PARTY NAME PREVIOUSLY RECORDED AT REEL: 041936 FRAME: 0109. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY INTEREST. Recorded Apr 17, 2017
From: ENPHASE ENERGY, INC.
To: FLEXTRONICS INDUSTRIAL, LTD; FLEXTRONICS AMERICA, LLC
Reel/Frame 043339/0856 →
SECURITY AGREEMENT Recorded Dec 30, 2016
From: ENPHASE ENERGY, INC.
To: FLEXTRONICS INDUSTRIAL, LTD
Reel/Frame 041958/0820 →
SECURITY INTEREST Recorded Dec 30, 2016
From: ENPHASE ENERGY, INC.
To: FLEXTRONICS AMERICA, LLC
Reel/Frame 041936/0109 →
SECURITY INTEREST Recorded Dec 30, 2016
From: ENPHASE ENERGY, INC.
To: OBSIDIAN AGENCY SERVICES, INC.
Reel/Frame 041225/0509 →
SECURITY INTEREST Recorded Dec 28, 2016
From: ENPHASE ENERGY, INC.
To: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS AGENT
Reel/Frame 041210/0283 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 24, 2014
From: ZIMMANCK, DONALD RICHARD
To: ENPHASE ENERGY, INC.
Reel/Frame 032508/0339 →