IP Library Granted Patent US 9,615,372
Granted Patent B2
US 9,615,372 · App. 14/289,958 · Granted Apr 4, 2017

Method and apparatus for processing receive/transmit transition time of user equipment

Inventors: Juan Zheng (Beijing, CN); Lixia Xue (Beijing, CN)
Assignee: HUAWEI TECHNOLOGIES CO., LTD.
H04W72/082H04W24/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,615,372
App. No.
14/289,958
Granted
Apr 4, 2017
Kind
B2
Abstract

In the present application, when the problem of co-channel interference between base stations is eliminated, normal neighboring cell measurement can still be performed on a second base station by delaying receive/transmit transition time of the user equipment. The method includes: receiving, by the user equipment, first indication information sent by a first base station; determining, by the user equipment according to the first indication information, receive/transmit transition time needing to be delayed; determining, by the user equipment according to the receive/transmit transition time needing to be delayed, a downlink time of performing neighboring cell measurement for a second base station, and performing, by the user equipment, neighboring cell measurement for the second base station at the downlink time. The present application is applicable to the field of wireless communications systems.

Claims (52)

1. A method for processing receive/transmit transition time of a user equipment, comprising:

receiving, by a user equipment, first indication information sent by a first base station;

determining, by the user equipment according to the first indication information, receive/transmit transition time needing to be delayed;

determining, by the user equipment according to the receive/transmit transition time needing to be delayed, a downlink time of performing neighboring cell measurement for a second base station; and

performing, by the user equipment, neighboring cell measurement for the second base station at the downlink time,

wherein the first indication information comprises configuration information of an interference coordination mechanism adopted by the first base station and configuration information of the first base station, and

wherein the determining, by the user equipment according to the first indication information, the receive/transmit transition time needing to be delayed comprises:

determining, according to the configuration information of the interference coordination mechanism adopted by the first base station and the configuration information of the first base station, whether an uplink service exists at a first uplink time;

when the uplink service does not exist, determining that the receive/transmit transition time needing to be delayed is not zero; and

when the uplink service exists, determining that the receive/transmit transition time needing to be delayed is zero.

2. The method according to claim 1 , wherein the receiving, by the user equipment, the first indication information sent by the first base station comprises:

receiving, by the user equipment, the first indication information which is sent by the first base station through first signaling, wherein the first signaling comprises:

radio resource control RRC broadcast signaling, or RRC-specific signaling, or physical layer signaling.

3. The method according to claim 1 , wherein

the first indication information comprises: information indicating whether the user equipment needs to delay the receive/transmit transition time, and/or information of specific delayed time for receive/transmit transition.

4. A method for processing receive/transmit transition time of a user equipment, comprising:

determining, by a first base station, first indication information needing to be sent to a user equipment; and

sending, by the first base station, the first indication information to the user equipment, so that the user equipment determines, according to the first indication information, receive/transmit transition time needing to be delayed, further determines, according to the receive/transmit transition time needing to be delayed, a downlink time of performing neighboring cell measurement for a second base station, and performs neighboring cell measurement for the second base station at the downlink time,

wherein the first indication information comprises configuration information of an interference coordination mechanism adopted by the first base station and configuration information of the first base station, and

wherein the determining, by the user equipment according to the first indication information, the receive/transmit transition time needing to be delayed comprises:

determining, according to the configuration information of the interference coordination mechanism adopted by the first base station and the configuration information of the first base station, whether an uplink service exists at a first uplink time;

when the uplink service does not exist, determining that the receive/transmit transition time needing to be delayed is not zero; and

when the uplink service exists, determining that the receive/transmit transition time needing to be delayed is zero.

5. The method according to claim 4 , wherein the sending, by the first base station, the first indication information to the user equipment comprises: sending, by the first base station, the first indication information to the user equipment through first signaling, and the first signaling comprises:

radio resource control RRC broadcast signaling, or RRC-specific signaling, or physical layer signaling.

6. The method according to claim 4 , wherein the first indication information comprises: information indicating whether the user equipment needs to delay the receive/transmit transition time, and/or information of specific delayed time for receive/transmit transition.

7. A user equipment, comprising:

at least one memory comprising instructions and at least one hardware processor to execute the instructions within the at least one memory to implement:

receiving first indication information sent by a first base station;

determining, according to the first indication information, receive/transmit transition time needing to be delayed, and determining, according to the receive/transmit transition time needing to be delayed, a downlink time of performing neighboring cell measurement for a second base station; and

performing neighboring cell measurement for the second base station at the downlink time,

wherein the first indication information comprises configuration information of an interference coordination mechanism adopted by the first base station and configuration information of the first base station, and

wherein the at least one hardware processor executes the instructions within the at least one memory to implement:

determining, according to the configuration information of the interference coordination mechanism adopted by the first base station and the configuration information of the first base station, whether an uplink service exists at a first uplink time;

when the uplink service does not exist, determining that the receive/transmit transition time needing to be delayed is not zero; and

when the uplink service exists, determining that the receive/transmit transition time needing to be delayed is zero.

8. The user equipment according to claim 7 , wherein the receiving the first indication information sent by the first base station is performed through first signaling, and the first signaling comprises:

radio resource control RRC broadcast signaling, or RRC-specific signaling, or physical layer signaling.

9. The user equipment according to claim 7 , wherein the first indication information comprises:

information indicating whether the user equipment needs to delay the receive/transmit transition time, and/or information of specific delayed time for receive/transmit transition.

10. A base station, comprising:

at least one memory comprising instructions and at least one hardware processor to execute the instructions within the at least one memory to implement:

determining first indication information needing to be sent to a user equipment; and

sending the first indication information to the user equipment, so that the user equipment determines, according to the first indication information, receive/transmit transition time needing to be delayed, further determines, according to the receive/transmit transition time needing to be delayed, a downlink time of performing neighboring cell measurement for a second base station, and performs neighboring cell measurement for the second base station at the downlink time,

wherein the first indication information comprises configuration information of an interference coordination mechanism adopted by the first base station and configuration information of the first base station, and

wherein the determining, by the user equipment according to the first indication information, the receive/transmit transition time needing to be delayed comprises:

determining, according to the configuration information of the interference coordination mechanism adopted by the first base station and the configuration information of the first base station, whether an uplink service exists at a first uplink time;

when the uplink service does not exist, determining that the receive/transmit transition time needing to be delayed is not zero; and

when the uplink service exists, determining that the receive/transmit transition time needing to be delayed is zero.

11. The base station according to claim 10 , wherein the sending the first indication information to the user equipment is performed through first signaling, and the first signaling comprises:

radio resource control RRC broadcast signaling, or RRC-specific signaling, or physical layer signaling.

12. The base station according to claim 10 , wherein the first indication information comprises: information indicating whether the user equipment needs to delay the receive/transmit transition time, and/or information of specific delayed time for receive/transmit transition.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 13, 2021
From: HUAWEI TECHNOLOGIES CO., LTD.
To: HONOR DEVICE CO., LTD.
Reel/Frame 055919/0344 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 29, 2014
From: ZHENG, JUAN; XUE, LIXIA
To: HUAWEI TECHNOLOGIES CO., LTD.
Reel/Frame 032988/0082 →
Priority Claims (1)
CN 2011 1 0396227 · Dec 2, 2011 · national
Continuity (2)
Continuation PCTCN2012085220 · Nov 24, 2012
Related Publication 20140307662A1 · Oct 16, 2014