IP Library Granted Patent US 9,789,437
Granted Patent B2
US 9,789,437 · App. 14/411,330 · Granted Oct 17, 2017

CO2 recovery device and CO2 recovery method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,789,437
App. No.
14/411,330
Granted
Oct 17, 2017
Kind
B2
Abstract

A CO 2 recovery device is provided with a CO 2 absorption tower and an absorption-solution regeneration tower. The CO 2 absorption tower includes: a CO 2 absorption section in which CO 2 -containing flue gas is brought into contact with a CO 2 absorption solution, namely a basic-amine-compound absorption solution, so as to remove CO 2 from the CO 2 -containing flue gas; and a water-washing section in which decarbonated flue gas from which CO 2 has been removed is brought into contact with washing water so as to remove accompanying substances accompanying the decarbonated flue gas. The absorption-solution regeneration tower regenerates the CO 2 absorption solution that has absorbed CO 2 . This CO 2 recovery device, in which a lean solution from which CO 2 has been removed is reused in the CO 2 absorption tower, has an aldehyde-removing agent supply unit that supplies a sulfite-compound aldehyde removing agent to a circulating washing-water line that circulates the washing water to the water-washing section.

Claims (10)

1. A CO 2 recovery method in which a CO 2 absorption tower and an absorption-solution regeneration tower are used to reuse a lean solution, from which CO 2 has been removed in the absorption-solution regeneration tower, in the CO 2 absorption tower,

the CO 2 absorption tower bringing CO 2 -containing flue gas into contact with a basic amine compound so as to remove CO 2 ,

the absorption-solution regeneration tower separating CO 2 from the CO 2 -absorbed basic amine compound to regenerate a CO 2 absorption solution, and

the method comprising:

supplying an aldehyde-compound removing agent to washing water while washing decarbonated flue gas with the washing water in a water-washing section to simultaneously remove basic amine compounds and aldehyde compounds; and

supplying an acid to the washing water to control pH thereof to be on an acidic side;

wherein, on an upstream side of the CO 2 absorption tower, flue gas containing CO 2 , a nitrogen oxide, and a sulfur oxide is brought into contact with alkali-added cooling water to cool the flue gas, and, after the contact, the alkali-added cooling water is used as circulating water of the water-washing section.

2. The CO 2 recovery method according to claim 1 ,

wherein plural stages of water-washing sections are provided, and

the aldehyde-compound removing agent is supplied to a top water-washing section of the CO 2 absorption tower.

Assignments (4)
CHANGE OF NAME Recorded Dec 14, 2023
From: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
To: MHI ENGINEERING, LTD.
Reel/Frame 066014/0774 →
NUNC PRO TUNC ASSIGNMENT Recorded Dec 14, 2023
From: MHI ENGINEERING, LTD.
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 066014/0870 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 26, 2018
From: MITSUBISHI HEAVY INDUSTRIES, LTD.
To: MITSUBISHI HEAVY INDUSTRIES ENGINEERING LTD.
Reel/Frame 046633/0906 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 24, 2014
From: TANAKA, HIROSHI; NAGAYASU, HIROMITSU; HIRATA, TAKUYA; OISHI, TSUYOSHI; KAMIJO, TAKASHI
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 034585/0009 →