IP Library Granted Patent US 9,453,428
Granted Patent B2
US 9,453,428 · App. 14/341,113 · Granted Sep 27, 2016

Water/steam cycle and method for operating the same

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,453,428
App. No.
14/341,113
Granted
Sep 27, 2016
Kind
B2
Abstract

A water/steam cycle includes a steam generator, a steam turbine, a water cooled condenser and a feedwater pump. The condenser includes within a condenser shell at least one tube bundle with an internal air cooler, which is connected to an external ejector/vacuum pump by means of a suction line. In order to reduce the condenser evacuation time at the start-up of the water/steam cycle without using auxiliary steam, an additional evacuation line with a motorized isolating valve connects the external ejector/vacuum pump with the condenser shell. The action of the isolating valve is controlled by means of a control.

Claims (6)

1. Water/steam cycle comprising a steam generator, a steam turbine, a water cooled condenser and a feedwater pump, whereby the condenser comprises within a condenser shell at least one tube bundle with an internal air cooler, which is connected to an external ejector/vacuum pump by means of a suction line, and for reducing the condenser evacuation time at the start-up of the water/steam cycle without using auxiliary steam, an additional evacuation line connects the external ejector/vacuum pump with the condenser shell, and an isolating valve is provided within the additional evacuation line to stop flow through said line during normal operation, wherein said isolating valve is motorized and controlled by means of a control.

2. Water/steam cycle according to the claim 1 , wherein the additional evacuation line is connected to the suction line near the ejector/vacuum pump.

3. Method for operating a water/steam cycle according to claim 1 , comprising:

a) at a start-up of the water/steam cycle evacuating the condenser by means of the ejector/vacuum pump at least through the additional evacuation line;

b) stopping the flow through the additional evacuation line by closing an isolating valve within said additional evacuation line, wherein the isolating valve is motorized and the action of the isolating valve is controlled by means of control; and

c) commencing normal operation of the water/steam cycle.

Assignments (2)
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 19, 2014
From: LENHERR, HANS-ULRICH
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 033559/0839 →