IP Library Granted Patent US 10,132,241
Granted Patent B2
US 10,132,241 · App. 14/320,795 · Granted Nov 20, 2018

Method of producing suspension for a structure in a turbojet engine using a hyperstatic trellis with pre-stressed link elements

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,132,241
App. No.
14/320,795
Granted
Nov 20, 2018
Kind
B2
Abstract

A method of manufacturing an assembly including a first structure which is arranged to be rigidly connected to a housing of a turbojet engine; a second annular structure surrounding the first structure; and a hyperstatic trellis of connecting rods which maintains the first structure relative to the second structure, is provided. The method includes mounting the connecting rods of the hyperstatic trellis between the structures; and pre-stressing at least one of the connecting rods to a pre-determined level, which is carried out before the mounting thereof between the structures.

Claims (38)

1. A method of manufacturing an assembly comprising a first structure arranged to be rigidly connected to a housing of a turbojet engine, a second annular structure surrounding the first structure, and a hyperstatic trellis comprising a plurality of connecting rods, the plurality of connecting rods maintaining the first structure relative to the second annular structure, said method comprising;

mounting said plurality of connecting rods of the hyperstatic trellis between said first structure and said second annular structure;

pre-stressing at least one of said plurality of connecting rods to a predetermined level; carried out before the mounting of said plurality of connecting rods between said first structure and said second annular structure, said pre-stressing corresponding to a slight lengthening of said at least one of said plurality of connecting rods thereby placing said at least one of said plurality of connecting rods in a pre-stressed state; and

maintaining the pre-stressed state of said at least one of said plurality of connecting rods during mounting of said at least one of said plurality of connecting rods between said first structure and said second annular structure.

2. The method of manufacturing an assembly according to claim 1 , wherein each of said plurality of connecting rods comprises a spindle, a first end, and a second end, each of the first end and the second end being connected to a corresponding first and second yoke, each yoke being suitable for fixing to one of said first structure and said second annular structure, said pre-stressing step comprising:

placing the yokes of said at least one of said plurality of connecting rods in jaws of a traction actuator;

applying the pre-stressing at said predetermined level to the yokes of at least one of said plurality of connecting rods by operating said traction actuator;

installing shells around the spindle of said at least one of said plurality of connecting rods and locking the shells to each other to maintain separation of the yokes while the traction actuator maintains the pre-stressing at said predetermined level; and

releasing the pre-stressing applied to the yokes of said at least one of said plurality of connecting rods by the traction actuator.

3. The method of manufacturing an assembly according to claim 2 , further comprising removing the shells after said at least one of said plurality of connecting rods is mounted,

wherein the removing the shells includes the shells from each other.

4. The method of manufacturing an assembly according to claim 2 , wherein the shells comprise at least one non-deformable element extending along the spindle over most of a length of the spindle.

5. The method of manufacturing an assembly according to claim 4 , fasteners retain the shells along the spindle in order to maintain the separation of the yokes.

6. The method of manufacturing an assembly according to claim 4 , wherein each of said first and second yokes have a larger cross-section than the spindle in at least one direction perpendicular to the spindle, and wherein each shell has at least two contact surfaces which are oriented outwards in opposite directions and suitable for resting on a face of each of said first and second yokes which is turned towards the spindle.

7. The method of manufacturing an assembly according to claim 4 , wherein fasteners apply pressure to the shells against the spindle, preventing said spindle from retracting by friction against the non-deformable element.

8. The method according to claim 2 , wherein each connecting rod of said plurality of connecting rods is profiled and slightly flattened about a plane perpendicular to a plane of each of said yokes.

9. The method according to claim 1 , wherein the plurality of connecting rods comprises three pairs of connecting rods which are tangential to the first structure and converging in the pairs on the second annular structure.

10. The method according to claim 1 , wherein said plurality of connecting rods is arranged in a triangular shape between the first structure and the second annular structure, said plurality of connecting rods being tangential to the first structure.

11. The method according to claim 1 , wherein predetermined level is determined by calculating the stresses in the plurality of connecting rods for an ultimate load situation.

12. The method according to claim 1 , wherein each connecting rod of the plurality of connecting rods has a solid cross-section.

13. The method of manufacturing an assembly according to claim 2 , wherein a maintaining device for maintaining the separation of the yokes of the spindle comprises shells which comprises non-deformable elements extending along the spindle over most of a length of the spindle.

14. The method of manufacturing an assemble according to claim 13 , wherein fasteners retain the shells along the spindle in order to maintain the separation of the yokes.

15. The method of manufacturing an assembly according to claim 13 , wherein said yokes have a larger cross-section than the spindle in at least one direction perpendicular to the spindle, and wherein each shell has at least two contact surfaces which are oriented outwards in opposite directions and suitable for resting on a face of each of said yokes which is turned towards the spindle.

16. The method of manufacturing an assembly according to claim 13 , wherein fasteners apply pressure to the shells against the spindle, preventing said spindle from retracting by friction against the at least one non-deformable element.

17. A method of manufacturing an assembly comprising a first structure arranged to be rigidly connected to a housing of a turbojet engine, a second annular structure surrounding the first structure, and a hyperstatic trellis comprising a plurality of connecting rods, the plurality of connecting rods maintaining the first structure relative to the second annular structure, said method comprising:

mounting said plurality of connecting rods of the hyperstatic trellis between said first structure and said second annular structure; and

pre-stressing at least one of said plurality of connecting rods to a predetermined level, carried out before the mounting of said plurality of connecting rods between said first structure and said second annular structure,

wherein each of said plurality of connecting rods comprises a spindle, a first end and a second end, each first end and second end being connected to a corresponding first and second yoke, each yoke being suitable for fixing to one of said first structure and said second annular structure,

wherein said pre-stressing comprises:

placing each of the first and second yokes of said at least one of said plurality of connecting rods in jaws of a traction actuator;

applying the pre-stressing at said predetermined level to the first and second yokes of said at least one of said plurality connecting rods by operating said traction actuator;

installing shells around the spindle of said at least one of said plurality of connecting rods and locking the shells to each other to maintain separation of the first and second yokes while the traction actuator maintains the pre-stressing at said predetermined level; and

releasing the pre-stressing applied to the first and second yokes of said at least one of said plurality of connecting rods by the traction actuator, and

wherein the method further comprises removing the shells after said at least one of said plurality of connecting rods is mounted.

18. A method of manufacturing an assembly comprising a first structure arranged to be rigidly connected to a housing of a turbojet engine, a second annular structure surrounding the first structure, and a hyperstatic trellis comprising a plurality of connecting rods, the plurality of connecting rods maintaining the first structure relative to the second annular structure, said method comprising:

mounting said plurality of connecting rods of the hyperstatic trellis between said first structure and said second annular structure;

pre-stressing at least one of said plurality of connecting rods to a predetermined level forming a lengthened state of the at least one of said plurality of connecting rods, carried out before the mounting of said plurality of connecting rods between said first structure and said second annular structure; and

releasing the pre-stressing of the said at least one of said plurality of connecting rods when all the plurality of connecting rods are installed.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE COVER SHEET TO REMOVE APPLICATION NOS. 10250419, 10786507, 10786409, 12416418, 12531115, 12996294, 12094637 12416422 PREVIOUSLY RECORDED ON REEL 046479 FRAME 0807. ASSIGNOR(S) HEREBY CONFIRMS THE CHANGE OF NAME. Recorded Aug 24, 2018
From: SNECMA
To: SAFRAN AIRCRAFT ENGINES
Reel/Frame 046939/0336 →
CHANGE OF NAME Recorded May 23, 2018
From: SNECMA
To: SAFRAN AIRCRAFT ENGINES
Reel/Frame 046479/0807 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 23, 2014
From: BELLABAL, FRANCOIS ROBERT; FLORENT, NICOLAS MARC
To: SNECMA
Reel/Frame 033370/0208 →