IP Library Patent Application 14407395
Patent Application
App. No. 14/407,395

HYBRID AIRCRAFT

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
14/407,395
Abstract

The invention relates to a hybrid aircraft (F). According to the invention, a suitable position for mounting an energy generation unit ( 14 ) in the aircraft is identified, said energy generation unit comprising an internal combustion engine ( 34 ) and an electric generator ( 30 ) that is coupled thereto via a shaft. Independently of the position of the energy generation unit ( 14 ), a position is also identified for a thrust generation unit ( 12 ) comprising an electric motor ( 24 ) and a propeller ( 20 ) that is coupled thereto via a shaft ( 22 ). When the aircraft (F) is built, the thrust generation unit ( 12 ) and the energy generation unit ( 14 ) are disposed in the positions identified therefor. The generator ( 30 ) is then coupled to the electric motor ( 24 ) via an electric transmission device ( 16 ).

Claims (14)

1 .- 10 . (canceled)

11 . A motor-driven, fixed-wing aircraft, comprising:

a thrust creation unit including an electric motor, a propeller, and a shaft to couple the propeller to the electric motor;

an energy generation unit spaced from the thrust creation unit by a distance of at least 0.5 m and including an internal combustion engine having a maximum possible power output which is less than the thrust power needed during a take-off of the aircraft, an electric generator, and a shaft to couple the electric generator to the internal combustion engine, said shaft of the energy generation unit being rotatable about an axis of rotation and extending transversely to a specified flight direction of the aircraft, said internal combustion engine being defined by a consumption-optimized operation which lies at a power output of the internal combustion engine in a range of 100% to 130% of a specified cruising power of the aircraft, wherein the aircraft is designed to assist the energy generation unit during takeoff of the aircraft so as to provide thrust needed during takeoff;

an electric transmission device configured to transmit electric energy from the energy generation unit to the thrust creation unit;

at least one energy supply device configured to supply the thrust creation device with additional electric energy and including a battery or a fuel cell; and

a sound conducting device configured to emit sound created by the energy generation unit upwards away from the aircraft and including a channel for directing the sound upwards.

12 . The aircraft of claim 11 , constructed to define an overall center of gravity arranged between a center of gravity of the energy generation unit and a center of gravity of the thrust creation unit.

13 . The aircraft of claim 11 , wherein the electric transmission device includes a DC link circuit, said energy generation unit including a rectifier configured to couple the DC link circuit to the electric generator of the energy generation unit.

14 . The aircraft of claim 11 , further comprising an aircraft fuselage, and a converter arranged in the aircraft fuselage and configured to operate the electric motor of the thrust creation unit.

15 . The aircraft of claim 11 , further comprising wings and a tailplane assembly, said thrust creation unit being arranged between the wings and the tailplane assembly.

16 . The aircraft of claim 11 , further comprising a further thrust creation unit coupled electrically via the transmission device to the energy generation unit.

17 . The aircraft of claim 11 , wherein the propeller is a free-running propeller or a ducted propeller.

18 . The aircraft of claim 11 , wherein the electric motor of the thrust creation unit is coupled via a gearing to the propeller and/or the internal combustion engine of the energy generation unit is coupled via a gearing to the electric generator.

Assignments (2)
CONFIRMATORY DEED OF ASSIGNMENT EFFECTIVE SEPTEMBER 20, 2019 Recorded Apr 27, 2020
From: SIEMENS AG
To: ROLLS-ROYCE DEUTSCHLAND LTD & CO KG
Reel/Frame 052503/0284 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 2, 2015
From: ANTON, FRANK; GEDIGA, SWEN; WOLLENBERG, JOHANNES
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 035323/0756 →