IP Library Granted Patent US 9,308,561
Granted Patent B2
US 9,308,561 · App. 14/353,035 · Granted Apr 12, 2016

Method of producing seamless metal pipe

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,308,561
App. No.
14/353,035
Granted
Apr 12, 2016
Kind
B2
Abstract

A method of producing a seamless metal pipe, which can suppress the occurrence of lamination defects, is provided. A method of producing a seamless metal pipe according to an embodiment of the present invention includes the steps of: heating a high alloy containing, by mass %, Cr: 20 to 30% and Ni: more than 22% and not more than 60% in a first heating furnace (S2); piercing-rolling the high alloy heated in the first heating furnace with a first piercing machine to produce a hollow shell (S3); heating the hollow shell in a second heating furnace (S4); and elongation-rolling the hollow shell heated in the second heating furnace with the first piercing machine or a second piercing machine which is different from the first piercing machine (S5).

Claims (19)

1. A method of producing a seamless metal pipe comprising the steps of:

heating a high alloy billet containing, by mass %, Cr: 20 to 30% and Ni: more than 22% and not more than 60% in a first heating furnace;

piercing-rolling the high alloy billet heated in the first heating furnace with a first piercing machine to produce a hollow shell, the first piercing machine including a pair of skew rolls and a plug;

heating the hollow shell in a second heating furnace immediately after piercing-rolling; and

elongation-rolling the hollow shell heated in the second heating furnace with the first piercing machine or a second piercing machine which is different from the first piercing machine and includes a pair of skew rolls and a plug.

2. The method of producing a seamless metal pipe according to claim 1 , wherein

in the step of heating the hollow shell in the second heating furnace, the hollow shell whose outer surface temperature is not less than 1000° C. is charged into the second heating furnace.

3. The method of producing a seamless metal pipe according to claim 2 , wherein

in the step of heating the hollow shell in the second heating furnace, the heating time is not less than 300 seconds.

4. The method of producing a seamless metal pipe according to claim 2 , wherein

in the step of piercing-rolling, a piercing ratio defined by Formula (1) is from 1.1 to not more than 2.0; and in the step of elongation-rolling, an elongation ratio defined by Formula (2) is from 1.05 to not more than 2.0, and a total elongation ratio defined by Formula (3) is more than 2.0:

piercing ratio=hollow shell length after piercing-rolling/billet length before piercing-rolling  (1)

elongation ratio=hollow shell length after elongation-rolling/hollow shell length before elongation-rolling  (2)

total elongation ratio=hollow shell length after elongation-rolling/billet length before piercing-rolling  (3).

5. The method of producing a seamless metal pipe according to claim 1 , wherein

in the step of piercing-rolling, a piercing ratio defined by Formula (1) is from 1.1 to not more than 2.0; and in the step of elongation-rolling, an elongation ratio defined by Formula (2) is from 1.05 to not more than 2.0, and a total elongation ratio defined by Formula (3) is more than 2.0:

piercing ratio=hollow shell length after piercing-rolling/billet length before piercing-rolling  (1)

elongation ratio=hollow shell length after elongation-rolling/hollow shell length before elongation-rolling  (2)

total elongation ratio=hollow shell length after elongation-rolling/billet length before piercing-rolling  (3).

Assignments (2)
CHANGE OF NAME Recorded May 14, 2019
From: NIPPON STEEL & SUMITOMO METAL CORPORATION
To: NIPPON STEEL CORPORATION
Reel/Frame 049257/0828 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 21, 2014
From: YAMANE, KOUJI; YAMAKAWA, TOMIO; SHIMODA, KAZUHIRO
To: NIPPON STEEL & SUMITOMO METAL CORPORATION
Reel/Frame 032714/0228 →