IP Library Granted Patent US 9,174,415
Granted Patent B2
US 9,174,415 · App. 14/238,817 · Granted Nov 3, 2015

Composite and preparation method of joining amorphous alloy material to heterogeneous material

Inventors: Qing Gong (Guangdong, CN); Faliang Zhang (Guangdong, CN); Yunchun Li (Guangdong, CN)
Assignees: Shenzhen BYD Auto R&D Company Limited; BYD Company Limited
B32B15/01B22D19/04B22D19/08C22C45/00C22C45/001C22C45/008C22C45/04C22C45/10Y10T428/12493
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,174,415
App. No.
14/238,817
Granted
Nov 3, 2015
Kind
B2
Abstract

A method of joining an amorphous alloy material to a heterogeneous material and a composite formed by the same are provided. The method comprises steps of: placing a pre-formed piece made of one of the amorphous alloy material and the heterogeneous material into a mold; heating the other of the amorphous alloy material and the heterogeneous material to a predetermined temperature, and casting the other of the amorphous alloy material and the heterogeneous material into the mold to form a transition connection part joining the amorphous alloy material to the heterogeneous material and having a fusion welded structure, a microstructure reinforcing connection structure and a composite connection structure; and cooling the amorphous alloy material and the heterogeneous material at a rate higher than a critical cooling rate of the amorphous alloy material to obtain a composite formed by joining the amorphous alloy material to the heterogeneous material by the transition connection part.

Claims (13)

1. A method of joining an amorphous alloy material to a heterogeneous material, comprising steps of:

placing a first pre-formed piece made of one material selected from the group consisting of the amorphous alloy material and the heterogeneous material into a mold;

heating a second piece made of one material selected from the group consisting of the amorphous alloy material and the heterogeneous material to a predetermined temperature to form a melt, wherein the first pre-formed piece and the second piece are made of different material;

casting the melt into the mold to form a transition connection part, the transition connection part joining the amorphous alloy material to the heterogeneous material and having one of a fusion welded structure, a microstructure reinforcing connection structure and a composite connection structure, in which the fusion welded structure is formed by the amorphous alloy material and the heterogeneous material via fusion welding, the microstructure reinforcing connection structure is formed by a microstructure on a surface of the pre-formed piece and the other of the amorphous alloy material and the heterogeneous material, and the composite connection structure comprises the fusion welded structure and the microstructure reinforcing connection structure; and

cooling the amorphous alloy material and the heterogeneous material at a rate higher than a critical cooling rate of the amorphous alloy material to obtain a composite formed by the amorphous alloy material to the heterogeneous material joined via the transition connection part,

wherein the first pre-formed piece is made of the heterogeneous material, and the amorphous alloy material is heated to a temperature not lower than a glass transition temperature thereof and cast into the mold, in which a casting temperature of the amorphous alloy material in a first region of the mold is lower than a melting temperature of the heterogeneous material, and a casting temperature of the amorphous alloy material in a second region of the mold is higher than the melting temperature of the heterogeneous material by a predetermined value.

2. The method according to claim 1 , wherein the amorphous alloy material is a bulk amorphous alloy material with a critical size larger than about 1 mm and has an elastic limit of about 0.5% or greater; and wherein the amorphous alloy material contains crystalline substances or is doped with inorganic substances.

3. The method according to claim 1 , wherein the amorphous alloy material is selected from the group consisting of a Fe-based amorphous alloy, a Zr-based amorphous alloy, a Cu-based amorphous alloy, a Ti-based amorphous alloy, and a Ni-based amorphous alloy; and wherein the heterogeneous material is selected from the group consisting of a steel, an aluminum alloy, a magnesium alloy, a nickel alloy, a copper alloy, a titanium alloy, a zinc alloy, a plastic material, ceramics, glass, a heterogeneous bulk amorphous alloy, and any combination thereof.

4. The method according to claim 1 , wherein the amorphous alloy material is heated to a temperature not lower than a melting temperature thereof.

5. The method according to claim 1 , wherein the predetermined temperature is not less than about 15% of the melting temperature of the heterogeneous material.

6. The method according to claim 1 , wherein a microstructure is formed on at least a portion of a surface of the first pre-formed piece joined to the second piece of the amorphous alloy material and the heterogeneous material, the transition connection part has the microstructure reinforcing connection structure, and the microstructure reinforcing connection structure is formed by the microstructure and the other of the amorphous alloy material and the heterogeneous material.

7. The method according to claim 6 , wherein the microstructure is at least one of a hole, a closed or semi-closed honeycomb structure, and a surface structure with a roughness between about 1 μm and about 250 μm.

8. The method according to claim 7 , wherein a minimum three-dimensional feature size of the hole and/or the honeycomb structure is about 1 μm to about 3000 μm.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 10, 2020
From: SHENZHEN BYD AUTO R&D COMPANY LIMITED; BYD COMPANY LIMITED
To: BYD COMPANY LIMITED
Reel/Frame 051556/0053 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 19, 2014
From: GONG, QING; ZHANG, FALIANG; LI, YUNCHUN
To: SHENZHEN BYD AUTO R&D COMPANY LIMITED; BYD COMPANY LIMITED
Reel/Frame 032246/0954 →
Priority Claims (1)
CN 2011 1 0237931 · Aug 18, 2011 · national
Continuity (1)
Related Publication 20140199560A1 · Jul 17, 2014