IP Library Granted Patent US 9,885,278
Granted Patent B2
US 9,885,278 · App. 14/432,816 · Granted Feb 6, 2018

Wastegate valve and method for installing a wastegate valve into the turbine housing of an exhaust-gas turbocharger

Inventors: Uemit Dilalan (Mannheim, DE); Christian Roemer (Tiefenthal, DE); Guenter Muench (Carlsberg, DE)
Assignee: Continental Automotive GmbH
F02B37/186F02B37/183F16K1/20Y02T10/144
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,885,278
App. No.
14/432,816
Granted
Feb 6, 2018
Kind
B2
Abstract

A wastegate valve includes a wastegate flap and a wastegate spindle, in which the wastegate flap and the wastegate spindle are constituent parts of a single, unipartite molded body. The molded body furthermore has a connecting arm which is disposed between the wastegate flap and the wastegate spindle and which has a plasticization region. A method for installing an exhaust-gas turbocharger wastegate valve of this type into a turbine housing which has a wastegate duct, is also provided.

Claims (12)

1. A method for installing a wastegate valve into a turbine housing of an exhaust-gas turbocharger having a wastegate duct, the method comprising the following steps:

providing a wastegate flap and a wastegate spindle being constituent parts of a single unipartite molded body having a connecting arm between the wastegate flap and the wastegate spindle and the connecting arm having a predefined plasticization region;

inserting the molded body into the turbine housing;

pushing the wastegate spindle of the molded body through a bushing inserted into a bore of the turbine housing;

fastening the wastegate spindle of the molded body to a counterpart;

heating the predefined plasticization region of the connecting arm disposed between the wastegate flap and the wastegate spindle; and

deforming the connecting arm in the plasticization region by exerting a force on the wastegate flap causing the wastegate flap to fully close the wastegate duct.

2. The method according to claim 1 , which further comprises fastening the wastegate spindle of the molded body to a lever.

3. The method according to claim 1 , which further comprises performing the step of heating the predefined plasticization region of the connecting arm disposed between the wastegate flap and the wastegate spindle by using a laser.

4. The method according to claim 1 , which further comprises performing the heating step by inductively heating the predefined plasticization region of the connecting arm disposed between the wastegate flap and the wastegate spindle.

5. The method according to claim 1 , which further comprises performing the step of heating the predefined plasticization region of the connecting arm disposed between the wastegate flap and the wastegate spindle by using a burner.

6. The method according to claim 1 , which further comprises performing the step of heating the predefined plasticization region of the connecting arm disposed between the wastegate flap and wastegate spindle by using electrodes.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 27, 2020
From: CONTINENTAL AUTOMOTIVE GMBH
To: VITESCO TECHNOLOGIES GMBH
Reel/Frame 053323/0914 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 17, 2015
From: DILALAN, ÜMIT; RÖMER, CHRISTIAN; MÜNCH, GÜNTER
To: CONTINENTAL AUTOMOTIVE GMBH
Reel/Frame 035433/0311 →
Priority Claims (1)
DE 10 2012 217 920 · Oct 1, 2012 · national
Continuity (1)
Related Publication 20150292395A1 · Oct 15, 2015