IP Library Granted Patent US 9,630,822
Granted Patent B2
US 9,630,822 · App. 14/333,272 · Granted Apr 25, 2017

Method of weighing a load lifted by a lifting arm of a machine

Inventors: Luke Francis Ellis (Uttoxeter, GB); Luciano Argentieri (Uttoxeter, GB); Richard Brooks (Uttoxeter, GB)
Assignee: J. C. Bamford Excavators Limited
B66F17/003B66F9/065G01G19/083
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,630,822
App. No.
14/333,272
Granted
Apr 25, 2017
Kind
B2
Abstract

A method of weighing a load lifted by a lifting arm of a machine is disclosed and includes receiving a signal from an axle sensor, said signal representing a force exerted on an axle as a result of lifting the load, receiving a further signal from a further sensor, said further signal representing an angle or slope of the lifting arm relative to a chassis of the machine, and calculating, from the received signal and the received further signal, the weight of the load lifted by the lifting arm.

Claims (28)

1. A method of weighing a load lifted by a lifting arm of a machine, the method comprising:

providing an axle sensor at an axle of the machine configured to sense a force exerted on an axle as a result of lifting the load;

providing a further sensor configured to sense an angle or slope of the lifting arm relative to a chassis of the machine;

providing a chassis sensor configured to sense an angle of a chassis relative to horizontal;

receiving in a processor an axle sensor signal from the axle sensor, said axle sensor signal representing the sensed force exerted on the axle as a result of lifting the load;

receiving in the processor a further signal from the further sensor, said further signal representing the angle or slope of the lifting arm relative to the chassis of the machine;

receiving in the processor a chassis signal from the chassis sensor, said chassis signal representing the angle of the chassis relative to the horizontal; and

calculating in the processor, from the received axle sensor signal, the received further signal, and the received chassis signal, the weight of the load lifted by the lifting arm.

2. A method as defined in claim 1 , wherein the lifting arm is an extendable lifting arm, the method further comprising receiving an arm signal from an arm sensor, the arm signal representing an extension of the lifting arm; and

calculating in the processor, from the arm signal, the weight of the load lifted by the machine.

3. A method as defined in claim 2 , wherein the arm signal represents a zero extension of the lifting arm.

4. A method as defined in claim 1 , including receiving a datum signal from the axle sensor and/or the further sensor whilst the machine is in a first orientation and prior to lifting the load; and

subsequently lifting the load, wherein the step of receiving said signal from said axle sensor and receiving said further signal from said further sensor are both carried out with the machine in a second orientation different from the first orientation and calculating, from the received signal, the received further signal and the datum signal the weight of the load lifted by the lifting arm.

5. A method as defined in claim 4 wherein with the machine in the first orientation the arm is at a first angle relative to the chassis and with the machine in the second orientation the arm is at a second angle relative to the chassis.

6. A method as defined in claim 4 wherein with the machine in the first orientation the chassis is at a first angle relative to the horizontal and with the machine in the second orientation the chassis is at a second angle relative to the horizontal.

7. A method as defined in claim 4 wherein with the machine in the first orientation the arm is at a first extension and with the machine in a second orientation the arm is at a second extension.

8. A method of weighing a load lifted by a lifting arm of a machine, the machine having a plurality of wheels each engaged with the ground, the method comprising:

equipping the plurality of wheels with corresponding first sensors, each first sensor configured to measure a force exerted on the wheels associated with the first sensor;

equipping the machine with a chassis sensor configured to sense an angle of a chassis relative to the horizontal;

receiving in a processor a signal from each first sensor, each signal of each first sensor representing the force exerted on the wheels associated with the first sensor as a result of lifting the load;

receiving in the processor a chassis signal from the chassis sensor, said chassis signal representing the angle of the chassis relative to the horizontal; and

calculating in the processor, from the received chassis signal and from the first sensors, the weight of the load lifted by the lifting arm.

9. A method as defined in claim 8 , wherein the plurality of wheels includes first and second front wheels and first and second rear wheels, the machine further including a one of the first sensors associated with the first and second rear wheels.

10. A method as defined in claim 9 , wherein the first and second rear wheels are mounted on a rear axle, said rear axle being pivotally mounted to a chassis of the machine said one of the first sensors being mounted on said rear axle.

11. A method as defined in claim 9 , wherein the first and second front wheels are mounted on a front axle, said front axle being non-movably fixed relative to a chassis of the machine; and

a second one of the first sensors being mounted on the front axle proximate the first front wheel and a third one of the first sensors being mounted on the front axle proximate the second front wheel.

12. A method as defined in claim 9 , wherein the first and second front wheels are mounted on a front axle, said front axle being selectively non-movably fixed relative to a chassis of the machine; and

a second one of the first sensors being mounted on the front axle proximate the first front wheel and a third one of the first sensors being mounted on the front axle proximate the second front wheel.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 20, 2015
From: ELLIS, LUKE FRANCIS; ARGENTIERI, LUCIANO; BROOKS, RICHARD
To: J.C. BAMFORD EXCAVATORS LIMITED
Reel/Frame 035450/0781 →
Priority Claims (1)
GB 1313376.4 · Jul 26, 2013 · national
Continuity (1)
Related Publication 20150027789A1 · Jan 29, 2015