IP Library Granted Patent US 9,885,629
Granted Patent B2
US 9,885,629 · App. 14/249,027 · Granted Feb 6, 2018

Inspection apparatus, inspection method, and battery-inspecting chamber

Inventors: Mamoru Baba (Fukushima, JP); Takeshi Sato (Fukushima, JP); Masaaki Kitaura (Fukushima, JP)
Assignee: Murata Manufacturing Co., Ltd.
G01M3/363
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,885,629
App. No.
14/249,027
Granted
Feb 6, 2018
Kind
B2
Abstract

An inspection apparatus includes a chamber and a pressurizer. The chamber includes a space portion configured to house at least a sealed portion of a battery, and an opening portion configured to open a partial portion of the battery other than the sealed portion to an atmosphere. The pressurizer is configured to put the space portion into a pressurized state.

Claims (29)

1. An inspection apparatus, comprising:

a chamber including (i) a space portion configured to house at least a sealed portion of a battery and (ii) an opening portion configured to open a partial portion of the battery other than the sealed portion to an atmosphere;

a pressurizer configured to put the space portion into a pressurized state; and

a measurement unit comprising a displacement sensor configured to measure an amount of swelling deformation of the partial portion of the battery.

2. The inspection apparatus according to claim 1 , wherein the opening portion is a hole portion.

3. The inspection apparatus according to claim 1 , wherein the opening portion is an isolated-space-forming portion configured to spatially isolate the partial portion of the battery within the space portion, and the isolated-space-forming portion is in communication with the atmosphere.

4. The inspection apparatus according to claim 1 , further comprising a control unit configured to indicate, when the amount of swelling deformation measured by the measurement unit is above a defined value, that a sealing failure is caused via an output unit.

5. The inspection apparatus according to claim 1 , wherein the battery includes a battery element and a laminate film with which the battery element is covered.

6. The inspection apparatus according to claim 1 , further comprising a pressure controller connected to the pressurizer and the chamber and configured to adjust a pressure of a compressed gas supplied from the pressurizer into a predetermined pressure and supply the adjusted compressed gas into the chamber.

7. The inspection apparatus according to claim 1 , wherein the chamber further comprises:

a first supporting member and a second supporting member configured to sandwich and support a portion of the battery; and

a position adjuster, the position adjuster connected to the second supporting member and configured to adjust a position of the second supporting member.

8. The inspection apparatus according to claim 1 , further comprising an exhaust portion configured to put the chamber into a vacuum state.

9. The inspection apparatus according to claim 8 , wherein the exhaust portion comprises a vacuum pump.

10. An inspection method, comprising:

housing at least a sealed portion of a battery in a space portion of a chamber;

putting the space portion into a pressurized state and opening the partial portion of the battery other than the sealed portion to an atmosphere; and

checking swelling deformation of the partial portion of the battery by using a displacement sensor.

11. The inspection method according to claim 10 , wherein checking the swelling deformation comprises visually observing the swelling deformation of the partial portion of the battery.

12. An inspection apparatus, comprising:

a chamber including (1) a space portion configured to house at least a sealed portion of an inspection target and (2) an opening portion configured to open a partial portion of the inspection target other than the sealed portion to an atmosphere;

a pressurizer configured to put the space portion into a pressurized state;

a pressure controller connected to the pressurizer and the chamber and configured to adjust a pressure of a compressed gas supplied from the pressurizer into a predetermined pressure and supply the adjusted compressed gas into the chamber; and

a measurement unit comprising a displacement sensor configured to measure an amount of swelling deformation of the partial portion of the inspection target.

13. The inspection apparatus according to claim 12 , further comprising a control apparatus (a) connected to the pressurizer and the pressure controller and (b) configured to control the pressurizer and the pressure controller.

14. The inspection apparatus according to claim 13 , wherein the control apparatus is configured to control a gas-compressing operation of the pressurizer.

15. The inspection apparatus according to claim 13 , wherein the control apparatus is configured to output a control signal to the pressure controller and adjust the pressure of the compressed gas supplied from the pressurizer to the chamber into the predetermined pressure.

16. The inspection apparatus according to claim 12 , further comprising a display apparatus connected to the control apparatus, wherein the control apparatus displays, based on a supply signal supplied from the pressure controller, information on a control state of the pressure controller on the display apparatus.

17. The inspection apparatus according to claim 12 , wherein the pressure controller comprises an air filter configured to prevent moisture and particles in the compressed gas from entering the pressure controller.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 15, 2017
From: TOHOKU MURATA MANUFACTURING CO.
To: MURATA MANUFACTURING CO., LTD.
Reel/Frame 044894/0441 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 15, 2017
From: SONY CORPORATION
To: TOHOKU MURATA MANUFACTURING CO., LTD.
Reel/Frame 044894/0461 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 10, 2014
From: BABA, MAMORU; SATO, TAKESHI; KITAURA, MASAAKI
To: SONY CORPORATION
Reel/Frame 032659/0958 →
Priority Claims (1)
JP 2013-088917 · Apr 19, 2013 · national
Continuity (1)
Related Publication 20140311223A1 · Oct 23, 2014