IP Library Granted Patent US 9,290,931
Granted Patent B2
US 9,290,931 · App. 14/324,275 · Granted Mar 22, 2016

Wall installation systems and methods

Inventor: Mark Grace (Alpharetta, GA)
Assignee: EMEH, INC.
E04B1/948E04F13/0896
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,290,931
App. No.
14/324,275
Granted
Mar 22, 2016
Kind
B2
Abstract

A wall installation system and method include providing a first wall panel with tape extending vertically from top to bottom on one side of the first wall panel and on a back of the first wall panel; securing the first wall panel at a site; placing a second wall panel adjacent to the first wall panel; and connecting the tape to the second wall panel to form a fire barrier seal between the first wall panel and the second wall panel.

Claims (27)

1. A wall installation method, comprising:

providing a first wall panel with tape extending vertically from top to bottom on one side of the first wall panel, wherein the tape is on a back of the first wall panel and a portion of the tape extends past the one side leaving an overlap for connection to a back side of a second wall panel;

securing the first wall panel at a site;

placing the second wall panel adjacent to the first wall panel; and

connecting the tape to the second wall panel to form a fire barrier seal between the first wall panel and the second wall panel,

wherein the tape comprises fire tape and about half of a width of the fire tape is affixed to the first wall panel and the overlap portion of the width of the fire tape comprises a peel off label that is removed prior to the placing of the second wall panel.

2. The wall installation method of claim 1 , further comprising:

attaching a coating to the first wall panel prior to providing the first wall panel at the site, the coating comprises a protective coating, a textured coating, or any architectural coating.

3. The wall installation method of claim 1 , further comprising:

painting the first wall panel prior to providing the first wall panel at the site.

4. The wall installation method of claim 1 , wherein the first wall panel and the second wall panel comprise drywall that is reverse installed with the tape on the back facing studs.

5. The wall installation method of claim 1 , further comprising:

inserting a trim between the first wall panel and the second wall panel at the fire barrier seal, wherein the trim does not extend to the tape.

6. The wall installation method of claim 1 , further comprising:

performing the wall installation method at a commercial location in a section of the site, wherein the commercial location remains open during the wall installation method.

7. The wall installation method of claim 1 , wherein the first wall panel and the second wall panel pass a fire test subsequent to the connecting.

8. The wall installation method of claim 1 , wherein the tape is attached to the first wall panel prior to arrival on-site and the connecting to the second wall panel is performed on-site.

9. The wall installation method of claim 1 , wherein, subsequent to the connecting, the first wall panel and the second wall panel form a fire barrier.

10. The wall installation method of claim 1 , further comprising:

installing at least one of a protection layer and a wall covering to the first wall panel and the second wall panel.

11. The wall installation method of claim 1 , wherein the installing is performed prior to the first wall panel and the second wall panel being on-site.

12. The wall installation method of claim 1 , further comprising:

securing the first wall panel at the site without putting holes in the first wall panel which penetrate the first wall panel creating a failure of a fire wall and require on-site mudding.

13. The wall installation method of claim 12 , further comprising:

securing the first wall panel at the site with “J” rails located at or near a ceiling and a floor.

14. The wall installation method of claim 12 , further comprising:

securing the first wall panel at the site with a “J” rail located at or near a ceiling and one or more attachment clamps.

Assignments (2)
SECURITY INTEREST Recorded Aug 11, 2021
From: EMEH, INC.; CONSTRUCTION SPECIALITIES, INC.
To: JPMORGAN CHASE BANK, N.A.
Reel/Frame 057143/0179 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 7, 2014
From: GRACE, MARK
To: EMEH, INC.
Reel/Frame 033247/0881 →
Continuity (1)
Related Publication 20160002916A1 · Jan 7, 2016