IP Library Granted Patent US 9,739,265
Granted Patent B2
US 9,739,265 · App. 14/377,116 · Granted Aug 22, 2017

Method of operating a wind turbine

Inventor: Jaume Betran Palomas (Sant Cugat del Vallès, ES)
Assignee: ALSTOM Renewable Technologies
F03D7/0224F03D7/0232F05B2260/76F05B2270/32F05B2270/322F05B2270/328F05B2270/331F05B2270/335F05B2270/404F05B2270/8042Y02E10/723
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,739,265
App. No.
14/377,116
Granted
Aug 22, 2017
Kind
B2
Abstract

Method of operating a wind turbine comprising a plurality of blades rotatable along their longitudinal axes using a pitch mechanism, and comprising one or more movable trailing edge surfaces. The method includes predicting, at a first moment in time, a high load for one or more of the blades at a second moment in time. The method further comprises actuating on one or more of the movable trailing edge surfaces of these blades such that the trailing edge surfaces have a wider range of control to counteract the predicted high loads before the second moment in time, and simultaneously pitching the blades such as not to negatively affect the operation of the wind turbine. The method furthermore comprises, at the second moment in time, actuating the one or more movable trailing edge surfaces of the at least one or more blades to counteract the high loads.

Claims (35)

1. A method of operating a wind turbine comprising a plurality of blades, each of the blades being rotatable along its longitudinal axis using a pitch mechanism, and each of the blades comprising one or more movable trailing edge surfaces, the method comprising:

at a first moment in time predicting that a first of the blades will experience a high load at a later second moment in time,

before the second moment in time, actuating one or more of the movable trailing edge surfaces of the first blade such that the trailing edge surfaces of the first blade are moved from an initial position to a modified position that will provide a wider range of control to counteract the first high load at the second moment in time, and simultaneously pitching the first blade to a position to at least partially compensate for lift changes induced in the first blade by movement of the trailing edge surfaces to the modified position, and

at the second moment in time, actuating the one or more movable trailing edge surfaces of the first blade from the modified position to a final position to counteract the first high load.

2. The method according to claim 1 , wherein the pitching the first blade comprises pitching the first blade to a position such that a generation of electrical power by the wind turbine is not negatively affected by the modified position of the trailing edge surfaces.

3. The method according to claim 1 , wherein the pitching the first blade comprises pitching the first blade to a position such that loads on the first blade remain substantially at the same level as at the first moment in time with the trailing edge surfaces at them modified position.

4. The method according to claim 1 , wherein the predicting a high load for the first blade comprises using a LIDAR.

5. The method according to claim 1 , wherein the predicting a high load for the first blade comprises measuring loads in the wind turbine.

6. The method according to claim 1 , wherein the trailing edge surfaces of each of the blades comprises one or more flaps.

7. The method according to claim 6 , wherein each of the blades comprises a plurality of the flaps distributed along the length of the blade, and wherein each of these flaps is adapted to be actuated individually.

8. The method according to claim 1 ,

wherein one or more of the movable trailing edge surfaces of the first blade are moved substantially towards their most negative position at the modified position, in which the lift of the first blade is most reduced, and

the first blade is pitched such as to increase its angle of attack.

9. The method according to claim 1 , wherein the wind turbine comprises an individual pitch system for each of the blades, such that each of the blades can be pitched individually.

10. The method according to claim 1 , wherein the predicting a high load for a first blade at a second moment comprises measuring loads in another wind turbine.

11. The method according to claim 1 , wherein one or more of the movable trailing edge surfaces of the first blade are moved substantially towards their most positive position at the modified position, in which the lift of the first blade is most increased, and

pitching the first blade such as to decrease its angle of attack.

12. A method of operating a wind turbine comprising a plurality of blades, each of the blades being rotatable along its longitudinal axis using a pitch mechanism, and each of the blades comprising one or more movable trailing edge surfaces, the method comprising:

at a first moment in time predicting that a first blade will experience a first high load at a second later moment in time, and predicting that a second blade will experience a second high load at a third moment time later than the second moment in time,

before the second moment in time, actuating on one or more of the movable trailing edge surfaces of the first blade from an initial position such that they assume a modified position that will provide a wider range of control to counteract the first blade high load at the second moment in time,

before the third moment in time, actuating on one or more of the movable trailing edge surfaces of the second blade from an initial position such that they assume a modified position that will provide a wider range of control to counteract the second blade high load at the third moment in time,

before the second moment in time, pitching the first and second blades of the wind turbine to a respective position to at least partially compensate for lift changes induced in the first and second blades by movement of the respective trailing edge surfaces to the modified position,

at the second moment in time, actuating the one or more movable trailing edge surfaces of the first blade from the modified position to a final position to counteract the first blade high load, and

at the third moment in time, actuating the one or more movable trailing edge surfaces of the second blade from the modified position to a final position to counteract the second blade high load.

13. The method according to claim 12 , comprising

pitching the first and second blades to a position such that a generation of electrical power by the wind turbine is substantially not negatively affected by the modified position of the respective trailing edge surfaces.

14. The method according to claim 12 , comprising

pitching the first blade to position such that loads on the first blade remain substantially at the same level as at the first moment in time with the respective trailing edge surfaces at the modified position, and

pitching the second blade to a position such that loads on the second blade remain substantially at the same level as at the first moment in time with the respective trailing edge surfaces at the modified position.

15. The method according to claim 14 ,

wherein one or more of the movable trailing edge surfaces of the first blade are moved towards a substantially neutral position at the modified position.

16. The method according to claim 15 , wherein the first blade is pitched such as to increase the angle of attack of the first blade.

17. The method according to claim 15 , wherein pitching the first blade is pitched such as to decrease the angle of attack of the first blade.

18. The method according to claim 14 , wherein the predicting a first high load for a first blade at a second moment in time, and the predicting a second high load for a second blade at a third moment in time comprises predicting the same high load for the first and second blades.

19. The method according to claim 14 , wherein the predicting a high load for a first blade at a second moment in time, and the predicting a high load for a second blade at a third moment time comprises measuring loads in the wind turbine.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 4, 2017
From: GE RENEWABLE TECHNOLOGIES
To: GE RENEWABLE TECHNOLOGIES WIND B.V.
Reel/Frame 044117/0056 →
CHANGE OF NAME Recorded Sep 2, 2017
From: ALSTOM RENEWABLE TECHNOLOGIES
To: GE RENEWABLE TECHNOLOGIES
Reel/Frame 043749/0761 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 19, 2014
From: BETRAN PALOMAS, JAUME
To: ALSTOM RENEWABLE TECHNOLOGIES
Reel/Frame 033567/0947 →
Priority Claims (1)
EP 12382077 · Mar 1, 2012 · regional
Continuity (2)
Provisional Application 61640818 · May 1, 2012
Related Publication 20150030449A1 · Jan 29, 2015