IP Library Granted Patent US 9,520,818
Granted Patent B2
US 9,520,818 · App. 14/417,689 · Granted Dec 13, 2016

Method for driving emergency generator using energy storage system

Inventors: Young Ger Seo (Seoul, KR); Jeong Min Lee (Seoul, KR); Jin Hee Lee (Gyeonggi-do, KR)
Assignee: HYOSUNG CORPORATION
H02P9/02H02J3/06H02J9/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,520,818
App. No.
14/417,689
Granted
Dec 13, 2016
Kind
B2
Abstract

The present invention relates to a method for driving an emergency generator using an energy storage system in which, when the power of an emergency generator is applied, an energy storage system is allowed to handle the load demand, thereby driving the emergency generator at maximum efficiency. For this purpose, the method for driving an emergency generator using an energy storage system (ESS), including, after an emergency generator has been applied and until the emergency generator reaches a preset maximum efficiency driving state, handling, by an ESS, load demand using previously stored power, and, when the emergency generator reaches the preset maximum efficiency driving state, maintaining the driving of the emergency generator in the maximum efficiency driving state.

Claims (9)

1. A method for driving an emergency generator using an energy storage system (ESS) in a power supply system, in which the ESS and the emergency generator are installed between a commercial power source and a plurality of loads, comprising the following steps:

applying the emergency generator when a supply of power is shut off;

driving the emergency generator at a preset maximum driving efficiency even though an amount of generated power of the emergency generator is smaller or larger than a load demand; and

maintaining driving of the emergency generator in a maximum efficiency driving state, although the load demand is variable while driving the emergency generator at the preset maximum driving efficiency,

wherein the ESS handles an amount of power corresponding to a difference between the variable load demand and the amount of power generated by the emergency generator.

2. The method of claim 1 , wherein after the emergency generator has been applied, a connected state between the emergency generator and one or more loads is continuously maintained.

3. The method of claim 1 , wherein handling, by the ESS, the load demand comprises, if an amount of generated power of the emergency generator is smaller than the load demand, supplying at least an amount of power equal to or larger than a difference between the amount of generated power and the load demand to one or more loads using the power previously stored in the ESS.

4. The method of claim 1 , wherein handling, by the ESS, the load demand comprises, if an amount of generated power of the emergency generator is larger than the load demand, storing surplus power, attributable to the amount of generated power, in the ESS.

5. The method of claim 3 , wherein handling, by the ESS, the load demand comprises, if an amount of generated power of the emergency generator is larger than the load demand, storing surplus power, attributable to the amount of generated power, in the ESS.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 7, 2018
From: HYOSUNG CORPORATION
To: HYOSUNG HEAVY INDUSTRIES CORPORATION
Reel/Frame 047029/0088 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 27, 2015
From: SEO, YOUNG GER; LEE, JEONG MIN; LEE, JIN HEE
To: HYOSUNG CORPORATION
Reel/Frame 034822/0775 →
Priority Claims (1)
KR 10-2012-0082737 · Jul 27, 2012 · national
Continuity (1)
Related Publication 20150288307A1 · Oct 8, 2015