IP Library Granted Patent US 9,682,633
Granted Patent B2
US 9,682,633 · App. 14/350,900 · Granted Jun 20, 2017

Charge control device, battery management device, charge control method, and record medium

Inventors: Hitoshi Yano (Tokyo, JP); Koji Kudo (Tokyo, JP)
Assignee: NEC Corporation
B60L11/1848B60L3/12B60L11/184B60L11/1816B60L11/1824B60L11/1838B60L11/1842B60L11/1844B60L11/1846B60L11/1862H02J3/14H02J3/383H02J7/0027B60L2200/26B60L2240/545B60L2240/547B60L2240/549B60L2240/72B60L2260/54H01M10/44Y02E10/563Y02E60/721Y02T10/705Y02T10/7005Y02T10/7044Y02T10/7055Y02T10/7072Y02T10/7291Y02T90/121Y02T90/128Y02T90/14Y02T90/163Y02T90/168Y02T90/169Y04S10/126Y04S30/12Y04S30/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,682,633
App. No.
14/350,900
Granted
Jun 20, 2017
Kind
B2
Abstract

A charge-control device that controls charging of vehicles, which use electric power as a drive source, using electric power from an electric power grid includes storage means storing a first period in a charge control period for which the charging is controlled; a second period other than the first period in the charge control period; and a target level of a charge demand in the first period; receipt means receiving from each of the vehicles the required charge amount; and control means controlling the charging using the target level of the charge demand in the first period, setting up a target level of charging in the second period based on a remaining total amount generated by subtracting the charge amount in the first period from a total amount of the plurality of required charge amounts to control the charging using the target level of the charging.

Claims (22)

1. A charge control device that controls charging of a plurality of vehicles, which use electric power as a drive source, using electric power from an electric power grid, comprising:

a storage unit that stores a first period in a charge control period for which the charging is controlled; a second period other than the first period in the charge control period; and a target level of a charge demand in the first period;

a receipt unit that receives from each of the plurality of vehicles a required charge amount;

a control unit that controls the charging using as a target the target level of the charge demand in the first period, sets up a target level of charging in the second period based on a remaining total amount that is generated by subtracting the charge amount in the first period from a total amount of the plurality of required charge amounts, and controls the charging using as a target the target level of the charging, and

an assignment unit that assigns charge priorities to the plurality of vehicles based on a predetermined condition comprising a factor calculated by the formula [Required charge amount/(Remaining charge time×Charge electric power)], wherein the assignment unit assigns a higher charge priority to a vehicle having a larger factor.

2. The charge control device as set forth in claim 1 ,

wherein the receipt unit further receives from each of the plurality of vehicles an expected connection period for which the vehicle is expected to be connected to the electric power grid, and

wherein the control unit sets up a charge schedule for which each of the plurality of vehicles is charged with the remaining total amount within the expected connection period in the second period and sets up the target level of the charging based on the charge schedule.

3. The charge control device as set forth in claim 2 ,

wherein the control unit sets up the charge schedule such that each of the plurality of vehicles is charged with the remaining total amount within the expected connection period in the second period and such that charge fluctuations become small in the second period.

4. The charge control device as set forth in claim 1 , wherein the control unit selects vehicles expected to be charged from the plurality of vehicles in the order of the higher charge priorities based on the target level of the charge demand, charges the selected vehicles expected to be charged in the first period, selects the vehicles expected to be charged in the order of the higher charge priorities in the second period based on the target level of the charging, and charges the selected vehicles expected to be charged in the second period.

5. The charge control device as set forth in claim 1 , wherein the control unit calculates a difference between the target level of the charge demand and the achieved charge electric power in the first period and calculates a fare corresponding to the difference.

6. A charge control method for a charge control device that controls charging of a plurality of vehicles, which use electric power as a drive source, using electric power from an electric power grid, comprising:

storing into a storage unit a first period in a charge control period for which the charging is controlled; a second period other than the first period in the charge control period; and a target level of a charge demand in the first period;

receiving from each of the plurality of vehicles a required charge amount; and

controlling the charging using as a target the target level of the charge demand in the first period, setting up a target level of charging in the second period based on a remaining total amount that is generated by subtracting the charge amount in the first period from a total amount of the plurality of required charge amounts, and controlling the charging using as a target the target level of the charging

assigning charge priorities to the plurality of vehicles based on a predetermined condition comprising a factor calculated by the formula [Required charge amount/(Remaining charge time×Charge electric power)], wherein a higher charge priority is assigned to a vehicle having a larger factor.

7. A non-transitory computer readable record medium on which a program that causes a computer to execute procedures is recorded, the procedures comprising:

a storage procedure that stores into a storage unit a first period in a charge control period for which charging of a plurality of vehicles which use electric power as a drive source using electric power from an electric power grid is controlled; a second period other than the first period in the charge control period; and a target level of a charge demand in the first period;

a receipt procedure that receives from each of the plurality of vehicles a required charge amount;

a control procedure that controls the charging using as a target the target level of the charge demand in the first period, sets up a target level of charging in the second period based on a remaining total amount that is generated by subtracting the charge amount of the charging in the first period from a total amount of the plurality of required charge amounts, and controls the charging using as a target the target level of the charging;

an assignment procedure that assigns charge priorities to the plurality of vehicles based on a predetermined condition comprising a factor calculated by the formula [Required charge amount/(Remaining charge time×Charge electric power)], wherein the assignment procedure assigns a higher charge priority to a vehicle having a larger factor.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 10, 2014
From: YANO, HITOSHI; KUDO, KOJI
To: NEC CORPORATION
Reel/Frame 032646/0498 →
Priority Claims (1)
JP 2011-240341 · Nov 1, 2011 · national
Continuity (1)
Related Publication 20140253037A1 · Sep 11, 2014