IP Library Granted Patent US 9,689,789
Granted Patent B2
US 9,689,789 · App. 14/241,560 · Granted Jun 27, 2017

Damage evaluation method and maintenance evaluation index decision method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,689,789
App. No.
14/241,560
Granted
Jun 27, 2017
Kind
B2
Abstract

A first measured value of a specific physical quantity at a target portion is correlated with a damage evaluation index to calculate a damage degree corresponding to the first measured value. The specific physical quantity is measured at least once at a position corresponding to the first measurement position in another time period having a different usage elapsed time from that of the first measurement, and these second and subsequent measured values are correlated with damage degrees calculated based on temporal changes corresponding to the second and subsequent measurements. A new damage evaluation index is approximately calculated based on a relationship between the first, second, and subsequent measured values and the damage degrees corresponding to the first, second, and subsequent measured values.

Claims (13)

1. A damage evaluation method, which evaluates a creep damage ratio of a target portion which changes over time in a structural member, the damage evaluation method comprising:

a first process of correlating a first measured value of a number density of creep voids at a first measurement position of the target portion with a damage evaluation curve indicating a relationship between a number density of the creep voids and a creep damage ratio which is generated based on a temporal change, and calculating a creep damage ratio corresponding to the first measured value;

a second process of measuring a measured value of the number density of the creep voids at least once, as a second measured value, at a position corresponding to the first measurement position in another time period having a different usage elapsed time from that of the first measured value, and correlating the second and any subsequent measured values with a creep damage ratio calculated based on temporal changes corresponding to the second and any subsequent measured values;

a third process of approximately calculating a new damage evaluation curve based on a relationship between the first, second, and any subsequent measured values and the creep damage ratio corresponding to the first, second, and any subsequent measured values;

a fourth process of evaluating the creep damage ratio from the first, second, and any subsequent measured values of the number density of the creep voids, based on the new damage evaluation curve calculated in the third process; and

a fifth process of determining a lifetime of the structural member based on the fourth process of evaluating the creep damage ratio for performing maintenance on the structural member when appropriate based on the fourth process of evaluating the creep damage ratio.

2. The damage evaluation method according to claim 1 ,

wherein the first process, the second process, and the third process are repeated based on the new damage evaluation curve.

3. The damage evaluation method according to claim 1 ,

wherein the structural member is formed of heat-resistant steel.

4. The damage evaluation method according to claim 3 ,

wherein the target portion is a welding heat-affected portion of the structural member formed of heat-resistant steel.

5. A maintenance evaluation index decision method using the damage evaluation method according to claim 1 .

Assignments (4)
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVING PATENT APPLICATION NUMBER 11921683 PREVIOUSLY RECORDED AT REEL: 054975 FRAME: 0438. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded May 26, 2023
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 063787/0867 →
CHANGE OF NAME Recorded Jan 13, 2021
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 054975/0438 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 4, 2015
From: MITSUBISHI HEAVY INDUSTRIES, LTD.
To: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
Reel/Frame 034886/0095 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 27, 2014
From: KOMAI, NOBUYOSHI; FUKUSHIMA, HIROAKI; HIRAKAWA, YUICHI; OHYAMA, HIROYUKI; MIYAZAWA, TAKESHI; YOSHIDA, HIROAKI
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 032314/0252 →