IP Library Granted Patent US 9,518,235
Granted Patent B2
US 9,518,235 · App. 14/314,023 · Granted Dec 13, 2016

Entrained-flow gasifier and gasification method using the same for synthesizing syngas from biomass fuel

Inventors: Yilong Chen (Wuhan, CN); Yanfeng Zhang (Wuhan, CN); Minggui Xia (Wuhan, CN); Liang Zhang (Wuhan, CN)
Assignee: WUHAN KAIDI ENGINEERING TECHNOLOGY RESEARCH INSTITUTE CO., LTD.
C10J3/72C10J3/18C10J3/485C10J3/506C10J3/723C10J2200/152C10J2300/0906C10J2300/0916C10J2300/0959C10J2300/0976C10J2300/1238Y02P20/145
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,518,235
App. No.
14/314,023
Granted
Dec 13, 2016
Kind
B2
Abstract

A microwave plasma based entrained flow gasifier of biomass, including a furnace body and a fuel pretreatment system. The furnace body includes a fuel inlet disposed at the lower part of the furnace body, a syngas outlet disposed at the top of the furnace body, and a slag outlet disposed at the bottom of the furnace body. The fuel inlet presents in the form of nozzles. The fuel pretreatment system is disposed outside of the furnace body, and includes a fuel crushing apparatus, a sieving apparatus disposed downstream to the fuel crushing apparatus, a first fuel container for receiving particle size-qualified fuel, a second fuel container for receiving particle size-unqualified fuel, and a feeding hopper disposed downstream to the first fuel container. The first fuel container and the second fuel container are disposed side-by-side downstream to the sieving apparatus.

Claims (13)

1. A gasifier, comprising: a furnace body and a fuel pretreatment system, wherein the furnace body is vertically disposed and comprises a fuel inlet disposed at a lower part of the furnace body, a syngas outlet disposed at a top of the furnace body, and a slag outlet disposed at a bottom of the furnace body;

the fuel inlet comprises nozzles;

the fuel pretreatment system is disposed outside of the furnace body, and comprises a fuel crushing apparatus, a sieving apparatus disposed downstream to the fuel crushing apparatus, a first fuel container for receiving particle size-qualified fuel, a second fuel container for receiving particle size-unqualified fuel, and a feeding hopper disposed downstream to the first fuel container;

the first fuel container and the second fuel container are disposed side-by-side downstream to the sieving apparatus;

a bottom of the feeding hopper is connected to the furnace body via the nozzles;

a monitoring unit is disposed close to the syngas outlet at the top of the furnace body;

the nozzles are disposed radially along the furnace body and are between 2 and 4 in number; and

one or two layers of microwave plasma generators are disposed in parallel at a gasification zone of the furnace body, and each layer of the microwave plasma generator comprises between 2 and 4 working gas inlets.

2. The gasifier of claim 1 , wherein the microwave plasma generators are disposed horizontally/tangentially on the furnace body.

3. The gasifier of claim 1 , wherein the microwave plasma generators have large electrode gap, strong plasma activity, and wide volume range.

4. The gasifier of claim 2 , wherein the microwave plasma generators have large electrode gap, strong plasma activity, and wide volume range.

5. The gasifier of claim 3 , wherein a microwave power source of the microwave plasma generators has a basic frequency of 2.45 GHz, and a power of a single microwave plasma generator is within 200 kW.

6. The gasifier of claim 4 , wherein a microwave power source of the microwave plasma generators has a basic frequency of 2.45 GHz, and a power of a single microwave plasma generator is within 200 kW.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 6, 2016
From: WUHAN KAIDI GENERAL RESEARCH INSTITUTE OF ENGINEERING & TECHNOLOGY CO., LTD.
To: WUHAN KAIDI ENGINEERING TECHNOLOGY RESEARCH INSTITUTE CO., LTD.
Reel/Frame 040233/0691 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 24, 2014
From: CHEN, YILONG; ZHANG, YANFENG; XIA, MINGGUI; ZHANG, LIANG
To: WUHAN KAIDI GENERAL RESEARCH INSTITUTE OF ENGINEERING & TECHNOLOGY CO., LTD.
Reel/Frame 033171/0554 →
Priority Claims (1)
CN 2011 1 0449413 · Dec 29, 2011 · national
Continuity (2)
Continuation In Part PCTCN2012083562 · Oct 26, 2012
Related Publication 20140306160A1 · Oct 16, 2014