IP Library Granted Patent US 9,221,087
Granted Patent B2
US 9,221,087 · App. 14/353,038 · Granted Dec 29, 2015

Method of producing seamless metal pipe

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,221,087
App. No.
14/353,038
Granted
Dec 29, 2015
Kind
B2
Abstract

A method of producing a seamless metal pipe, which can suppress the occurrence of inner surface flaws, is provided. A method of producing a seamless metal pipe according to an embodiment of the present invention includes the steps of: heating a high alloy billet BL containing, by mass %, Cr: 20 to 30% and Ni: more than 22% and not more than 60% in a heating furnace F 1 (S 2 ); piercing-rolling the high alloy billet BL heated in the heating furnace F 1 with a piercing machine P 1 to produce a hollow shell (S 3 ); cooling the hollow shell and then reheating the hollow shell in the heating furnace F 1 (S 4 ); and elongation-rolling the heated hollow shell with the piercing machine P 1 (S 5 ).

Claims (17)

1. A method of producing a seamless metal pipe comprising the steps of:

heating a high alloy billet containing, by mass %, Cr: 20 to 30% and Ni: more than 22% and not more than 60% in a heating furnace;

piercing-rolling the heated high alloy billet with a piercing machine to produce a hollow shell, the piercing machine including a pair of skew rolls and a plug;

cooling the hollow shell after piercing rolling and then reheating the hollow shell in the heating furnace used for heating the high alloy billet; and

elongation-rolling the heated hollow shell with the piercing machine used for piercing-rolling the heated high alloy billet.

2. The method of producing a seamless metal pipe according to claim 1 , wherein

in the step of piercing-rolling, a piercing ratio defined by Formula (1) is from 1.1 to not more than 2.0; and in the step of elongation-rolling, an elongation ratio defined by Formula (2) is from 1.05 to not more than 2.0, and a total elongation ratio defined by Formula (3) is more than 2.0:

piercing ratio=hollow shell length after piercing-rolling / billet length before piercing-rolling  (1)

elongation ratio=hollow shell length after elongation-rolling/hollow shell length before elongation-rolling  (2)

total elongation ratio=hollow shell length after elongation-rolling/billet length before piercing-rolling  (3).

3. The method of producing a seamless metal pipe according to claim 1 , wherein

in the step of heating the hollow shell, the hollow shell which has been cooled to not more than 900° C. in the outer surface temperature is heated.

4. The method of producing a seamless metal pipe according to claim 3 , wherein

in the step of piercing-rolling, a piercing ratio defined by Formula (1) is from 1.1 to not more than 2.0; and in the step of elongation-rolling, an elongation ratio defined by Formula (2) is from 1.05 to not more than 2.0, and a total elongation ratio defined by Formula (3) is more than 2.0:

piercing ratio=hollow shell length after piercing-rolling/billet length before piercing-rolling  (1)

elongation ratio=hollow shell length after elongation-rolling / hollow shell length before elongation-rolling  (2)

total elongation ratio=hollow shell length after elongation-rolling/billet length before piercing-rolling  (3).

Assignments (2)
CHANGE OF NAME Recorded May 14, 2019
From: NIPPON STEEL & SUMITOMO METAL CORPORATION
To: NIPPON STEEL CORPORATION
Reel/Frame 049257/0828 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 21, 2014
From: YAMANE, KOUJI; YAMAKAWA, TOMIO; SHIMODA, KAZUHIRO
To: NIPPON STEEL & SUMITOMO METAL CORPORATION
Reel/Frame 032714/0471 →