IP Library Granted Patent US 9,248,399
Granted Patent B2
US 9,248,399 · App. 14/413,770 · Granted Feb 2, 2016

CO

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,248,399
App. No.
14/413,770
Granted
Feb 2, 2016
Kind
B2
Abstract

Provided is a CO 2 recovery system including: a high-pressure absorption tower; a high-pressure regeneration tower that partially regenerates a CO 2 absorption solution from the absorption tower through a first liquid feed line; a second liquid feed line that extracts a semi-lean solution having a heat resistance temperature thereof or lower from the high-pressure regeneration tower and introduces a portion of the semi-lean solution into a middle stage of the high-pressure absorption tower; a branch line that introduces a rest of the semi-lean solution into a flash drum; a third liquid feed line that introduces a lean solution after adding pressure thereto into a top of the high-pressure absorption tower; a high-pressure CO 2 compression device where high-pressure CO 2 gas from the high-pressure regeneration tower is introduced; and a low-pressure CO 2 compression device where low-pressure CO 2 from the flash drum is introduced.

Claims (11)

1. A CO 2 recovery system comprising:

a high-pressure absorption tower that brings high-pressure gas containing CO 2 into contact with a CO 2 absorption solution to remove CO 2 from the high-pressure gas;

a high-pressure regeneration tower that liberates a portion of CO 2 from a CO 2 -absorbed high-pressure rich solution, which has been introduced from the high-pressure absorption tower through a first liquid feed line, and partially regenerates the CO 2 absorption solution to obtain a semi-lean solution;

a second liquid feed line that extracts the semi-lean solution having a heat resistance temperature thereof or lower from a bottom portion of the high-pressure regeneration tower and introduces a portion of the semi-lean solution into a middle stage of the high-pressure absorption tower to be reused as the CO 2 absorption solution;

a branch line that introduce a rest of the semi-lean solution into a flash drum to obtain a normal-pressure lean solution;

a third liquid feed line that introduces the lean solution after adding pressure thereto into a top of the high-pressure absorption tower to be used as the CO 2 absorption solution;

a high-pressure CO 2 compression device where high-pressure CO 2 gas separated in the high-pressure regeneration tower is introduced; and

a low-pressure CO 2 compression device where low-pressure CO 2 gas separated in the flash drum is introduced.

2. The CO 2 recovery system according to claim 1 , further comprising:

an inert gas separator that separates inert gas between the high-pressure absorption tower and the high-pressure regeneration tower; and

an inert gas introduction line that introduces the separated inert gas into the high-pressure absorption tower.

Assignments (4)
CHANGE OF NAME Recorded Dec 14, 2023
From: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
To: MHI ENGINEERING, LTD.
Reel/Frame 066014/0774 →
NUNC PRO TUNC ASSIGNMENT Recorded Dec 14, 2023
From: MHI ENGINEERING, LTD.
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 066014/0870 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 12, 2018
From: MITSUBISHI HEAVY INDUSTRIES, LTD.
To: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
Reel/Frame 047054/0898 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 9, 2015
From: SEIKI, YOSHIO; HORIZOE, KOUJI; YUKUMOTO, ATSUHIRO; HIRAYAMA, HARUAKI; YUSHIMA, MASAKI
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 034674/0209 →