IP Library Patent Application 14262851
Patent Application
App. No. 14/262,851

BUILDING MANAGEMENT SYSTEM

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
14/262,851
Abstract

An operation control apparatus and an operation control system are provided in which facility equipment operation is performed according to a facility environment. In the building management system including a facility equipment and a control device to control the facility equipment, the control device obtains an operation time in an intermittent operation of the facility equipment based on a second in-room people number ratio obtained by multiplying a first in-room people number ratio, which is a ratio of an actual in-room people number to a maximum in-room people number in an area where the facility equipment is provided, by a multiplying factor whose value becomes large as an operation necessity of the facility equipment becomes high.

Claims (6)

1 . A building management system comprising a facility equipment and a control device to control the facility equipment, wherein

the control device obtains an operation time in an intermittent operation of the facility equipment based on a second in-room people number ratio obtained by multiplying a first in-room people number ratio, which is a ratio of an actual in-room people number to a maximum in-room people number in an area where the facility equipment is provided, by a multiplying factor whose value becomes large as an operation necessity of the facility equipment becomes high.

2 . The building management system according to claim 1 , wherein the operation time is obtained by multiplying an intermittent operation control time of the facility equipment by the second in-room people number ratio.

3 . The building management system according to claim 1 , further comprising a display device capable of inputting and outputting information on control of the facility equipment, wherein the multiplying factor is inputted from the display device.

4 . The building management system according to claim 1 , wherein the multiplying factor is set for at least one of every day, every month and every season.

5 . The building management system according to claim 2 , further comprising a display device capable of inputting and outputting information on control of the facility equipment, wherein the multiplying factor is inputted from the display device.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 5, 2014
From: HITACHI, LTD.
To: HITACHI INDUSTRY & CONTROL SOLUTIONS, LTD.
Reel/Frame 034109/0447 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 28, 2014
From: KOBAYASHI, OSAMU
To: HITACHI, LTD.
Reel/Frame 032765/0200 →