IP Library Granted Patent US 9,739,137
Granted Patent B2
US 9,739,137 · App. 14/254,108 · Granted Aug 22, 2017

Downhole temperature calculation

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,739,137
App. No.
14/254,108
Granted
Aug 22, 2017
Kind
B2
Abstract

A method for calculating a value representative of a downhole temperature in a hydrocarbon well, wherein the well includes production tubing inside an outer tubing, an annulus is provided between the production tubing and the outer tubing, and the annulus receives a hydraulic control line supplying hydraulic fluid for the control of a downhole device, the method including sensing the pressure of hydraulic fluid in the control line at the wellhead, and using a measurement of the pressure to calculate the value representative of the downhole temperature.

Claims (11)

1. A method of calculating a value representative of a downhole temperature in a hydrocarbon well, wherein the hydrocarbon well comprises a production tubing inside an outer tubing, an annulus is provided between the production tubing and the outer tubing, and the annulus receives a hydraulic control line supplying hydraulic fluid for the control of a downhole device, the method comprising:

sensing a pressure of the hydraulic fluid in the hydraulic control line at a wellhead; and

using the sensed pressure of the hydraulic fluid in the hydraulic control line to calculate the value representative of the downhole temperature.

2. The method according to claim 1 , wherein the downhole device is at a first downhole zone, the hydrocarbon well further comprises an additional downhole device at a second downhole zone, and the annulus further receives an additional hydraulic control line supplying hydraulic fluid for the control of the additional downhole device, the method further comprising:

sensing a pressure of the hydraulic fluid in the additional hydraulic control line at the wellhead to calculate the value representative of the downhole temperature.

3. The method according to claim 2 , wherein the sensing of the pressure of the hydraulic fluid in the additional hydraulic control line is carried out at a tree at the wellhead.

4. The method according to claim 1 , wherein the sensing of the pressure of the hydraulic fluid in the hydraulic control line is carried out at a tree at the wellhead.

5. The method according to claim 1 , further comprising:

sensing a temperature of a production fluid at the wellhead; and

using the sensed temperature of the production fluid to calculate the value representative of the downhole temperature.

6. The method according to claim 5 , wherein the sensing of the temperature of the production fluid is carried out at a tree at the wellhead.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 27, 2015
From: VETCO GRAY CONTROLS LIMITED
To: GE OIL & GAS UK LIMITED
Reel/Frame 035316/0821 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 16, 2014
From: ELLSON, NICHOLAS JOSEP
To: VETCO GRAY CONTROLS LIMITED
Reel/Frame 032684/0992 →