App. No. 14/216,179

Systems and methods for managing conditional curtailment options

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
14/216,179
Abstract

Systems and methods for producing recommended Transmission Service Reservation (TSR) actions whereby a Criteria Monitoring Process and Tag Identification and Action Process uses CCO Criteria, Capacity, Curtailment Interval, Model Elements Monitor, Tag Transactions, and Capacity Computation results to produce Recommended TSR Actions and Recommended Tag Actions based upon existing Conditional Curtailment Options on TSRs. Additional systems and methods disclosed further include the previous systems and methods with the additional ability to take action of the Recommended TSR Actions and Recommended Tag Actions.

Claims (29)

1 . A method of managing conditional curtailment options (CCOs), comprising the steps of:

receiving a transmission service reservation (TSR), the TSR including a set of conditional curtailment options, a capacity value for the amount of transmission capacity subject to the CCO, a curtailment interval of time over which the CCO is monitored, and tag transactions;

inputting the TSR to a congestion management system;

monitoring the CCO Criteria using a criteria monitoring process;

processing the TSR with the congestion management system to produce recommended TSR actions;

monitoring TSRs with a tag identification and action process to produce and recommended tag actions based upon recommended TSR actions.

2 . The method of claim 1 wherein the recommended TSR action is the adjustment of a priority value of the TSR.

3 . The method of claim 1 wherein the recommended TSR action is the adjustment of a transmission limit of the TSR.

4 . The method of claim 1 wherein the recommend tag action is the adjustment of a tag's priority value.

5 . The method of claim 1 wherein the recommend tag action is the adjustment of a tag's limit to match its corresponding TSR.

6 . The method of claim 1 wherein the CCO criteria are one or more of the criteria selected from the group consisting of criteria used to record a set of enumerated values to be used to identify the nature of the CCO, criteria establishing the default value to be applied for the CCO, criteria enabling the ability of user to manually enter an amount of capacity subject to CCO at less than the full capacity of the TSR, criteria recording a relative time that a given set of CCO conditions will remain in effect, criteria recording a relative time period prior to expiration of current CCO conditions when notification of the need for reassessment will be issued to the user, and criteria recording a relative time between successive notifications of need for reassessment will be issued to the TP.

7 . The method of claim 1 wherein the TSR further includes an indication of the model element to monitor the corresponding element of the physical model the TSR is associated with.

8 . The method of claim 1 further including the step of determining the capacity computation results, which are the capacity values on each element in the physical model of the electrical grid the TSR containing the CCOs used to reserve transmission on.

9 . The method of claim 1 in which the recommend TSR actions and recommend tag actions are performed.

10 . A system of managing conditional curtailment options (CCOs), comprising:

a computer having a memory and a computer program running in the memory, the computer program being configured to:

receive a transmission service reservation (TSR), the TSR including a set of conditional curtailment options, a capacity value for the amount of transmission capacity subject to the CCO, a curtailment interval of time over which the CCO is monitored, and tag transactions;

input the TSR to a congestion management system;

monitor the CCO Criteria using a criteria monitoring process;

process the TSR with the congestion management system to produce recommended TSR actions;

monitor TSRs with a tag identification and action process to produce and recommended tag actions based upon recommended TSR actions.

11 . The system of claim 10 wherein the recommended TSR action is the adjustment of a priority value of the TSR.

12 . The system of claim 10 wherein the recommended TSR action is the adjustment of a transmission limit of the TSR.

13 . The system of claim 10 wherein the recommend tag action is the adjustment of a tag's priority value.

14 . The system of claim 10 wherein the recommend tag action is the adjustment of a tag's limit to match its corresponding TSR.

15 . The system of claim 10 wherein the CCO criteria are one or more of the criteria selected from the group consisting of criteria used to record a set of enumerated values to be used to identify the nature of the CCO, criteria establishing the default value to be applied for the CCO, criteria enabling the ability of user to manually enter an amount of capacity subject to CCO at less than the full capacity of the TSR, criteria recording a relative time that a given set of CCO conditions will remain in effect, criteria recording a relative time period prior to expiration of current CCO conditions when notification of the need for reassessment will be issued to the user, and criteria recording a relative time between successive notifications of need for reassessment will be issued to the TP.

16 . The system of claim 10 wherein the TSR further includes an indication of the model element to monitor the corresponding element of the physical model the TSR is associated with.

17 . The system of claim 10 further including the step of determining the capacity computation results, which are the capacity values on each element in the physical model of the electrical grid the TSR containing the CCOs used to reserve transmission on.

18 . The system of claim 10 in which the recommend TSR actions and recommend tag actions are performed.

Assignments (3)
RELEASE OF SECURITY INTEREST Recorded May 8, 2019
From: ASSOCIATED BANK, NATIONAL ASSOCIATION
To: OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
Reel/Frame 049113/0532 →
SECURITY INTEREST Recorded Nov 5, 2018
From: OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
To: ASSOCIATED BANK, NATIONAL ASSOCIATION
Reel/Frame 047414/0016 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 25, 2014
From: HAGHIGHI, KHASHAYAR NODEHI FARD; SORENSON, PAUL RAYMOND; MOKHTARI, SASAN; GLAIM, STEVEN ALLEN; SARKINEN, KEVIN JOHN
To: OPEN ACCESS TECHNOLOGY INTERNATIONAL, INC.
Reel/Frame 032520/0474 →