IP Library Granted Patent US 9,920,234
Granted Patent B2
US 9,920,234 · App. 14/372,990 · Granted Mar 20, 2018

Sealing fluid for setting a packer

Inventors: Edo Boekholtz (Copenhagen K, DK); Hans Van Dongen (Copenhagen K, DK)
Assignee: MAERSK OLIE OG GAS A/S
C09K8/44C09K8/508E21B33/10E21B33/12E21B33/13E21B33/134
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,920,234
App. No.
14/372,990
Granted
Mar 20, 2018
Kind
B2
Abstract

A method and a sealing fluid for setting a packer in an annulus between a well bore and a well tubular is provided, which by adjusting i.a. the density, viscosity and setting time of the sealing fluid is able to provide among other things a full radial seal with an acceptable axial dispersion, in particular in highly deviated wells and/or in wells having eccentric annuli.

Claims (31)

1. A method for preparing a sealing fluid for setting a packer in an annulus experiencing an active cross flow from 1 to 20 barrels-per-day containing a fluid in form of formation fluid, fresh water, sea water or other water containing salts having a density between 0.8-1.3 g/cm 3 and a temperature between 20-100° C. in a well bore comprising:

determining an exact density and temperature of the fluid contained in the annulus,

providing a hardenable composition comprising monomer and/or oligomer units of an epoxy to be polymerized through use of a hardener and/or catalyst able to be tailored to properties, as the sealing fluid,

determining density, viscosity and setting time of the hardenable composition,

adding a material having a lower or a higher density than the sealing fluid and comprising glass bubbles additive or polymers, thereby adjusting the density of the sealing fluid to the density of the fluid in the annulus within ±5% at the temperature of the fluid in the annulus,

adding a viscosity modifying additive comprising silica additive or nanoclay additive, thereby adjusting the initially mixed viscosity of the sealing fluid to between 1000 cP to 130000 cP at the temperature of the fluid in the annulus, and

adding a hardener and/or a catalyst, thereby adjusting the setting time to between 2-30 minutes at the temperature of the fluid in the annulus,

wherein adjusting of the density, viscosity, and setting time results in a sealing fluid that resists crossflow fluid conditions experienced within the annulus.

2. The method according to claim 1 , wherein the wellbore has a deviation angle from vertical from 65° to 90°.

3. The method according to claim 1 , wherein the sealing fluid is substantially immiscible with the fluid in the annulus.

4. The method according to claim 1 , wherein the density of the fluid in the annulus is between 0.9 g/cm 3 and 1.1 g/cm 3 .

5. The method according to claim 1 , wherein the temperature of the fluid in the annulus is between 40° C. and 90° C.

6. A method for setting a packer in an annulus between a well bore and a well tubular, and wherein the annulus has an active crossflow from 1 to 20 barrels-per-day, comprising:

a) providing a tool suitable for dispensing a sealing fluid;

b) injecting a batch of the sealing fluid into the annulus through a first hole in the well tubular at a desired spot;

wherein the sealing fluid is prepared according to claim 1 .

7. The method according to claim 6 , wherein each batch of sealing fluid injected is between 5 and 30 l (liters).

8. The method according to claim 6 , further comprising:

c) allowing the already injected sealing fluid to set;

d) moving the tool in the well tubular, from the previous hole, upstream of the crossflow;

e) making an additional hole in the well tubular;

f) injecting another batch of the sealing fluid into the annulus through the additional hole in the well tubular.

9. The method according to claim 8 , wherein steps c) to f) are repeated one, two or three times.

10. The method according to claim 8 , wherein the distance (L) between two injection holes are 1-3 meters.

11. The method according to claim 8 , wherein the additional hole in the well tubular is located between 90° and 180° from the previous hole.

12. The method according to claim 11 , wherein steps c) to f) are repeated one, two or three times.

13. The method according to claim 11 , wherein the distance (L) between two injection holes are 1-3 meters.

14. A method for setting a packer in an annulus between a well bore and a well tubular, and wherein the annulus has an active crossflow from 1 to 20 barrels-per-day, comprising:

a) providing a tool suitable for dispensing a sealing fluid;

b) injecting a batch of the sealing fluid into the annulus through a first hole in the well tubular at a desired spot;

wherein the sealing fluid is prepared according to claim 2 .

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 8, 2017
From: BOEKHOLTZ, EDO; VAN DONGEN, HANS
To: MAERSK OLIE OG GAS A/S
Reel/Frame 043533/0612 →
Priority Claims (1)
EP 12151493 · Jan 18, 2012 · regional
Continuity (1)
Related Publication 20150021028A1 · Jan 22, 2015